Somaya Solar Solutions Limited delivers turnkey solar projects in Lemmi, Arunachal Pradesh: one contract that runs from the first survey to a commissioned plant with its approvals in place.

What turnkey means in practice

In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.

  • One price and one schedule covering design, supply, installation and commissioning
  • Approvals and metering paperwork handled by the contractor
  • Defined tests before handover, with drawings, warranties and manuals
  • A named point of contact through the project
  • Operation and maintenance after handover, where contracted

More detail: Turnkey Solar EPC across India.

Steps in a turnkey project in Lemmi

  1. Survey of the site and a study of twelve months of bills
  2. Design, drawings and a fixed-price proposal
  3. Application to the electricity supplier (APDOP) for connection and metering
  4. Equipment supply and installation
  5. Testing, inspection and commissioning
  6. Handover with drawings, warranties and monitoring access

Approvals a turnkey contract covers in Lemmi

In Arunachal Pradesh, grid-connected distributed renewable systems fall under the APERC (Grid Interactive Distributed Renewable Energy System with Net Metering including Group Net Metering and Virtual Net Metering, Net Billing/Net Feed-In, Gross Metering and Its Related Matters) Regulations, 2024, notified on 4 March 2024 and published in the Gazette on 11 March 2024. They replaced the 2016 rooftop regulations.

The size limits, charges and other conditions for Arunachal Pradesh are on the page Turnkey Solar EPC in Arunachal Pradesh.

In Lemmi the application for connection and metering goes to APDOP.

What to expect from the plant in Lemmi

A solar plant in Lemmi is modelled to produce about 1,110 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial, HT, three-phase 11 kV energy charge of ₹4.50 per kWh (APSERC order on Petition TP-10 of 2025, issued 31 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹4.15 per kWh at 33 kV and ₹4.00 at 132 kV, and ₹4.95 on LT. The schedule shows an energy rate only and says a consumer does not pay a minimum charge. Time-of-day billing starts for consumers with maximum demand above 10 kW after smart meters are installed: solar hours from 8 AM to 4 PM at 20% below the normal energy rate and 5 PM to 9 PM at 1.2 times the normal rate. The Commission records that every consumer category is subsidised by the state government. The schedule applies throughout the state.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹4.50 per kWh
100 kW1.1 lakh units1,000 sq m₹5.0 lakh
500 kW5.5 lakh units5,000 sq m₹25.0 lakh
1 MW11.1 lakh units10,000 sq m₹50.0 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Reference projects near Lemmi

These are the Somaya Solar projects closest to Lemmi, with straight-line distances. They are shown as references and are not in Lemmi unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1320 km from Lemmi. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1340 km from Lemmi. Completed, including the transmission line work coordinated with the local distribution company.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1420 km from Lemmi. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Lemmi

Which electricity company handles solar connections in Lemmi?

Department of Power, Government of Arunachal Pradesh (APDOP) is the distribution utility for Arunachal Pradesh and supplies Pakke Kessang district.

Is net metering available for factories and commercial buildings in Lemmi?

Net metering 1 kW to 500 kW; net billing 500 kW to 1 MW; gross metering 1 kW to 1 MW. The rule is the same across Arunachal Pradesh.

How much electricity does a solar plant generate in Lemmi?

About 1,110 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 11.1 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Lemmi?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1560 km from Lemmi in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1320 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Lemmi

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.