Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Along, Arunachal Pradesh. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Along at a glance for solar projects
| District and state | West Siang district, Arunachal Pradesh |
|---|---|
| Electricity supply | Department of Power, Government of Arunachal Pradesh (APDOP) is the distribution utility for Arunachal Pradesh and supplies West Siang district. |
| Electricity regulator | Arunachal Pradesh State Electricity Regulatory Commission (APSERC) |
| State renewable energy agency | Arunachal Pradesh Energy Development Agency (APEDA) |
| Rooftop metering for businesses | Net metering 1 kW to 500 kW; net billing 500 kW to 1 MW; gross metering 1 kW to 1 MW |
| Modelled solar output | about 1,050 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1700 km from Along in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Along
In Arunachal Pradesh, grid-connected distributed renewable systems fall under the APERC (Grid Interactive Distributed Renewable Energy System with Net Metering including Group Net Metering and Virtual Net Metering, Net Billing/Net Feed-In, Gross Metering and Its Related Matters) Regulations, 2024, notified on 4 March 2024 and published in the Gazette on 11 March 2024. They replaced the 2016 rooftop regulations.
The size limits, charges and other conditions for Arunachal Pradesh are on the page Solar EPC Company in Arunachal Pradesh.
In Along the application for connection and metering goes to APDOP.
What a plant produces in Along
A solar plant in Along is modelled to produce about 1,050 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial, HT, three-phase 11 kV energy charge of ₹4.50 per kWh (APSERC order on Petition TP-10 of 2025, issued 31 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹4.15 per kWh at 33 kV and ₹4.00 at 132 kV, and ₹4.95 on LT. The schedule shows an energy rate only and says a consumer does not pay a minimum charge. Time-of-day billing starts for consumers with maximum demand above 10 kW after smart meters are installed: solar hours from 8 AM to 4 PM at 20% below the normal energy rate and 5 PM to 9 PM at 1.2 times the normal rate. The Commission records that every consumer category is subsidised by the state government. The schedule applies throughout the state.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹4.50 per kWh |
|---|---|---|---|
| 100 kW | 1.1 lakh units | 1,000 sq m | ₹4.7 lakh |
| 500 kW | 5.2 lakh units | 5,000 sq m | ₹23.6 lakh |
| 1 MW | 10.5 lakh units | 10,000 sq m | ₹47.2 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Along
The Government of India's One District One Product (ODOP) list names Pineapple as the product of West Siang district.
EPC projects by Somaya Solar near Along
These are the Somaya Solar projects closest to Along, with straight-line distances. They are shown as references and are not in Along unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1460 km from Along. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1520 km from Along. Completed, including the transmission line work coordinated with the local distribution company.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1550 km from Along. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Along
Which electricity company handles solar connections in Along?
Department of Power, Government of Arunachal Pradesh (APDOP) is the distribution utility for Arunachal Pradesh and supplies West Siang district.
Is net metering available for factories and commercial buildings in Along?
Net metering 1 kW to 500 kW; net billing 500 kW to 1 MW; gross metering 1 kW to 1 MW. The rule is the same across Arunachal Pradesh.
How much electricity does a solar plant generate in Along?
About 1,050 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 10.5 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Along?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1700 km from Along in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1460 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Along
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- APERC (Grid Interactive Distributed Renewable Energy System with Net Metering, Group and Virtual Net Metering, Net Billing/Net Feed-In, Gross Metering and Its Related Matters) Regulations, 2024 (Arunachal Pradesh Gazette, 11 March 2024)
- APSERC order on Petition TP-10 of 2025 (31 March 2026), para 1.4
- APSERC order on Petition TP-10 of 2025, issued 31 March 2026 (Table 82 and tariff schedule, Category 5 Industrial; paragraph 6.5 for time-of-day)
- APSERC order on Petition TP-10 of 2025, issued 31 March 2026, which describes APEDA as responsible for non-conventional energy in the state
- Arunachal Pradesh State Electricity Regulatory Commission (APSERC), Itanagar
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- MoHUA PMAY-Urban, List of ULBs (columns: State | District Code | District Name | City Code | Name of City | ULB Type; undated)
- PVGIS, European Commission Joint Research Centre (solar output model)