Somaya Solar Solutions Limited builds ground-mounted solar power plants in Baswa, Rajasthan for businesses that want their own power and for landowners and developers who sell power to the grid.
Output and land for a ground-mounted plant in Baswa
A solar plant in Baswa is modelled to produce about 1,500 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (31°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 1 MW | 15.0 lakh units | 4 to 5 acres |
| 2 MW | 30.0 lakh units | 8 to 10 acres |
| 5 MW | 75.0 lakh units | 20 to 25 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
State policy and open access in Rajasthan
The Rajasthan Integrated Clean Energy Policy, 2024 is the state's current policy for solar and other renewable projects. It stays in force until 29 March 2029 unless another policy replaces it.
Under Rajasthan's Green Energy Open Access Regulations, 2025, a consumer with a contract demand or sanctioned load of 100 kW or more can take renewable power through open access.
The charges, exemptions and conditions for Rajasthan are on the page Ground-Mounted Solar Plant in Rajasthan.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Ground-mounted projects by Somaya Solar near Baswa
These are the Somaya Solar projects closest to Baswa, with straight-line distances. They are shown as references and are not in Baswa unless the line says so.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 270 km from Baswa. In progress. Site access was difficult and was handled with local support.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 530 km from Baswa. Completed, including the transmission line work coordinated with the local distribution company.
Questions about solar projects in Baswa
Which electricity company handles solar connections in Baswa?
Jaipur Vidyut Vitran Nigam Limited (JVVNL) supplies electricity in Dausa district, one of the districts it lists as its area.
How much electricity does a solar plant generate in Baswa?
About 1,500 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 15.0 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Baswa?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 190 km from Baswa in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 270 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Baswa
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- JVVNL website (energy.rajasthan.gov.in/jvvnl), About Us > About Department
- PVGIS, European Commission Joint Research Centre (solar output model)
- RERC (Terms and Conditions for Green Energy Open Access) Regulations, 2025, gazetted 17 July 2025
- Rajasthan Integrated Clean Energy Policy, 2024 (Energy Department, Government of Rajasthan)