Begun at a glance for solar projects

District and stateChittorgarh district, Rajasthan
Electricity supplyAjmer Vidyut Vitran Nigam Limited (AVVNL) supplies electricity in Chittorgarh district, one of the districts it lists as its area.
Electricity regulatorRajasthan Electricity Regulatory Commission (RERC)
State renewable energy agencyRajasthan Renewable Energy Corporation Limited (RREC)
State solar policyRajasthan Integrated Clean Energy Policy, 2024 (in force until 29 March 2029 unless replaced earlier)
Rooftop metering for businessesNet metering up to 1 MW, within the sanctioned load
Modelled solar outputabout 1,430 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 480 km from Begun in a straight line

Solar services in Begun

Local points for solar projects in Begun

The Government of India's One District One Product (ODOP) list names Granite and Marble Products as the product of Chittorgarh district.

Solar output in Begun

A solar plant in Begun is modelled to produce about 1,430 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industrial (HT-5, 11 kV) energy charge of ₹6.50 per unit (RERC tariff order of 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.50 per unit
100 kW1.4 lakh units1,000 sq m₹9.3 lakh
500 kW7.2 lakh units5,000 sq m₹46.5 lakh
1 MW14.3 lakh units10,000 sq m₹93.0 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Begun

For a rooftop array in Begun the strongest month is May, at about 146 units for each kW installed, and the weakest is August, at about 81. For a ground-mounted array at a 30° tilt the strongest month is March (about 151) and the weakest is August (about 77). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January120146
February123141
March144151
April145141
May146132
June122108
July8779
August8177
September104106
October127141
November113135
December113141

Somaya Solar projects near Begun

These are the Somaya Solar projects closest to Begun, with straight-line distances. They are shown as references and are not in Begun unless the line says so.

  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 550 km from Begun. In progress. Site access was difficult and was handled with local support.
  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 560 km from Begun. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 590 km from Begun. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.

See all published projects

Questions about solar projects in Begun

Which electricity company handles solar connections in Begun?

Ajmer Vidyut Vitran Nigam Limited (AVVNL) supplies electricity in Chittorgarh district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Begun?

Net metering up to 1 MW, within the sanctioned load. The rule is the same across Rajasthan.

How much electricity does a solar plant generate in Begun?

About 1,430 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.3 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Begun?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 480 km from Begun in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 550 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Begun

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image