Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Begun, Rajasthan. Most of our published work is megawatt-scale rooftop plants on working industrial sites.

Local points for solar projects in Begun

The Government of India's One District One Product (ODOP) list names Granite and Marble Products as the product of Chittorgarh district.

Metering rules for business rooftops in Begun

In Rajasthan, net metering is open to every consumer category, including commercial and industrial, for loads up to 1 MW or up to the sanctioned load or contract demand, whichever is lower. The regulator set this limit in its order of 7 February 2024; before that it was 500 kW.

The size limits, charges and other conditions for Rajasthan are on the page Commercial & Industrial Solar in Rajasthan.

In Begun the application for connection and metering goes to AVVNL.

Output and bill value for a rooftop plant in Begun

A solar plant in Begun is modelled to produce about 1,430 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industrial (HT-5, 11 kV) energy charge of ₹6.50 per unit (RERC tariff order of 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.50 per unit
100 kW1.4 lakh units1,000 sq m₹9.3 lakh
250 kW3.6 lakh units2,500 sq m₹23.2 lakh
500 kW7.2 lakh units5,000 sq m₹46.5 lakh
1 MW14.3 lakh units10,000 sq m₹93.0 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

How a factory or commercial rooftop project runs

Rooftop plants on working buildings are planned around the roof, the load and the production schedule.

  • Roof check: sheet or concrete, load capacity, shading and safe access
  • Sizing against daytime load and sanctioned demand, within the metering rules above
  • Mounting design to suit the roof, including corrosion protection where the air is harsh
  • Installation in stages so production carries on
  • Testing, metering and connection with the electricity supplier
  • Monitoring and maintenance after handover, where contracted

More detail: Commercial & Industrial Solar across India.

Rooftop projects by Somaya Solar near Begun

These are the Somaya Solar projects closest to Begun, with straight-line distances. They are shown as references and are not in Begun unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 590 km from Begun. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 610 km from Begun. Completed in two months, with five years of operation and maintenance.
  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 630 km from Begun. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.

See all published projects

Questions about solar projects in Begun

Which electricity company handles solar connections in Begun?

Ajmer Vidyut Vitran Nigam Limited (AVVNL) supplies electricity in Chittorgarh district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Begun?

Net metering up to 1 MW, within the sanctioned load. The rule is the same across Rajasthan.

How much electricity does a solar plant generate in Begun?

About 1,430 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.3 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Begun?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 480 km from Begun in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 590 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Begun

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image