Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Belonia, Tripura. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Belonia at a glance for solar projects
| District and state | South Tripura district, Tripura |
|---|---|
| Electricity supply | Tripura State Electricity Corporation Limited (TSECL) is the distribution utility for Tripura and supplies South Tripura district. |
| Electricity regulator | Tripura Electricity Regulatory Commission (TERC) |
| State renewable energy agency | Tripura Renewable Energy Development Agency (TREDA) |
| Rooftop metering for businesses | Net metering up to 10 kWp; group net metering and gross metering above that; surplus is not paid for non-domestic users |
| Modelled solar output | about 1,230 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1520 km from Belonia in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Belonia
In Tripura, rooftop solar for all consumer categories falls under the TERC (Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulations, 2024, published in the Tripura Gazette on 5 July 2024. The First Amendment was notified on 18 December 2025. A Second Amendment was published as a draft on 16 October 2026, and TERC still lists it under draft regulations.
The size limits, charges and other conditions for Tripura are on the page Solar EPC Company in Tripura.
In Belonia the application for connection and metering goes to TSECL.
What a plant produces in Belonia
A solar plant in Belonia is modelled to produce about 1,230 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial, above 100 HP energy charge of ₹8.34 per kWh (TERC tariff order for TSECL for FY 2026-27, dated 4 May 2026, in force from 1 May 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The Industrial category is split by connected horsepower, not by voltage. A fixed charge of ₹280 per kW per month also applies. Time-of-day billing: energy charges are 80% of the normal rate from 9 AM to 5 PM and 140% from 5 PM to 10 PM for industrial users, and normal from 10 PM to 9 AM. A 3% rebate on the bill applies for payment within 5 working days. Bulk Supply is ₹8.66 per kWh with ₹210 per kW per month fixed. The rates exclude taxes and duties. The schedule applies throughout the state.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹8.34 per kWh |
|---|---|---|---|
| 100 kW | 1.2 lakh units | 1,000 sq m | ₹10.3 lakh |
| 500 kW | 6.2 lakh units | 5,000 sq m | ₹51.3 lakh |
| 1 MW | 12.3 lakh units | 10,000 sq m | ₹1.03 crore |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Belonia
The Government of India's One District One Product (ODOP) list names Cashew Nut as the product of South Tripura district.
EPC projects by Somaya Solar near Belonia
These are the Somaya Solar projects closest to Belonia, with straight-line distances. They are shown as references and are not in Belonia unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1130 km from Belonia. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1270 km from Belonia. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1410 km from Belonia. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Belonia
Which electricity company handles solar connections in Belonia?
Tripura State Electricity Corporation Limited (TSECL) is the distribution utility for Tripura and supplies South Tripura district.
Is net metering available for factories and commercial buildings in Belonia?
Net metering up to 10 kWp; group net metering and gross metering above that; surplus is not paid for non-domestic users. The rule is the same across Tripura.
How much electricity does a solar plant generate in Belonia?
About 1,230 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.3 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Belonia?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1520 km from Belonia in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1130 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Belonia
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- MoHUA PMAY-Urban, List of ULBs (columns: State | District Code | District Name | City Code | Name of City | ULB Type; undated)
- PVGIS, European Commission Joint Research Centre (solar output model)
- TERC (Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulations, 2024 (Tripura Gazette, 5 July 2024), First Amendment Regulations, 2025 (notified 18 December 2025); TERC draft Second Amendment of 16 October 2026
- TERC tariff order for TSECL for FY 2026-27, dated 4 May 2026 (tariff schedule, category H Industrial)
- TERC tariff order for TSECL, FY 2026-27 (4 May 2026), para 1.1.1
- Tripura Electricity Regulatory Commission