Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Bhilai, Chhattisgarh. Most of our published work is megawatt-scale rooftop plants on working industrial sites.

Local points for solar projects in Bhilai

The Government of India's One District One Product (ODOP) list names Tomato Based Product as the product of Durg district.

Metering rules for business rooftops in Bhilai

In Chhattisgarh a consumer of CSPDCL, including a commercial or industrial consumer, can install a rooftop solar system under net metering up to 500 kW. The limit was set by the First Amendment of 8 December 2021 to CSERC's Grid Interactive Distributed Renewable Energy Sources Regulations, 2019. The Second Amendment of 6 October 2023 changed the rules for open access and banking, not this limit. Systems above 500 kW go through the captive or open access route.

The size limits, charges and other conditions for Chhattisgarh are on the page Commercial & Industrial Solar in Chhattisgarh.

In Bhilai the application for connection and metering goes to CSPDCL.

Output and bill value for a rooftop plant in Bhilai

A solar plant in Bhilai is modelled to produce about 1,340 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HV-3 Other Industrial (HT, 11 kV, load factor above 15%) energy charge of ₹7.85 per kVAh (CSERC tariff order for CSPDCL, passed 15 June 2026 (corrigendum of 19 June 2026), in force from 1 July 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹7.55 per kVAh at 33 kV, ₹7.10 at 132 kV and ₹6.95 at 220 kV. At 11 kV with a load factor of 15% or less it is ₹8.15, but that row applies only to consumers taking all their supply from CSPDCL. A demand charge also applies each month: ₹400 per kVA, or ₹200 per kVA for the low load factor rows. It is charged on the recorded maximum demand or 85% of the contract demand, whichever is higher. Time-of-day rates apply: 80% of the energy charge from 9 am to 5 pm, 120% from 5 pm to 11 pm and the normal rate from 11 pm to 9 am. A fuel and power purchase adjustment surcharge is added to the energy charge. The steel industry category (HV-4) has its own rates. CSPDCL is the licensee.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.85 per kVAh
100 kW1.3 lakh units1,000 sq m₹10.5 lakh
250 kW3.4 lakh units2,500 sq m₹26.3 lakh
500 kW6.7 lakh units5,000 sq m₹52.6 lakh
1 MW13.4 lakh units10,000 sq m₹1.05 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

How a factory or commercial rooftop project runs

Rooftop plants on working buildings are planned around the roof, the load and the production schedule.

  • Roof check: sheet or concrete, load capacity, shading and safe access
  • Sizing against daytime load and sanctioned demand, within the metering rules above
  • Mounting design to suit the roof, including corrosion protection where the air is harsh
  • Installation in stages so production carries on
  • Testing, metering and connection with the electricity supplier
  • Monitoring and maintenance after handover, where contracted

More detail: Commercial & Industrial Solar across India.

Rooftop projects by Somaya Solar near Bhilai

These are the Somaya Solar projects closest to Bhilai, with straight-line distances. They are shown as references and are not in Bhilai unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 760 km from Bhilai. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 920 km from Bhilai. Completed in two months, with five years of operation and maintenance.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 1030 km from Bhilai. Included net-metering coordination with the local electricity distribution company.

See all published projects

Questions about solar projects in Bhilai

Which electricity company handles solar connections in Bhilai?

Chhattisgarh State Power Distribution Company Limited (CSPDCL) is the state distribution company and supplies Durg district.

Is net metering available for factories and commercial buildings in Bhilai?

Net metering up to 500 kW, within the sanctioned load or contract demand. The rule is the same across Chhattisgarh.

How much electricity does a solar plant generate in Bhilai?

About 1,340 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.4 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Bhilai?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 920 km from Bhilai in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 760 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Bhilai

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.