Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Chhattisgarh.
Chhattisgarh at a glance for solar projects
| Electricity regulator | Chhattisgarh State Electricity Regulatory Commission (CSERC) |
|---|---|
| State renewable energy agency | Chhattisgarh State Renewable Energy Development Agency (CREDA) |
| Electricity distribution | CSPDCL (The state distribution company of Chhattisgarh. The regulator sets its retail tariff for the whole state.) |
| State solar policy | Chhattisgarh State Solar Energy Policy 2017-30 (in force until 31 March 2030 unless replaced earlier) |
| Rooftop metering for businesses | Net metering up to 500 kW, within the sanctioned load or contract demand |
Solar services in Chhattisgarh
- Solar EPC Company in Chhattisgarh
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Chhattisgarh
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Chhattisgarh
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Chhattisgarh
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Chhattisgarh
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Chhattisgarh
One contract from survey to a working plant, with approvals and handover included.
Solar output by place in Chhattisgarh
Solar output changes across Chhattisgarh with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,320 to 1,340 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Bhilai | 1,340 | 1,390 |
| Bilaspur | 1,340 | 1,390 |
| Durg | 1,340 | 1,390 |
| Korba | 1,340 | 1,390 |
| Raigarh | 1,320 | 1,370 |
| Raipur | 1,340 | 1,390 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Places we cover in Chhattisgarh
Questions about solar projects in Chhattisgarh
Is net metering available for factories and commercial buildings in Chhattisgarh?
In Chhattisgarh a consumer of CSPDCL, including a commercial or industrial consumer, can install a rooftop solar system under net metering up to 500 kW. The limit was set by the First Amendment of 8 December 2021 to CSERC's Grid Interactive Distributed Renewable Energy Sources Regulations, 2019. The Second Amendment of 6 October 2023 changed the rules for open access and banking, not this limit. Systems above 500 kW go through the captive or open access route.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Chhattisgarh
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- CSERC Grid Interactive Distributed Renewable Energy Sources Regulations, 2019 (4 October 2019), First Amendment (8 December 2021), Second Amendment (6 October 2023); CSERC Group Net Metering and Virtual Net Metering Guidelines, 2022; Supply Code Fifth Amendment (22 August 2025)
- CSERC order on CSPDCL for FY 2026-27, dated 15 June 2026 (chapter 1: CSPDCL is the distribution company formed when the state electricity board was unbundled)
- Chhattisgarh State Electricity Regulatory Commission
- Chhattisgarh State Solar Energy Policy 2017-30 (Chhattisgarh Rajpatra, 12 December 2025), which names CREDA as the nodal agency
- Chhattisgarh State Solar Energy Policy 2017-30, Chhattisgarh Rajpatra, 12 December 2025 (Energy Department, Government of Chhattisgarh; copy on the CREDA website)
- PVGIS, European Commission Joint Research Centre (solar output model)