Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Korba, Chhattisgarh.

Korba at a glance for solar projects

District and stateKorba district, Chhattisgarh
Electricity supplyChhattisgarh State Power Distribution Company Limited (CSPDCL) is the state distribution company and supplies Korba district.
Electricity regulatorChhattisgarh State Electricity Regulatory Commission (CSERC)
State renewable energy agencyChhattisgarh State Renewable Energy Development Agency (CREDA)
State solar policyChhattisgarh State Solar Energy Policy 2017-30 (in force until 31 March 2030 unless replaced earlier)
Rooftop metering for businessesNet metering up to 500 kW, within the sanctioned load or contract demand
Modelled solar outputabout 1,340 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 880 km from Korba in a straight line

Solar services in Korba

Local points for solar projects in Korba

The Government of India's One District One Product (ODOP) list names Minor Forest Produce - Mahua as the product of Korba district.

Solar output in Korba

A solar plant in Korba is modelled to produce about 1,340 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HV-3 Other Industrial (HT, 11 kV, load factor above 15%) energy charge of ₹7.85 per kVAh (CSERC tariff order for CSPDCL, passed 15 June 2026 (corrigendum of 19 June 2026), in force from 1 July 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹7.55 per kVAh at 33 kV, ₹7.10 at 132 kV and ₹6.95 at 220 kV. At 11 kV with a load factor of 15% or less it is ₹8.15, but that row applies only to consumers taking all their supply from CSPDCL. A demand charge also applies each month: ₹400 per kVA, or ₹200 per kVA for the low load factor rows. It is charged on the recorded maximum demand or 85% of the contract demand, whichever is higher. Time-of-day rates apply: 80% of the energy charge from 9 am to 5 pm, 120% from 5 pm to 11 pm and the normal rate from 11 pm to 9 am. A fuel and power purchase adjustment surcharge is added to the energy charge. The steel industry category (HV-4) has its own rates. CSPDCL is the licensee.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.85 per kVAh
100 kW1.3 lakh units1,000 sq m₹10.5 lakh
500 kW6.7 lakh units5,000 sq m₹52.6 lakh
1 MW13.4 lakh units10,000 sq m₹1.05 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Korba

For a rooftop array in Korba the strongest month is March, at about 139 units for each kW installed, and the weakest is July, at about 77. For a ground-mounted array at a 28° tilt the strongest month is March (about 144) and the weakest is July (about 71). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January119141
February119133
March139144
April139133
May136124
June10493
July7771
August7975
September9191
October115124
November110128
December113136

Somaya Solar projects near Korba

These are the Somaya Solar projects closest to Korba, with straight-line distances. They are shown as references and are not in Korba unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 290 km from Korba. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 680 km from Korba. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 840 km from Korba. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Korba

Which electricity company handles solar connections in Korba?

Chhattisgarh State Power Distribution Company Limited (CSPDCL) is the state distribution company and supplies Korba district.

Is net metering available for factories and commercial buildings in Korba?

Net metering up to 500 kW, within the sanctioned load or contract demand. The rule is the same across Chhattisgarh.

How much electricity does a solar plant generate in Korba?

About 1,340 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.4 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Korba?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 880 km from Korba in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 290 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Korba

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image