Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Korba, Chhattisgarh. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Korba at a glance for solar projects
| District and state | Korba district, Chhattisgarh |
|---|---|
| Electricity supply | Chhattisgarh State Power Distribution Company Limited (CSPDCL) is the state distribution company and supplies Korba district. |
| Electricity regulator | Chhattisgarh State Electricity Regulatory Commission (CSERC) |
| State renewable energy agency | Chhattisgarh State Renewable Energy Development Agency (CREDA) |
| State solar policy | Chhattisgarh State Solar Energy Policy 2017-30 (in force until 31 March 2030 unless replaced earlier) |
| Rooftop metering for businesses | Net metering up to 500 kW, within the sanctioned load or contract demand |
| Modelled solar output | about 1,340 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 880 km from Korba in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Korba
In Chhattisgarh a consumer of CSPDCL, including a commercial or industrial consumer, can install a rooftop solar system under net metering up to 500 kW. The limit was set by the First Amendment of 8 December 2021 to CSERC's Grid Interactive Distributed Renewable Energy Sources Regulations, 2019. The Second Amendment of 6 October 2023 changed the rules for open access and banking, not this limit. Systems above 500 kW go through the captive or open access route.
The size limits, charges and other conditions for Chhattisgarh are on the page Solar EPC Company in Chhattisgarh.
In Korba the application for connection and metering goes to CSPDCL.
What a plant produces in Korba
A solar plant in Korba is modelled to produce about 1,340 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HV-3 Other Industrial (HT, 11 kV, load factor above 15%) energy charge of ₹7.85 per kVAh (CSERC tariff order for CSPDCL, passed 15 June 2026 (corrigendum of 19 June 2026), in force from 1 July 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹7.55 per kVAh at 33 kV, ₹7.10 at 132 kV and ₹6.95 at 220 kV. At 11 kV with a load factor of 15% or less it is ₹8.15, but that row applies only to consumers taking all their supply from CSPDCL. A demand charge also applies each month: ₹400 per kVA, or ₹200 per kVA for the low load factor rows. It is charged on the recorded maximum demand or 85% of the contract demand, whichever is higher. Time-of-day rates apply: 80% of the energy charge from 9 am to 5 pm, 120% from 5 pm to 11 pm and the normal rate from 11 pm to 9 am. A fuel and power purchase adjustment surcharge is added to the energy charge. The steel industry category (HV-4) has its own rates. CSPDCL is the licensee.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹7.85 per kVAh |
|---|---|---|---|
| 100 kW | 1.3 lakh units | 1,000 sq m | ₹10.5 lakh |
| 500 kW | 6.7 lakh units | 5,000 sq m | ₹52.6 lakh |
| 1 MW | 13.4 lakh units | 10,000 sq m | ₹1.05 crore |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Korba
The Government of India's One District One Product (ODOP) list names Minor Forest Produce - Mahua as the product of Korba district.
EPC projects by Somaya Solar near Korba
These are the Somaya Solar projects closest to Korba, with straight-line distances. They are shown as references and are not in Korba unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 290 km from Korba. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 680 km from Korba. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 840 km from Korba. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Korba
Which electricity company handles solar connections in Korba?
Chhattisgarh State Power Distribution Company Limited (CSPDCL) is the state distribution company and supplies Korba district.
Is net metering available for factories and commercial buildings in Korba?
Net metering up to 500 kW, within the sanctioned load or contract demand. The rule is the same across Chhattisgarh.
How much electricity does a solar plant generate in Korba?
About 1,340 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.4 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Korba?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 880 km from Korba in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 290 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Korba
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- CSERC Grid Interactive Distributed Renewable Energy Sources Regulations, 2019 (4 October 2019), First Amendment (8 December 2021), Second Amendment (6 October 2023); CSERC Group Net Metering and Virtual Net Metering Guidelines, 2022; Supply Code Fifth Amendment (22 August 2025)
- CSERC tariff order for CSPDCL, FY 2026-30 (chapter 1)
- CSERC tariff schedule for FY 2026-27, clause 1.2.3 (HV-3); order of 15 June 2026 and corrigendum of 19 June 2026
- Chhattisgarh State Electricity Regulatory Commission
- Chhattisgarh State Solar Energy Policy 2017-30 (Chhattisgarh Rajpatra, 12 December 2025), which names CREDA as the nodal agency
- Chhattisgarh State Solar Energy Policy 2017-30, Chhattisgarh Rajpatra, 12 December 2025 (Energy Department, Government of Chhattisgarh; copy on the CREDA website)
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- MoHUA PMAY-Urban, "Details of Urban Local bodies and Areas under ..." (List-of-ULB.pdf), row: State | District code | District | City code | ULB name | ULB type
- PVGIS, European Commission Joint Research Centre (solar output model)