Somaya Solar Solutions Limited delivers turnkey solar projects in Chhattisgarh: one contract that runs from the first survey to a commissioned plant with its approvals in place.
What turnkey means in practice
In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.
- One price and one schedule covering design, supply, installation and commissioning
- Approvals and metering paperwork handled by the contractor
- Defined tests before handover, with drawings, warranties and manuals
- A named point of contact through the project
- Operation and maintenance after handover, where contracted
More detail: Turnkey Solar EPC across India.
Steps in a turnkey project in Chhattisgarh
- Survey of the site and a study of twelve months of bills
- Design, drawings and a fixed-price proposal
- Application to the electricity supplier for connection and metering
- Equipment supply and installation
- Testing, inspection and commissioning
- Handover with drawings, warranties and monitoring access
Approvals a turnkey contract covers in Chhattisgarh
In Chhattisgarh a consumer of CSPDCL, including a commercial or industrial consumer, can install a rooftop solar system under net metering up to 500 kW. The limit was set by the First Amendment of 8 December 2021 to CSERC's Grid Interactive Distributed Renewable Energy Sources Regulations, 2019. The Second Amendment of 6 October 2023 changed the rules for open access and banking, not this limit. Systems above 500 kW go through the captive or open access route.
- The plant may not be larger than the consumer's sanctioned load or contract demand. The smallest system is 1 kW.
- Any consumer in the licensee's area may use net metering, first come first served. One consumer may have two or more systems if they share a single injection point to the grid.
- Surplus energy offsets the licensee's supply in the billing period. The settlement period runs from 1 April to 31 March, and carried-forward energy resets to zero each April. At the end of the period the licensee buys any excess at the lowest rooftop solar tariff found by competitive bidding in the last financial year.
- Fixed or demand charges and government levies are still payable. Where the tariff is in kVAh, the readings are taken in kVAh.
- Net metered systems do not pay wheeling, cross-subsidy, transmission, distribution or banking charges.
- The rooftop capacity connected to one distribution transformer may not exceed 100% of that transformer's capacity.
- Group net metering is open to all consumers, up to 500 kW. Virtual net metering, under the guidelines of 22 December 2022, is limited to residential consumers, group housing societies and government or local authority establishments, so it does not cover commercial or industrial consumers.
- For rooftop systems up to 10 kW, no technical feasibility study is made, and the contract demand is treated as raised if it is below the plant size (Supply Code, Fifth Amendment, 22 August 2025).
What to expect from the plant in Chhattisgarh
Solar output changes across Chhattisgarh with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,320 to 1,340 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Bhilai | 1,340 | 1,390 |
| Bilaspur | 1,340 | 1,390 |
| Durg | 1,340 | 1,390 |
| Korba | 1,340 | 1,390 |
| Raigarh | 1,320 | 1,370 |
| Raipur | 1,340 | 1,390 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Questions about solar projects in Chhattisgarh
Is net metering available for factories and commercial buildings in Chhattisgarh?
In Chhattisgarh a consumer of CSPDCL, including a commercial or industrial consumer, can install a rooftop solar system under net metering up to 500 kW. The limit was set by the First Amendment of 8 December 2021 to CSERC's Grid Interactive Distributed Renewable Energy Sources Regulations, 2019. The Second Amendment of 6 October 2023 changed the rules for open access and banking, not this limit. Systems above 500 kW go through the captive or open access route.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Chhattisgarh
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- CSERC Grid Interactive Distributed Renewable Energy Sources Regulations, 2019 (4 October 2019), First Amendment (8 December 2021), Second Amendment (6 October 2023); CSERC Group Net Metering and Virtual Net Metering Guidelines, 2022; Supply Code Fifth Amendment (22 August 2025)
- PVGIS, European Commission Joint Research Centre (solar output model)