Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Chhattisgarh as an EPC contractor: engineering, supply, construction and commissioning.
What Chhattisgarh's policy says about large solar plants
The Chhattisgarh State Solar Energy Policy 2017-30 is the state's current solar policy. The state issued it in the Chhattisgarh Rajpatra of 12 December 2025, after amending the earlier 2017-27 policy. It stays in force until 31 March 2030 unless a new policy replaces it.
- The policy stays in force until 31 March 2030 or until a new solar policy replaces it. It replaced the order of 9 November 2020 and includes the amendments made on 4 November 2025.
- CREDA is the nodal agency and the single window for approval of solar projects.
- Any person or company may set up a solar plant for captive use or for sale of power. A plant set up under the captive or open access category has a minimum size of 500 kW.
- Solar projects pay no electricity duty on their own use and captive use in the state, if set up by March 2030. The policy gives 100% banking each financial year, with wheeling, transmission, cross-subsidy and banking charges as in the regulator's regulations.
- Grid connectivity is available to rooftop plants of 1 kW or more. A project must be completed within 36 months.
In Chhattisgarh the rules for renewable energy through the grid are spread over several documents: CSERC's Distributed Renewable Energy Sources Regulations (as amended in 2021 and 2023), its Intra-State Open Access Regulations (as amended in 2023 and 2026) and the yearly tariff order. The points below are taken from those documents.
- A consumer with a contract demand or sanctioned load of 100 kW or more, on one connection or on several in the same electricity division, may ask the licensee to supply renewable energy. The request must be for at least one year. Captive users are not covered by this clause.
- For wheeling to a captive or open access consumer, a new distributed renewable plant must be at least 100 kW, counted over one or several connections in the same electricity division. There is no upper limit on its size. Before the 2023 amendment the limit was 2.5 times the contract demand.
- Solar plants of up to 500 kW do not need a dedicated feeder, RTU or ABT meters. Under the Third Amendment of 18 March 2026, a consumer without a dedicated feeder can buy power through open access from solar projects inside the state, subject to any load restriction.
- Plants in the first 500 MW, or commissioned by 27 December 2023, pay no transmission, wheeling, cross-subsidy or SLDC charges for their whole useful life. Newer plants pay the transmission, wheeling and cross-subsidy charges set in the tariff order.
- Banking charge is 2% of banked energy, taken in kind, with the banking year from April to March. Energy taken back in the evening peak (6 pm to 11 pm) carries a withdrawal charge of 30% of the energy drawn in peak hours. For newer plants, banking is at least monthly, at least 30% of monthly consumption may be banked, and unused credit is not carried to the next banking cycle.
- The tariff order for 2026-27 sets the cross-subsidy surcharge at ₹1.43 per unit at 11 kV, 33 kV and low voltage, and ₹1.23 per unit at 220 kV and above. For 132 kV the tariff schedule gives ₹1.23 and the detailed order gives ₹1.22. The surcharge is capped at 20% of the average cost of supply. For captive use it applies only if the users fail the captive test of the Electricity Rules, 2005.
- Wheeling charge for 2026-27 is ₹0.2605 per unit at 33 kV and ₹0.7443 per unit below 33 kV. Distribution losses of 6% are recovered for energy at 33 kV or 11 kV. Transmission losses are 3.29%.
- Solar plants in the state that reach commercial operation after 27 December 2023 and by 31 December 2026 pay 33% of the transmission charges for seven years, when selling through long-term or medium-term open access. Plants that start after 31 December 2026 pay 100%.
Output and land at megawatt scale in Chhattisgarh
Solar output changes across Chhattisgarh with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,370 to 1,390 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Bhilai | 1,340 | 1,390 |
| Bilaspur | 1,340 | 1,390 |
| Durg | 1,340 | 1,390 |
| Korba | 1,340 | 1,390 |
| Raigarh | 1,320 | 1,370 |
| Raipur | 1,340 | 1,390 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Questions about solar projects in Chhattisgarh
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Chhattisgarh
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- CSERC tariff schedule for FY 2026-27 (clause 1.3, open access charges), with the corrigendum of 19 June 2026; CSERC DRE (Second Amendment) Regulations, 2023; CSERC Open Access (Third Amendment) Regulations, 2026
- Chhattisgarh State Solar Energy Policy 2017-30, Chhattisgarh Rajpatra, 12 December 2025 (Energy Department, Government of Chhattisgarh; copy on the CREDA website)
- PVGIS, European Commission Joint Research Centre (solar output model)