Commercial and Industrial Rooftop Solar in Chhattisgarh

Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Chhattisgarh. Most of our published work is megawatt-scale rooftop plants on working industrial sites.

Metering rules for business rooftops in Chhattisgarh

In Chhattisgarh a consumer of CSPDCL, including a commercial or industrial consumer, can install a rooftop solar system under net metering up to 500 kW. The limit was set by the First Amendment of 8 December 2021 to CSERC's Grid Interactive Distributed Renewable Energy Sources Regulations, 2019. The Second Amendment of 6 October 2023 changed the rules for open access and banking, not this limit. Systems above 500 kW go through the captive or open access route.

  • The plant may not be larger than the consumer's sanctioned load or contract demand. The smallest system is 1 kW.
  • Any consumer in the licensee's area may use net metering, first come first served. One consumer may have two or more systems if they share a single injection point to the grid.
  • Surplus energy offsets the licensee's supply in the billing period. The settlement period runs from 1 April to 31 March, and carried-forward energy resets to zero each April. At the end of the period the licensee buys any excess at the lowest rooftop solar tariff found by competitive bidding in the last financial year.
  • Fixed or demand charges and government levies are still payable. Where the tariff is in kVAh, the readings are taken in kVAh.
  • Net metered systems do not pay wheeling, cross-subsidy, transmission, distribution or banking charges.
  • The rooftop capacity connected to one distribution transformer may not exceed 100% of that transformer's capacity.
  • Group net metering is open to all consumers, up to 500 kW. Virtual net metering, under the guidelines of 22 December 2022, is limited to residential consumers, group housing societies and government or local authority establishments, so it does not cover commercial or industrial consumers.
  • For rooftop systems up to 10 kW, no technical feasibility study is made, and the contract demand is treated as raised if it is below the plant size (Supply Code, Fifth Amendment, 22 August 2025).

Output and bill value for a rooftop plant in Chhattisgarh

Solar output changes across Chhattisgarh with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,320 to 1,340 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Bhilai1,3401,390
Bilaspur1,3401,390
Durg1,3401,390
Korba1,3401,390
Raigarh1,3201,370
Raipur1,3401,390

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

How a factory or commercial rooftop project runs

Rooftop plants on working buildings are planned around the roof, the load and the production schedule.

  • Roof check: sheet or concrete, load capacity, shading and safe access
  • Sizing against daytime load and sanctioned demand, within the metering rules above
  • Mounting design to suit the roof, including corrosion protection where the air is harsh
  • Installation in stages so production carries on
  • Testing, metering and connection with the electricity supplier
  • Monitoring and maintenance after handover, where contracted

More detail: Commercial & Industrial Solar across India.

Questions about solar projects in Chhattisgarh

Is net metering available for factories and commercial buildings in Chhattisgarh?

In Chhattisgarh a consumer of CSPDCL, including a commercial or industrial consumer, can install a rooftop solar system under net metering up to 500 kW. The limit was set by the First Amendment of 8 December 2021 to CSERC's Grid Interactive Distributed Renewable Energy Sources Regulations, 2019. The Second Amendment of 6 October 2023 changed the rules for open access and banking, not this limit. Systems above 500 kW go through the captive or open access route.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Chhattisgarh

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.