Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Bhilwara, Rajasthan. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Bhilwara at a glance for solar projects
| District and state | Bhilwara district, Rajasthan |
|---|---|
| Electricity supply | Ajmer Vidyut Vitran Nigam Limited (AVVNL, the Ajmer Discom) supplies electricity in Bhilwara district, one of the 14 districts it lists as its area. |
| Electricity regulator | Rajasthan Electricity Regulatory Commission (RERC) |
| State renewable energy agency | Rajasthan Renewable Energy Corporation Limited (RREC) |
| State solar policy | Rajasthan Integrated Clean Energy Policy, 2024 (in force until 29 March 2029 unless replaced earlier) |
| Rooftop metering for businesses | Net metering up to 1 MW, within the sanctioned load |
| Modelled solar output | about 1,440 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 460 km from Bhilwara in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Bhilwara
In Rajasthan, net metering is open to every consumer category, including commercial and industrial, for loads up to 1 MW or up to the sanctioned load or contract demand, whichever is lower. The regulator set this limit in its order of 7 February 2024; before that it was 500 kW.
The size limits, charges and other conditions for Rajasthan are on the page Solar EPC Company in Rajasthan.
In Bhilwara the application for connection and metering goes to AVVNL.
What a plant produces in Bhilwara
A solar plant in Bhilwara is modelled to produce about 1,440 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industrial (HT-5, 11 kV) energy charge of ₹6.50 per unit (RERC tariff order of 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.50 per unit |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹9.4 lakh |
| 500 kW | 7.2 lakh units | 5,000 sq m | ₹46.8 lakh |
| 1 MW | 14.4 lakh units | 10,000 sq m | ₹93.6 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Bhilwara: industrial areas
RIICO, the Rajasthan State Industrial Development and Investment Corporation, lists Bhilwara Phases 1 to 4 and Bhilwara Extension among the industrial areas of its Bhilwara unit office. The same office also covers the Growth Centre at Hamirgarh.
The Government of India's One District One Product (ODOP) list names Textile Products as the product of Bhilwara district.
EPC projects by Somaya Solar near Bhilwara
These are the Somaya Solar projects closest to Bhilwara, with straight-line distances. They are shown as references and are not in Bhilwara unless the line says so.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 550 km from Bhilwara. In progress. Site access was difficult and was handled with local support.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 590 km from Bhilwara. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 610 km from Bhilwara. Completed, including the transmission line work coordinated with the local distribution company.
Questions about solar projects in Bhilwara
Which electricity company handles solar connections in Bhilwara?
Ajmer Vidyut Vitran Nigam Limited (AVVNL, the Ajmer Discom) supplies electricity in Bhilwara district, one of the 14 districts it lists as its area.
Is net metering available for factories and commercial buildings in Bhilwara?
Net metering up to 1 MW, within the sanctioned load. The rule is the same across Rajasthan.
How much electricity does a solar plant generate in Bhilwara?
About 1,440 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.4 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Bhilwara?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 460 km from Bhilwara in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 550 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Bhilwara
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- AVVNL website: About Department (districts served)
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)
- RERC rooftop (grid-interactive distributed renewable energy) regulations, 2021, with amendments to December 2025, and RERC order of 7 February 2024
- RERC tariff order for 2026-27, dated 30 March 2026
- RIICO: layout plans of industrial areas, listed by unit office (updated 3 September 2026)
- Rajasthan Electricity Regulatory Commission
- Rajasthan Integrated Clean Energy Policy, 2024 (Energy Department, Government of Rajasthan)
- Rajasthan State Open School, Jaipur: list of AI Centres 2026-2027