Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Rajasthan. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Rajasthan at a glance for solar projects
| Electricity regulator | Rajasthan Electricity Regulatory Commission (RERC) |
|---|---|
| State renewable energy agency | Rajasthan Renewable Energy Corporation Limited (RREC) |
| Electricity distribution | JVVNL (Jaipur, Alwar, Bhiwadi, Bharatpur, Kota and the east of the state); AVVNL (Ajmer, Udaipur, Bhilwara, Sikar and the central and southern districts); JdVVNL (Jodhpur, Bikaner, Jaisalmer, Barmer and the west); KEDL (distribution franchisee of JVVNL for Kota city); BkESL (distribution franchisee of JdVVNL for Bikaner city); TPADL (distribution franchisee of AVVNL for Ajmer city); BESL (distribution franchisee of JVVNL for Bharatpur city) |
| State solar policy | Rajasthan Integrated Clean Energy Policy, 2024 (in force until 29 March 2029 unless replaced earlier) |
| Rooftop metering for businesses | Net metering up to 1 MW, within the sanctioned load |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Rajasthan
In Rajasthan, net metering is open to every consumer category, including commercial and industrial, for loads up to 1 MW or up to the sanctioned load or contract demand, whichever is lower. The regulator set this limit in its order of 7 February 2024; before that it was 500 kW.
- Net billing and gross metering are the other arrangements under the same regulations.
- The plant may not be larger than 100% of the consumer's sanctioned load or contract demand.
- The total rooftop capacity connected to one distribution transformer may not exceed 80% of that transformer's capacity.
- Group and virtual net metering were added by the third amendment, notified on 3 December 2025.
- A plant above 1 MW is outside these regulations and goes through the captive or open access route.
What a plant produces in Rajasthan
Solar output changes across Rajasthan with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,340 to 1,560 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Abu | 1,420 | 1,490 |
| Abu Road | 1,410 | 1,480 |
| Ajmer | 1,460 | 1,540 |
| Aklera | 1,380 | 1,450 |
| Alwar | 1,420 | 1,500 |
| Anta | 1,400 | 1,470 |
| Anupgarh | 1,500 | 1,600 |
| Bagru | 1,440 | 1,530 |
| Balotra | 1,490 | 1,570 |
| Bandikui | 1,420 | 1,500 |
| Banswara | 1,380 | 1,450 |
| Baran | 1,400 | 1,470 |
| Barmer | 1,510 | 1,590 |
| Baswa | 1,420 | 1,500 |
| Bayana | 1,420 | 1,500 |
| Beawar | 1,460 | 1,540 |
| Begun | 1,430 | 1,500 |
| Behror | 1,430 | 1,520 |
| Bhadra | 1,470 | 1,560 |
| Bharatpur | 1,420 | 1,500 |
| Bhilwara | 1,440 | 1,510 |
| Bhinmal | 1,450 | 1,520 |
| Bhiwadi | 1,430 | 1,520 |
| Bidasar | 1,490 | 1,580 |
| Bikaner | 1,520 | 1,610 |
| Bilara | 1,470 | 1,550 |
| Bissau | 1,470 | 1,570 |
| Bundi | 1,420 | 1,490 |
| Chaksu | 1,440 | 1,520 |
| Chhabra | 1,390 | 1,450 |
| Chidawa | 1,450 | 1,540 |
| Chittorgarh | 1,430 | 1,500 |
| Churu | 1,480 | 1,570 |
| Dausa | 1,430 | 1,510 |
| Deoli | 1,430 | 1,510 |
| Dhaulpur | 1,410 | 1,480 |
| Dig | 1,420 | 1,500 |
| Dungarpur | 1,420 | 1,480 |
| Falna | 1,450 | 1,520 |
| Fatehnagar | 1,440 | 1,510 |
| Fatehpur | 1,480 | 1,570 |
| Gangapur | 1,420 | 1,500 |
| Gulabpura | 1,450 | 1,520 |
| Hanumangarh | 1,460 | 1,550 |
| Hindaun | 1,420 | 1,500 |
| Jahazpur | 1,430 | 1,500 |
| Jaipur | 1,440 | 1,530 |
| Jaisalmer | 1,560 | 1,650 |
| Jaitaran | 1,460 | 1,540 |
| Jalor | 1,460 | 1,530 |
| Jhalawar | 1,400 | 1,460 |
| Jhalrapatan | 1,400 | 1,460 |
| Jhunjhunun | 1,460 | 1,550 |
| Jodhpur | 1,480 | 1,560 |
| Kaithoon | 1,410 | 1,480 |
| Kaman | 1,420 | 1,500 |
| Kapasan | 1,430 | 1,500 |
| Kapren | 1,410 | 1,480 |
| Karanpur | 1,480 | 1,570 |
| Karauli | 1,420 | 1,490 |
| Kekri | 1,430 | 1,510 |
| Keshorai Patan | 1,420 | 1,490 |
| Khandela | 1,450 | 1,540 |
| Kishangarh | 1,450 | 1,540 |
| Kota | 1,420 | 1,490 |
| Kotputli | 1,430 | 1,520 |
| Kuchera | 1,480 | 1,560 |
| Kumher | 1,420 | 1,500 |
| Lakheri | 1,410 | 1,490 |
| Lalsot | 1,430 | 1,510 |
| Losal | 1,480 | 1,560 |
| Mahwa | 1,420 | 1,500 |
| Malpura | 1,440 | 1,520 |
| Mandal | 1,440 | 1,510 |
| Mandalgarh | 1,430 | 1,510 |
| Mandawa | 1,470 | 1,560 |
| Mangrol | 1,400 | 1,470 |
| Merta | 1,470 | 1,550 |
| Nadbai | 1,420 | 1,500 |
| Nagaur | 1,500 | 1,580 |
| Nasirabad | 1,460 | 1,540 |
| Nathdwara | 1,450 | 1,520 |
| Nawalgarh | 1,460 | 1,550 |
| Neem ka Thana | 1,450 | 1,540 |
| Neemrana | 1,430 | 1,520 |
| Nimbahera | 1,420 | 1,490 |
| Niwai | 1,340 | 1,410 |
| Nohar | 1,470 | 1,570 |
| Nokha | 1,520 | 1,610 |
| Pali | 1,460 | 1,540 |
| Phalodi | 1,540 | 1,620 |
| Pilani | 1,450 | 1,540 |
| Pilibangan | 1,470 | 1,570 |
| Pindwara | 1,430 | 1,500 |
| Pokaran | 1,540 | 1,620 |
| Pratapgarh | 1,400 | 1,460 |
| Pushkar | 1,460 | 1,540 |
| Raisinghnagar | 1,480 | 1,580 |
| Rajakhera | 1,410 | 1,490 |
| Rajaldesar | 1,500 | 1,590 |
| Rajsamand | 1,450 | 1,520 |
| Ramganj Mandi | 1,410 | 1,470 |
| Ratangarh | 1,490 | 1,580 |
| Rawatbhata | 1,420 | 1,490 |
| Rawatsar | 1,470 | 1,560 |
| Sadri | 1,450 | 1,530 |
| Sadulshahar | 1,460 | 1,560 |
| Sagwara | 1,390 | 1,450 |
| Sambhar | 1,460 | 1,540 |
| Sanchor | 1,450 | 1,520 |
| Sangod | 1,400 | 1,470 |
| Sardarshahr | 1,500 | 1,590 |
| Sarwar | 1,440 | 1,520 |
| Sawai Madhopur | 1,410 | 1,490 |
| Sawar | 1,430 | 1,500 |
| Sheoganj | 1,440 | 1,510 |
| Sikar | 1,470 | 1,550 |
| Sirohi | 1,430 | 1,500 |
| Siwana | 1,480 | 1,560 |
| Sojat | 1,460 | 1,540 |
| Sri Dungargarh | 1,500 | 1,590 |
| Sri Ganganagar | 1,470 | 1,560 |
| Sri Madhopur | 1,450 | 1,540 |
| Sujangarh | 1,490 | 1,580 |
| Suket | 1,400 | 1,470 |
| Sumerpur | 1,440 | 1,510 |
| Surajgarh | 1,450 | 1,540 |
| Suratgarh | 1,480 | 1,570 |
| Taranagar | 1,470 | 1,570 |
| Todabhim | 1,420 | 1,490 |
| Todaraisingh | 1,430 | 1,510 |
| Tonk | 1,430 | 1,510 |
| Udaipur | 1,430 | 1,500 |
| Udaipurwati | 1,460 | 1,550 |
| Viratnagar | 1,440 | 1,520 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Questions about solar projects in Rajasthan
Is net metering available for factories and commercial buildings in Rajasthan?
In Rajasthan, net metering is open to every consumer category, including commercial and industrial, for loads up to 1 MW or up to the sanctioned load or contract demand, whichever is lower. The regulator set this limit in its order of 7 February 2024; before that it was 500 kW.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Rajasthan
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 17 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- Energy Department, Government of Rajasthan (distribution companies)
- PVGIS, European Commission Joint Research Centre (solar output model)
- RERC rooftop (grid-interactive distributed renewable energy) regulations, 2021, with amendments to December 2025, and RERC order of 7 February 2024
- Rajasthan Electricity Regulatory Commission
- Rajasthan Integrated Clean Energy Policy, 2024 (Energy Department, Government of Rajasthan)