Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Bikaner, Rajasthan.

Bikaner at a glance for solar projects

District and stateBikaner district, Rajasthan
Electricity supplyBikaner Electricity Supply Limited (BkESL) has run electricity distribution in Bikaner city since 1 May 2017 as the distribution franchisee of Jodhpur Vidyut Vitran Nigam Limited (JdVVNL), which holds the licence.
Electricity regulatorRajasthan Electricity Regulatory Commission (RERC)
State renewable energy agencyRajasthan Renewable Energy Corporation Limited (RREC)
State solar policyRajasthan Integrated Clean Energy Policy, 2024 (in force until 29 March 2029 unless replaced earlier)
Rooftop metering for businessesNet metering up to 1 MW, within the sanctioned load
Modelled solar outputabout 1,520 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 410 km from Bikaner in a straight line

Solar services in Bikaner

Bikaner: industrial areas

RIICO, the Rajasthan State Industrial Development and Investment Corporation, lists Bichhwal, Bichhwal 2nd, Karni and Karni Extension among the industrial areas of its Bikaner unit office. The same office also covers towns such as Nokha and Khajuwala.

The Government of India's One District One Product (ODOP) list names Bikaneri Namkeen as the product of Bikaner district.

Solar output in Bikaner

A solar plant in Bikaner is modelled to produce about 1,520 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industrial (HT-5, 11 kV) energy charge of ₹6.50 per unit (RERC tariff order of 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.50 per unit
100 kW1.5 lakh units1,000 sq m₹9.9 lakh
500 kW7.6 lakh units5,000 sq m₹49.4 lakh
1 MW15.2 lakh units10,000 sq m₹98.8 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Bikaner

For a rooftop array in Bikaner the strongest month is May, at about 152 units for each kW installed, and the weakest is December, at about 110. For a ground-mounted array at a 31° tilt the strongest month is March (about 152) and the weakest is July (about 112). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January114144
February119139
March142152
April148144
May152139
June137122
July123112
August118112
September118122
October127144
November111137
December110142

Somaya Solar projects near Bikaner

These are the Somaya Solar projects closest to Bikaner, with straight-line distances. They are shown as references and are not in Bikaner unless the line says so.

  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 510 km from Bikaner. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 510 km from Bikaner. In progress. Site access was difficult and was handled with local support.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 520 km from Bikaner. Included net-metering coordination with the local electricity distribution company.

See all published projects

Questions about solar projects in Bikaner

Which electricity company handles solar connections in Bikaner?

Bikaner Electricity Supply Limited (BkESL) has run electricity distribution in Bikaner city since 1 May 2017 as the distribution franchisee of Jodhpur Vidyut Vitran Nigam Limited (JdVVNL), which holds the licence.

Is net metering available for factories and commercial buildings in Bikaner?

Net metering up to 1 MW, within the sanctioned load. The rule is the same across Rajasthan.

How much electricity does a solar plant generate in Bikaner?

About 1,520 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 15.2 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Bikaner?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 410 km from Bikaner in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 510 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Bikaner

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image