Somaya Solar Solutions Limited delivers turnkey solar projects in Bikaner, Rajasthan: one contract that runs from the first survey to a commissioned plant with its approvals in place.
What turnkey means in practice
In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.
- One price and one schedule covering design, supply, installation and commissioning
- Approvals and metering paperwork handled by the contractor
- Defined tests before handover, with drawings, warranties and manuals
- A named point of contact through the project
- Operation and maintenance after handover, where contracted
More detail: Turnkey Solar EPC across India.
Steps in a turnkey project in Bikaner
- Survey of the site and a study of twelve months of bills
- Design, drawings and a fixed-price proposal
- Application to the electricity supplier (BkESL / JdVVNL) for connection and metering
- Equipment supply and installation
- Testing, inspection and commissioning
- Handover with drawings, warranties and monitoring access
Approvals a turnkey contract covers in Bikaner
In Rajasthan, net metering is open to every consumer category, including commercial and industrial, for loads up to 1 MW or up to the sanctioned load or contract demand, whichever is lower. The regulator set this limit in its order of 7 February 2024; before that it was 500 kW.
The size limits, charges and other conditions for Rajasthan are on the page Turnkey Solar EPC in Rajasthan.
Bikaner's supply is run by BkESL, so that is the company to ask first about connecting a rooftop plant in the city. The licence stays with JdVVNL. Ask for the current steps before you apply, because the process for a commercial or industrial connection can change.
What to expect from the plant in Bikaner
A solar plant in Bikaner is modelled to produce about 1,520 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industrial (HT-5, 11 kV) energy charge of ₹6.50 per unit (RERC tariff order of 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.50 per unit |
|---|---|---|---|
| 100 kW | 1.5 lakh units | 1,000 sq m | ₹9.9 lakh |
| 500 kW | 7.6 lakh units | 5,000 sq m | ₹49.4 lakh |
| 1 MW | 15.2 lakh units | 10,000 sq m | ₹98.8 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Reference projects near Bikaner
These are the Somaya Solar projects closest to Bikaner, with straight-line distances. They are shown as references and are not in Bikaner unless the line says so.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 510 km from Bikaner. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 510 km from Bikaner. In progress. Site access was difficult and was handled with local support.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 520 km from Bikaner. Included net-metering coordination with the local electricity distribution company.
Questions about solar projects in Bikaner
Which electricity company handles solar connections in Bikaner?
Bikaner Electricity Supply Limited (BkESL) has run electricity distribution in Bikaner city since 1 May 2017 as the distribution franchisee of Jodhpur Vidyut Vitran Nigam Limited (JdVVNL), which holds the licence.
Is net metering available for factories and commercial buildings in Bikaner?
Net metering up to 1 MW, within the sanctioned load. The rule is the same across Rajasthan.
How much electricity does a solar plant generate in Bikaner?
About 1,520 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 15.2 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Bikaner?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 410 km from Bikaner in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 510 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Bikaner
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 17 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- CESC Rajasthan website: About
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)
- RERC rooftop (grid-interactive distributed renewable energy) regulations, 2021, with amendments to December 2025, and RERC order of 7 February 2024
- RERC tariff order for 2026-27, dated 30 March 2026