Somaya Solar Solutions Limited delivers turnkey solar projects in Rajasthan: one contract that runs from the first survey to a commissioned plant with its approvals in place.

What turnkey means in practice

In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.

  • One price and one schedule covering design, supply, installation and commissioning
  • Approvals and metering paperwork handled by the contractor
  • Defined tests before handover, with drawings, warranties and manuals
  • A named point of contact through the project
  • Operation and maintenance after handover, where contracted

More detail: Turnkey Solar EPC across India.

Steps in a turnkey project in Rajasthan

  1. Survey of the site and a study of twelve months of bills
  2. Design, drawings and a fixed-price proposal
  3. Application to the electricity supplier for connection and metering
  4. Equipment supply and installation
  5. Testing, inspection and commissioning
  6. Handover with drawings, warranties and monitoring access

Approvals a turnkey contract covers in Rajasthan

In Rajasthan, net metering is open to every consumer category, including commercial and industrial, for loads up to 1 MW or up to the sanctioned load or contract demand, whichever is lower. The regulator set this limit in its order of 7 February 2024; before that it was 500 kW.

  • Net billing and gross metering are the other arrangements under the same regulations.
  • The plant may not be larger than 100% of the consumer's sanctioned load or contract demand.
  • The total rooftop capacity connected to one distribution transformer may not exceed 80% of that transformer's capacity.
  • Group and virtual net metering were added by the third amendment, notified on 3 December 2025.
  • A plant above 1 MW is outside these regulations and goes through the captive or open access route.

What to expect from the plant in Rajasthan

Solar output changes across Rajasthan with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,340 to 1,560 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Abu1,4201,490
Abu Road1,4101,480
Ajmer1,4601,540
Aklera1,3801,450
Alwar1,4201,500
Anta1,4001,470
Anupgarh1,5001,600
Bagru1,4401,530
Balotra1,4901,570
Bandikui1,4201,500
Banswara1,3801,450
Baran1,4001,470
Barmer1,5101,590
Baswa1,4201,500
Bayana1,4201,500
Beawar1,4601,540
Begun1,4301,500
Behror1,4301,520
Bhadra1,4701,560
Bharatpur1,4201,500
Bhilwara1,4401,510
Bhinmal1,4501,520
Bhiwadi1,4301,520
Bidasar1,4901,580
Bikaner1,5201,610
Bilara1,4701,550
Bissau1,4701,570
Bundi1,4201,490
Chaksu1,4401,520
Chhabra1,3901,450
Chidawa1,4501,540
Chittorgarh1,4301,500
Churu1,4801,570
Dausa1,4301,510
Deoli1,4301,510
Dhaulpur1,4101,480
Dig1,4201,500
Dungarpur1,4201,480
Falna1,4501,520
Fatehnagar1,4401,510
Fatehpur1,4801,570
Gangapur1,4201,500
Gulabpura1,4501,520
Hanumangarh1,4601,550
Hindaun1,4201,500
Jahazpur1,4301,500
Jaipur1,4401,530
Jaisalmer1,5601,650
Jaitaran1,4601,540
Jalor1,4601,530
Jhalawar1,4001,460
Jhalrapatan1,4001,460
Jhunjhunun1,4601,550
Jodhpur1,4801,560
Kaithoon1,4101,480
Kaman1,4201,500
Kapasan1,4301,500
Kapren1,4101,480
Karanpur1,4801,570
Karauli1,4201,490
Kekri1,4301,510
Keshorai Patan1,4201,490
Khandela1,4501,540
Kishangarh1,4501,540
Kota1,4201,490
Kotputli1,4301,520
Kuchera1,4801,560
Kumher1,4201,500
Lakheri1,4101,490
Lalsot1,4301,510
Losal1,4801,560
Mahwa1,4201,500
Malpura1,4401,520
Mandal1,4401,510
Mandalgarh1,4301,510
Mandawa1,4701,560
Mangrol1,4001,470
Merta1,4701,550
Nadbai1,4201,500
Nagaur1,5001,580
Nasirabad1,4601,540
Nathdwara1,4501,520
Nawalgarh1,4601,550
Neem ka Thana1,4501,540
Neemrana1,4301,520
Nimbahera1,4201,490
Niwai1,3401,410
Nohar1,4701,570
Nokha1,5201,610
Pali1,4601,540
Phalodi1,5401,620
Pilani1,4501,540
Pilibangan1,4701,570
Pindwara1,4301,500
Pokaran1,5401,620
Pratapgarh1,4001,460
Pushkar1,4601,540
Raisinghnagar1,4801,580
Rajakhera1,4101,490
Rajaldesar1,5001,590
Rajsamand1,4501,520
Ramganj Mandi1,4101,470
Ratangarh1,4901,580
Rawatbhata1,4201,490
Rawatsar1,4701,560
Sadri1,4501,530
Sadulshahar1,4601,560
Sagwara1,3901,450
Sambhar1,4601,540
Sanchor1,4501,520
Sangod1,4001,470
Sardarshahr1,5001,590
Sarwar1,4401,520
Sawai Madhopur1,4101,490
Sawar1,4301,500
Sheoganj1,4401,510
Sikar1,4701,550
Sirohi1,4301,500
Siwana1,4801,560
Sojat1,4601,540
Sri Dungargarh1,5001,590
Sri Ganganagar1,4701,560
Sri Madhopur1,4501,540
Sujangarh1,4901,580
Suket1,4001,470
Sumerpur1,4401,510
Surajgarh1,4501,540
Suratgarh1,4801,570
Taranagar1,4701,570
Todabhim1,4201,490
Todaraisingh1,4301,510
Tonk1,4301,510
Udaipur1,4301,500
Udaipurwati1,4601,550
Viratnagar1,4401,520

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Questions about solar projects in Rajasthan

Is net metering available for factories and commercial buildings in Rajasthan?

In Rajasthan, net metering is open to every consumer category, including commercial and industrial, for loads up to 1 MW or up to the sanctioned load or contract demand, whichever is lower. The regulator set this limit in its order of 7 February 2024; before that it was 500 kW.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Rajasthan

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 17 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.