Somaya Solar Solutions Limited delivers turnkey solar projects in Rajasthan: one contract that runs from the first survey to a commissioned plant with its approvals in place.
What turnkey means in practice
In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.
- One price and one schedule covering design, supply, installation and commissioning
- Approvals and metering paperwork handled by the contractor
- Defined tests before handover, with drawings, warranties and manuals
- A named point of contact through the project
- Operation and maintenance after handover, where contracted
More detail: Turnkey Solar EPC across India.
Steps in a turnkey project in Rajasthan
- Survey of the site and a study of twelve months of bills
- Design, drawings and a fixed-price proposal
- Application to the electricity supplier for connection and metering
- Equipment supply and installation
- Testing, inspection and commissioning
- Handover with drawings, warranties and monitoring access
Approvals a turnkey contract covers in Rajasthan
In Rajasthan, net metering is open to every consumer category, including commercial and industrial, for loads up to 1 MW or up to the sanctioned load or contract demand, whichever is lower. The regulator set this limit in its order of 7 February 2024; before that it was 500 kW.
- Net billing and gross metering are the other arrangements under the same regulations.
- The plant may not be larger than 100% of the consumer's sanctioned load or contract demand.
- The total rooftop capacity connected to one distribution transformer may not exceed 80% of that transformer's capacity.
- Group and virtual net metering were added by the third amendment, notified on 3 December 2025.
- A plant above 1 MW is outside these regulations and goes through the captive or open access route.
What to expect from the plant in Rajasthan
Solar output changes across Rajasthan with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,340 to 1,560 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Abu | 1,420 | 1,490 |
| Abu Road | 1,410 | 1,480 |
| Ajmer | 1,460 | 1,540 |
| Aklera | 1,380 | 1,450 |
| Alwar | 1,420 | 1,500 |
| Anta | 1,400 | 1,470 |
| Anupgarh | 1,500 | 1,600 |
| Bagru | 1,440 | 1,530 |
| Balotra | 1,490 | 1,570 |
| Bandikui | 1,420 | 1,500 |
| Banswara | 1,380 | 1,450 |
| Baran | 1,400 | 1,470 |
| Barmer | 1,510 | 1,590 |
| Baswa | 1,420 | 1,500 |
| Bayana | 1,420 | 1,500 |
| Beawar | 1,460 | 1,540 |
| Begun | 1,430 | 1,500 |
| Behror | 1,430 | 1,520 |
| Bhadra | 1,470 | 1,560 |
| Bharatpur | 1,420 | 1,500 |
| Bhilwara | 1,440 | 1,510 |
| Bhinmal | 1,450 | 1,520 |
| Bhiwadi | 1,430 | 1,520 |
| Bidasar | 1,490 | 1,580 |
| Bikaner | 1,520 | 1,610 |
| Bilara | 1,470 | 1,550 |
| Bissau | 1,470 | 1,570 |
| Bundi | 1,420 | 1,490 |
| Chaksu | 1,440 | 1,520 |
| Chhabra | 1,390 | 1,450 |
| Chidawa | 1,450 | 1,540 |
| Chittorgarh | 1,430 | 1,500 |
| Churu | 1,480 | 1,570 |
| Dausa | 1,430 | 1,510 |
| Deoli | 1,430 | 1,510 |
| Dhaulpur | 1,410 | 1,480 |
| Dig | 1,420 | 1,500 |
| Dungarpur | 1,420 | 1,480 |
| Falna | 1,450 | 1,520 |
| Fatehnagar | 1,440 | 1,510 |
| Fatehpur | 1,480 | 1,570 |
| Gangapur | 1,420 | 1,500 |
| Gulabpura | 1,450 | 1,520 |
| Hanumangarh | 1,460 | 1,550 |
| Hindaun | 1,420 | 1,500 |
| Jahazpur | 1,430 | 1,500 |
| Jaipur | 1,440 | 1,530 |
| Jaisalmer | 1,560 | 1,650 |
| Jaitaran | 1,460 | 1,540 |
| Jalor | 1,460 | 1,530 |
| Jhalawar | 1,400 | 1,460 |
| Jhalrapatan | 1,400 | 1,460 |
| Jhunjhunun | 1,460 | 1,550 |
| Jodhpur | 1,480 | 1,560 |
| Kaithoon | 1,410 | 1,480 |
| Kaman | 1,420 | 1,500 |
| Kapasan | 1,430 | 1,500 |
| Kapren | 1,410 | 1,480 |
| Karanpur | 1,480 | 1,570 |
| Karauli | 1,420 | 1,490 |
| Kekri | 1,430 | 1,510 |
| Keshorai Patan | 1,420 | 1,490 |
| Khandela | 1,450 | 1,540 |
| Kishangarh | 1,450 | 1,540 |
| Kota | 1,420 | 1,490 |
| Kotputli | 1,430 | 1,520 |
| Kuchera | 1,480 | 1,560 |
| Kumher | 1,420 | 1,500 |
| Lakheri | 1,410 | 1,490 |
| Lalsot | 1,430 | 1,510 |
| Losal | 1,480 | 1,560 |
| Mahwa | 1,420 | 1,500 |
| Malpura | 1,440 | 1,520 |
| Mandal | 1,440 | 1,510 |
| Mandalgarh | 1,430 | 1,510 |
| Mandawa | 1,470 | 1,560 |
| Mangrol | 1,400 | 1,470 |
| Merta | 1,470 | 1,550 |
| Nadbai | 1,420 | 1,500 |
| Nagaur | 1,500 | 1,580 |
| Nasirabad | 1,460 | 1,540 |
| Nathdwara | 1,450 | 1,520 |
| Nawalgarh | 1,460 | 1,550 |
| Neem ka Thana | 1,450 | 1,540 |
| Neemrana | 1,430 | 1,520 |
| Nimbahera | 1,420 | 1,490 |
| Niwai | 1,340 | 1,410 |
| Nohar | 1,470 | 1,570 |
| Nokha | 1,520 | 1,610 |
| Pali | 1,460 | 1,540 |
| Phalodi | 1,540 | 1,620 |
| Pilani | 1,450 | 1,540 |
| Pilibangan | 1,470 | 1,570 |
| Pindwara | 1,430 | 1,500 |
| Pokaran | 1,540 | 1,620 |
| Pratapgarh | 1,400 | 1,460 |
| Pushkar | 1,460 | 1,540 |
| Raisinghnagar | 1,480 | 1,580 |
| Rajakhera | 1,410 | 1,490 |
| Rajaldesar | 1,500 | 1,590 |
| Rajsamand | 1,450 | 1,520 |
| Ramganj Mandi | 1,410 | 1,470 |
| Ratangarh | 1,490 | 1,580 |
| Rawatbhata | 1,420 | 1,490 |
| Rawatsar | 1,470 | 1,560 |
| Sadri | 1,450 | 1,530 |
| Sadulshahar | 1,460 | 1,560 |
| Sagwara | 1,390 | 1,450 |
| Sambhar | 1,460 | 1,540 |
| Sanchor | 1,450 | 1,520 |
| Sangod | 1,400 | 1,470 |
| Sardarshahr | 1,500 | 1,590 |
| Sarwar | 1,440 | 1,520 |
| Sawai Madhopur | 1,410 | 1,490 |
| Sawar | 1,430 | 1,500 |
| Sheoganj | 1,440 | 1,510 |
| Sikar | 1,470 | 1,550 |
| Sirohi | 1,430 | 1,500 |
| Siwana | 1,480 | 1,560 |
| Sojat | 1,460 | 1,540 |
| Sri Dungargarh | 1,500 | 1,590 |
| Sri Ganganagar | 1,470 | 1,560 |
| Sri Madhopur | 1,450 | 1,540 |
| Sujangarh | 1,490 | 1,580 |
| Suket | 1,400 | 1,470 |
| Sumerpur | 1,440 | 1,510 |
| Surajgarh | 1,450 | 1,540 |
| Suratgarh | 1,480 | 1,570 |
| Taranagar | 1,470 | 1,570 |
| Todabhim | 1,420 | 1,490 |
| Todaraisingh | 1,430 | 1,510 |
| Tonk | 1,430 | 1,510 |
| Udaipur | 1,430 | 1,500 |
| Udaipurwati | 1,460 | 1,550 |
| Viratnagar | 1,440 | 1,520 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Questions about solar projects in Rajasthan
Is net metering available for factories and commercial buildings in Rajasthan?
In Rajasthan, net metering is open to every consumer category, including commercial and industrial, for loads up to 1 MW or up to the sanctioned load or contract demand, whichever is lower. The regulator set this limit in its order of 7 February 2024; before that it was 500 kW.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Rajasthan
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 17 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.