Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Pokaran, Rajasthan.

Pokaran at a glance for solar projects

District and stateJaisalmer district, Rajasthan
Electricity supplyJodhpur Vidyut Vitran Nigam Limited (JdVVNL) supplies electricity in Jaisalmer district, one of the districts it lists as its area.
Electricity regulatorRajasthan Electricity Regulatory Commission (RERC)
State renewable energy agencyRajasthan Renewable Energy Corporation Limited (RREC)
State solar policyRajasthan Integrated Clean Energy Policy, 2024 (in force until 29 March 2029 unless replaced earlier)
Rooftop metering for businessesNet metering up to 1 MW, within the sanctioned load
Modelled solar outputabout 1,540 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 580 km from Pokaran in a straight line

Solar services in Pokaran

Pokaran: industrial areas

RIICO, the Rajasthan State Industrial Development and Investment Corporation, lists Pokaran among its industrial areas in Jaisalmer district.

The Government of India's One District One Product (ODOP) list names Yellow Stone Products as the product of Jaisalmer district.

Solar output in Pokaran

A solar plant in Pokaran is modelled to produce about 1,540 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industrial (HT-5, 11 kV) energy charge of ₹6.50 per unit (RERC tariff order of 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.50 per unit
100 kW1.5 lakh units1,000 sq m₹10.0 lakh
500 kW7.7 lakh units5,000 sq m₹50.0 lakh
1 MW15.4 lakh units10,000 sq m₹1.00 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Pokaran

For a rooftop array in Pokaran the strongest month is May, at about 154 units for each kW installed, and the weakest is August, at about 112. For a ground-mounted array at a 30° tilt the strongest month is March (about 153) and the weakest is August (about 107). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January120151
February122141
March144153
April148144
May154139
June138122
July120109
August112107
September121124
October129144
November114139
December115147

Somaya Solar projects near Pokaran

These are the Somaya Solar projects closest to Pokaran, with straight-line distances. They are shown as references and are not in Pokaran unless the line says so.

  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 680 km from Pokaran. In progress. Site access was difficult and was handled with local support.
  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 690 km from Pokaran. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 700 km from Pokaran. Included net-metering coordination with the local electricity distribution company.

See all published projects

Questions about solar projects in Pokaran

Which electricity company handles solar connections in Pokaran?

Jodhpur Vidyut Vitran Nigam Limited (JdVVNL) supplies electricity in Jaisalmer district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Pokaran?

Net metering up to 1 MW, within the sanctioned load. The rule is the same across Rajasthan.

How much electricity does a solar plant generate in Pokaran?

About 1,540 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 15.4 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Pokaran?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 580 km from Pokaran in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 680 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Pokaran

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image