Somaya Solar Solutions Limited builds ground-mounted solar power plants in Bongaigaon, Assam for businesses that want their own power and for landowners and developers who sell power to the grid.
Output and land for a ground-mounted plant in Bongaigaon
A solar plant in Bongaigaon is modelled to produce about 1,230 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (32°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 1 MW | 12.3 lakh units | 4 to 5 acres |
| 2 MW | 24.6 lakh units | 8 to 10 acres |
| 5 MW | 61.5 lakh units | 20 to 25 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
State policy and open access in Assam
The Government of Assam notified the Assam Integrated Clean Energy Policy, 2025 on 24 February 2025. It covers solar, wind and other clean energy projects. It stays in force until 31 March 2030 or until another policy replaces it. The regulator's order of 5 August 2026 also refers to a separate Assam Solar Generation Promotion Policy, 2025, notified on 5 June 2025.
Open access in Assam is governed by the AERC (Terms and Conditions for Open Access) Regulations, 2024, published in the Assam Gazette on 4 December 2024. The tariff schedule for 2026-27 sets the open access charges below. The notice does not list an additional surcharge or a banking charge.
The charges, exemptions and conditions for Assam are on the page Ground-Mounted Solar Plant in Assam.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Ground-mounted projects by Somaya Solar near Bongaigaon
These are the Somaya Solar projects closest to Bongaigaon, with straight-line distances. They are shown as references and are not in Bongaigaon unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1060 km from Bongaigaon. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1220 km from Bongaigaon. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Bongaigaon
Which electricity company handles solar connections in Bongaigaon?
Assam Power Distribution Company Limited (APDCL) is the distribution utility for Assam and supplies Bongaigaon district.
How much electricity does a solar plant generate in Bongaigaon?
About 1,230 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.3 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Bongaigaon?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1310 km from Bongaigaon in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1060 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Bongaigaon
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- APDCL notice of tariff schedule w.e.f. 1 April 2026 (AERC order of 6 March 2026); AERC draft notification of 24 September 2025 (Open Access Regulations, 2024, First Amendment); Assam Integrated Clean Energy Policy, 2025, clause 5.8
- Assam Integrated Clean Energy Policy, 2025 (Power Department, Government of Assam, notification PEL.19/2025/13, 24 February 2025); AERC order of 5 August 2026 (Petition No. 09/2026)
- Assam Integrated Clean Energy Policy, 2025, definitions
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)