Somaya Solar Solutions Limited delivers turnkey solar projects in Bundi, Rajasthan: one contract that runs from the first survey to a commissioned plant with its approvals in place.
What turnkey means in practice
In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.
- One price and one schedule covering design, supply, installation and commissioning
- Approvals and metering paperwork handled by the contractor
- Defined tests before handover, with drawings, warranties and manuals
- A named point of contact through the project
- Operation and maintenance after handover, where contracted
More detail: Turnkey Solar EPC across India.
Steps in a turnkey project in Bundi
- Survey of the site and a study of twelve months of bills
- Design, drawings and a fixed-price proposal
- Application to the electricity supplier (JVVNL) for connection and metering
- Equipment supply and installation
- Testing, inspection and commissioning
- Handover with drawings, warranties and monitoring access
Approvals a turnkey contract covers in Bundi
In Rajasthan, net metering is open to every consumer category, including commercial and industrial, for loads up to 1 MW or up to the sanctioned load or contract demand, whichever is lower. The regulator set this limit in its order of 7 February 2024; before that it was 500 kW.
The size limits, charges and other conditions for Rajasthan are on the page Turnkey Solar EPC in Rajasthan.
In Bundi the application for connection and metering goes to JVVNL.
What to expect from the plant in Bundi
A solar plant in Bundi is modelled to produce about 1,420 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industrial (HT-5, 11 kV) energy charge of ₹6.50 per unit (RERC tariff order of 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.50 per unit |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹9.2 lakh |
| 500 kW | 7.1 lakh units | 5,000 sq m | ₹46.1 lakh |
| 1 MW | 14.2 lakh units | 10,000 sq m | ₹92.3 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Reference projects near Bundi
These are the Somaya Solar projects closest to Bundi, with straight-line distances. They are shown as references and are not in Bundi unless the line says so.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 480 km from Bundi. In progress. Site access was difficult and was handled with local support.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 500 km from Bundi. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 510 km from Bundi. Completed, including the transmission line work coordinated with the local distribution company.
Questions about solar projects in Bundi
Which electricity company handles solar connections in Bundi?
Jaipur Vidyut Vitran Nigam Limited (JVVNL) supplies electricity in Bundi district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Bundi?
Net metering up to 1 MW, within the sanctioned load. The rule is the same across Rajasthan.
How much electricity does a solar plant generate in Bundi?
About 1,420 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.2 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Bundi?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 400 km from Bundi in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 480 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Bundi
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- JVVNL website (energy.rajasthan.gov.in/jvvnl), About Us > About Department
- PVGIS, European Commission Joint Research Centre (solar output model)
- RERC rooftop (grid-interactive distributed renewable energy) regulations, 2021, with amendments to December 2025, and RERC order of 7 February 2024
- RERC tariff order for 2026-27, dated 30 March 2026