Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Chamba, Himachal Pradesh.

Chamba at a glance for solar projects

District and stateChamba district, Himachal Pradesh
Electricity supplyHimachal Pradesh State Electricity Board Limited (HPSEBL) is the distribution utility for Himachal Pradesh and supplies Chamba district.
Electricity regulatorHimachal Pradesh Electricity Regulatory Commission (HPERC)
State renewable energy agencyHimachal Pradesh Energy Development Agency (HIMURJA)
State solar policySwaran Jayanti Energy Policy, 2021 (notified on 20 January 2022, as amended)
Rooftop metering for businessesNet metering up to 50 kWp; net billing above 50 kWp up to 1 MWp
Modelled solar outputabout 1,370 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 450 km from Chamba in a straight line

Solar services in Chamba

Local points for solar projects in Chamba

The Government of India's One District One Product (ODOP) list names Chamba Rumal as the product of Chamba district.

Solar output in Chamba

A solar plant in Chamba is modelled to produce about 1,370 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industrial Power Supply (LIPS), HT-1, contract demand above 100 kVA and up to 1 MVA energy charge of ₹5.85 per kVAh (HPERC tariff order for HPSEBL for 2026-27, dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹5.60 per kVAh for HT-2 (contract demand above 1 MVA), ₹5.55 at 66 kV, ₹5.50 at 132 kV and ₹5.45 at 220 kV and above. A demand charge also applies each month: ₹250 per kVA for HT-1, ₹400 per kVA for HT-2 and ₹425 per kVA for EHT. It is charged on the recorded maximum demand or 85% of the contract demand, whichever is higher. Energy used in peak hours (6:30 PM to 10 PM) is charged at ₹6.95 per kVAh for HT and ₹6.75 for EHT. The rates exclude electricity duty and taxes. HPSEBL is the only licensee, so the schedule applies across the state.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹5.85 per kVAh
100 kW1.4 lakh units1,000 sq m₹8.0 lakh
500 kW6.8 lakh units5,000 sq m₹40.1 lakh
1 MW13.7 lakh units10,000 sq m₹80.1 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Chamba

For a rooftop array in Chamba the strongest month is May, at about 144 units for each kW installed, and the weakest is December, at about 93. For a ground-mounted array at a 33° tilt the strongest month is March (about 140) and the weakest is July (about 97). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January95120
February98114
March130140
April140139
May144134
June132119
July10697
August104101
September112118
October118136
November97122
December93123

Somaya Solar projects near Chamba

These are the Somaya Solar projects closest to Chamba, with straight-line distances. They are shown as references and are not in Chamba unless the line says so.

  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 340 km from Chamba. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 350 km from Chamba. Included net-metering coordination with the local electricity distribution company.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 460 km from Chamba. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Chamba

Which electricity company handles solar connections in Chamba?

Himachal Pradesh State Electricity Board Limited (HPSEBL) is the distribution utility for Himachal Pradesh and supplies Chamba district.

Is net metering available for factories and commercial buildings in Chamba?

Net metering up to 50 kWp; net billing above 50 kWp up to 1 MWp. The rule is the same across Himachal Pradesh.

How much electricity does a solar plant generate in Chamba?

About 1,370 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.7 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Chamba?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 450 km from Chamba in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 340 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Chamba

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.