Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Dharamshala, Himachal Pradesh.
Dharamshala at a glance for solar projects
| District and state | Kangra district, Himachal Pradesh |
|---|---|
| Electricity supply | Himachal Pradesh State Electricity Board Limited (HPSEBL) is the distribution utility for Himachal Pradesh and supplies Kangra district. |
| Electricity regulator | Himachal Pradesh Electricity Regulatory Commission (HPERC) |
| State renewable energy agency | Himachal Pradesh Energy Development Agency (HIMURJA) |
| State solar policy | Swaran Jayanti Energy Policy, 2021 (notified on 20 January 2022, as amended) |
| Rooftop metering for businesses | Net metering up to 50 kWp; net billing above 50 kWp up to 1 MWp |
| Modelled solar output | about 1,360 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 410 km from Dharamshala in a straight line |
Solar services in Dharamshala
- Solar EPC Company in Dharamshala
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Dharamshala
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Dharamshala
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Dharamshala
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Dharamshala
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Dharamshala
One contract from survey to a working plant, with approvals and handover included.
Local points for solar projects in Dharamshala
The Government of India's One District One Product (ODOP) list names Kangra Tea and Kangra Paintings as the products of Kangra district.
Solar output in Dharamshala
A solar plant in Dharamshala is modelled to produce about 1,360 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industrial Power Supply (LIPS), HT-1, contract demand above 100 kVA and up to 1 MVA energy charge of ₹5.85 per kVAh (HPERC tariff order for HPSEBL for 2026-27, dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹5.60 per kVAh for HT-2 (contract demand above 1 MVA), ₹5.55 at 66 kV, ₹5.50 at 132 kV and ₹5.45 at 220 kV and above. A demand charge also applies each month: ₹250 per kVA for HT-1, ₹400 per kVA for HT-2 and ₹425 per kVA for EHT. It is charged on the recorded maximum demand or 85% of the contract demand, whichever is higher. Energy used in peak hours (6:30 PM to 10 PM) is charged at ₹6.95 per kVAh for HT and ₹6.75 for EHT. The rates exclude electricity duty and taxes. HPSEBL is the only licensee, so the schedule applies across the state.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹5.85 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹8.0 lakh |
| 500 kW | 6.8 lakh units | 5,000 sq m | ₹39.8 lakh |
| 1 MW | 13.6 lakh units | 10,000 sq m | ₹79.6 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Dharamshala
For a rooftop array in Dharamshala the strongest month is May, at about 149 units for each kW installed, and the weakest is December, at about 93. For a ground-mounted array at a 34° tilt the strongest month is March (about 142) and the weakest is July (about 90). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 94 | 122 |
| February | 99 | 119 |
| March | 130 | 142 |
| April | 141 | 141 |
| May | 149 | 139 |
| June | 135 | 120 |
| July | 99 | 90 |
| August | 95 | 92 |
| September | 109 | 115 |
| October | 122 | 141 |
| November | 99 | 126 |
| December | 93 | 127 |
Somaya Solar projects near Dharamshala
These are the Somaya Solar projects closest to Dharamshala, with straight-line distances. They are shown as references and are not in Dharamshala unless the line says so.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 300 km from Dharamshala. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 310 km from Dharamshala. Included net-metering coordination with the local electricity distribution company.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 420 km from Dharamshala. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Dharamshala
Which electricity company handles solar connections in Dharamshala?
Himachal Pradesh State Electricity Board Limited (HPSEBL) is the distribution utility for Himachal Pradesh and supplies Kangra district.
Is net metering available for factories and commercial buildings in Dharamshala?
Net metering up to 50 kWp; net billing above 50 kWp up to 1 MWp. The rule is the same across Himachal Pradesh.
How much electricity does a solar plant generate in Dharamshala?
About 1,360 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.6 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Dharamshala?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 410 km from Dharamshala in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 300 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Dharamshala
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- HPERC (Rooftop Solar PV Grid Interactive System) (Third Amendment) Regulations, 2024, clause 22A, which names HIMURJA as a State Nodal Agency
- HPERC (Rooftop Solar PV Grid Interactive System) Regulations, 2015, with the First Amendment of 6 November 2018, the Second Amendment of 14 September 2022, the Third Amendment of 12 June 2024 and the Fourth Amendment of 19 August 2026
- HPERC orders of 22 July 2026 (Petition No. 121 of 2026), 9 October 2026 (Petition No. 179 of 2026) and 22 March 2025 (Petition No. 20 of 2025), which apply the Swaran Jayanti Energy Policy, 2021; Directorate of Energy, Government of Himachal Pradesh, scheme for solar power projects above 5 MW (published 10 March 2026)
- HPERC tariff order for HPSEBL for 2026-27, dated 25 March 2026 (Annexure I, Schedule Large Industrial Power Supply)
- HPERC tariff order for HPSEBL, 2026-27 (25 March 2026), para 1.1.4
- Himachal Pradesh Electricity Regulatory Commission
- MoHUA PMAY-Urban, List of ULBs (columns: State | District Code | District Name | City Code | Name of City | ULB Type; undated)
- PVGIS, European Commission Joint Research Centre (solar output model)