Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Dharamshala, Himachal Pradesh. Most of our published work is megawatt-scale rooftop plants on working industrial sites.
Local points for solar projects in Dharamshala
The Government of India's One District One Product (ODOP) list names Kangra Tea and Kangra Paintings as the products of Kangra district.
Metering rules for business rooftops in Dharamshala
In Himachal Pradesh a consumer of HPSEBL can install rooftop solar under net metering up to 50 kWp. A system above 50 kWp and up to 1 MWp goes under net billing. The rules are in HPERC's Rooftop Solar PV Grid Interactive System Regulations, 2015, as amended four times, most recently on 19 August 2026.
The size limits, charges and other conditions for Himachal Pradesh are on the page Commercial & Industrial Solar in Himachal Pradesh.
In Dharamsala the application for connection and metering goes to HPSEBL.
Output and bill value for a rooftop plant in Dharamshala
A solar plant in Dharamshala is modelled to produce about 1,360 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large Industrial Power Supply (LIPS), HT-1, contract demand above 100 kVA and up to 1 MVA energy charge of ₹5.85 per kVAh (HPERC tariff order for HPSEBL for 2026-27, dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹5.60 per kVAh for HT-2 (contract demand above 1 MVA), ₹5.55 at 66 kV, ₹5.50 at 132 kV and ₹5.45 at 220 kV and above. A demand charge also applies each month: ₹250 per kVA for HT-1, ₹400 per kVA for HT-2 and ₹425 per kVA for EHT. It is charged on the recorded maximum demand or 85% of the contract demand, whichever is higher. Energy used in peak hours (6:30 PM to 10 PM) is charged at ₹6.95 per kVAh for HT and ₹6.75 for EHT. The rates exclude electricity duty and taxes. HPSEBL is the only licensee, so the schedule applies across the state.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹5.85 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹8.0 lakh |
| 250 kW | 3.4 lakh units | 2,500 sq m | ₹19.9 lakh |
| 500 kW | 6.8 lakh units | 5,000 sq m | ₹39.8 lakh |
| 1 MW | 13.6 lakh units | 10,000 sq m | ₹79.6 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
How a factory or commercial rooftop project runs
Rooftop plants on working buildings are planned around the roof, the load and the production schedule.
- Roof check: sheet or concrete, load capacity, shading and safe access
- Sizing against daytime load and sanctioned demand, within the metering rules above
- Mounting design to suit the roof, including corrosion protection where the air is harsh
- Installation in stages so production carries on
- Testing, metering and connection with the electricity supplier
- Monitoring and maintenance after handover, where contracted
More detail: Commercial & Industrial Solar across India.
Rooftop projects by Somaya Solar near Dharamshala
These are the Somaya Solar projects closest to Dharamshala, with straight-line distances. They are shown as references and are not in Dharamshala unless the line says so.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 300 km from Dharamshala. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 310 km from Dharamshala. Included net-metering coordination with the local electricity distribution company.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 420 km from Dharamshala. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Dharamshala
Which electricity company handles solar connections in Dharamshala?
Himachal Pradesh State Electricity Board Limited (HPSEBL) is the distribution utility for Himachal Pradesh and supplies Kangra district.
Is net metering available for factories and commercial buildings in Dharamshala?
Net metering up to 50 kWp; net billing above 50 kWp up to 1 MWp. The rule is the same across Himachal Pradesh.
How much electricity does a solar plant generate in Dharamshala?
About 1,360 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.6 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Dharamshala?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 410 km from Dharamshala in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 300 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Dharamshala
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- HPERC (Rooftop Solar PV Grid Interactive System) Regulations, 2015, with the First Amendment of 6 November 2018, the Second Amendment of 14 September 2022, the Third Amendment of 12 June 2024 and the Fourth Amendment of 19 August 2026
- HPERC tariff order for HPSEBL for 2026-27, dated 25 March 2026 (Annexure I, Schedule Large Industrial Power Supply)
- HPERC tariff order for HPSEBL, 2026-27 (25 March 2026), para 1.1.4
- PVGIS, European Commission Joint Research Centre (solar output model)