Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions and landowners in Chandigarh.
Chandigarh at a glance for solar projects
| Electricity distribution | CPDL (The whole of the Union Territory of Chandigarh) |
|---|---|
| Electricity regulator | Joint Electricity Regulatory Commission for the State of Goa and Union Territories (JERC) |
| Renewable energy agency | Chandigarh Renewable Energy and Science & Technology Promotion Society (CREST) |
| Solar policy | Model Solar City programme of the Chandigarh Administration, run through CREST |
| Rooftop metering for businesses | Net metering up to 500 kWp, within the sanctioned load |
| Modelled solar output | about 1,390 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 240 km from Chandigarh in a straight line |
Solar services in Chandigarh
- Solar EPC Company in Chandigarh
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Chandigarh
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Chandigarh
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Chandigarh
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Chandigarh
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Chandigarh
One contract from survey to a working plant, with approvals and handover included.
Chandigarh: a city that builds its solar on rooftops
The Chandigarh Administration states that the union territory has no power generating unit of its own and takes its power from neighbouring states. Because land is scarce in the city, the Administration plans its solar capacity as rooftop plants. The Ministry of New and Renewable Energy selected Chandigarh to be developed as a Model Solar City, and a Solar City cell works in CREST.
Electricity distribution in Chandigarh passed from the Electricity Wing of the Engineering Department to Chandigarh Power Distribution Limited (CPDL) on 1 February 2025. CPDL is the distribution licensee for the whole union territory, so a net metering application for a plant in Chandigarh is made to CPDL.
Solar output in Chandigarh
A solar plant in Chandigarh is modelled to produce about 1,390 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industrial (HTS-IV, 11/33 kV, contract demand above 100 kVA and up to 5,000 kVA), solar hours energy charge of ₹3.32 per kVAh (JERC Tariff Order of 30 October 2025 for Chandigarh Power Distribution Limited (Petition No. 150/2025): the energy charge approved for 2026-27 is ₹4.15, and under the order's time-of-day rates it is billed at 0.8 times between 09:00 and 17:00). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The order makes time-of-day metering mandatory for HT and EHT consumers. Solar units produced from 07:00 to 09:00 or after 17:00 offset energy billed at 1.2 times the charge, which the table does not count. A fixed charge of ₹220 per kVA per month also applies. The charge is billed per kVAh. The table counts one kWh as one kVAh, which is close when the power factor is near 1.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹3.32 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹4.6 lakh |
| 500 kW | 7.0 lakh units | 5,000 sq m | ₹23.1 lakh |
| 1 MW | 13.9 lakh units | 10,000 sq m | ₹46.1 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Chandigarh
For a rooftop array in Chandigarh the strongest month is May, at about 146 units for each kW installed, and the weakest is January, at about 99. For a ground-mounted array at a 34° tilt the strongest month is March (about 146) and the weakest is July (about 91). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 99 | 130 |
| February | 106 | 127 |
| March | 135 | 146 |
| April | 141 | 139 |
| May | 146 | 132 |
| June | 130 | 113 |
| July | 101 | 91 |
| August | 100 | 95 |
| September | 108 | 112 |
| October | 121 | 142 |
| November | 104 | 134 |
| December | 101 | 137 |
Somaya Solar projects near Chandigarh
These are the Somaya Solar projects closest to Chandigarh, with straight-line distances. They are shown as references and are not in Chandigarh unless the line says so.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 150 km from Chandigarh. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 160 km from Chandigarh. Included net-metering coordination with the local electricity distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 260 km from Chandigarh. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Chandigarh
Is net metering available for factories and commercial buildings in Chandigarh?
In Chandigarh, a consumer can connect a rooftop, ground-mounted or floating solar plant of up to 500 kWp at one premises under JERC's net metering regulations of 2019, as amended in 2024. A plant above 500 kWp comes under net billing (net feed-in). The plant may not be larger than the consumer's contract demand or sanctioned load. The plant may be owned by the consumer or by a third party.
How much electricity does a solar plant generate in Chandigarh?
About 1,390 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.9 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Chandigarh?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 240 km from Chandigarh in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 150 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Chandigarh
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 17 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- Chandigarh Administration, Department of Science & Technology & Renewable Energy (web page, read 17 November 2026)
- Chandigarh Administration, Department of Science & Technology & Renewable Energy (web page, read 17 November 2026); Lok Sabha Unstarred Question 2920, answered 5 August 2026
- GeoNames (place coordinates, CC BY 4.0)
- JERC (Solar PV Grid Interactive System based on Net Metering) Regulations, 2019 (No. JERC-24/2019, notified 24 July 2019) and the Net Metering & Gross Metering (First Amendment) Regulations, 2024 (notified 1 August 2024, Gazette of India 11 September 2024)
- JERC (Specific Conditions of Distribution License applicable to Chandigarh Power Distribution Limited) Regulations, 2026, Gazette of India, 24 October 2026, and JERC Tariff Order of 30 October 2025 (CPDL took over from the Electricity Wing of the Engineering Department on 1 February 2025)
- JERC Tariff Order for Chandigarh Power Distribution Limited, Petition No. 150/2025, dated 30 October 2025
- JERC Tariff Order for Chandigarh Power Distribution Limited, Petition No. 150/2025, dated 30 October 2025 (section 1.1)
- JERC Tariff Order, Aggregate Revenue Requirement and Determination of Retail Tariff for the 4th MYT Control Period (FY 2025-26 to FY 2029-30), Petition No. 150/2025, Chandigarh Power Distribution Limited, dated 30 October 2025
- PVGIS, European Commission Joint Research Centre (solar output model)