Solar EPC Company in Chandigarh

Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Chandigarh. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.

Chandigarh at a glance for solar projects

Electricity distributionCPDL (The whole of the Union Territory of Chandigarh)
Electricity regulatorJoint Electricity Regulatory Commission for the State of Goa and Union Territories (JERC)
Renewable energy agencyChandigarh Renewable Energy and Science & Technology Promotion Society (CREST)
Solar policyModel Solar City programme of the Chandigarh Administration, run through CREST
Rooftop metering for businessesNet metering up to 500 kWp, within the sanctioned load
Modelled solar outputabout 1,390 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 240 km from Chandigarh in a straight line

What our EPC scope covers

An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.

  • Site survey and a study of your electricity use and bills
  • Plant design, drawings and equipment selection
  • Supply of modules, inverters, mounting structures and electrical equipment
  • Installation, testing and commissioning
  • Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
  • Operation and maintenance after handover, where contracted

More detail: Solar EPC Company across India.

Connecting a plant to the grid in Chandigarh

In Chandigarh, a consumer can connect a rooftop, ground-mounted or floating solar plant of up to 500 kWp at one premises under JERC's net metering regulations of 2019, as amended in 2024. A plant above 500 kWp comes under net billing (net feed-in). The plant may not be larger than the consumer's contract demand or sanctioned load. The plant may be owned by the consumer or by a third party.

  • Under net billing, power drawn from the grid is charged at the retail tariff and solar power sent to the grid is valued at the feed-in tariff set by the Commission.
  • Gross metering is allowed for a consumer or generator who chooses to sell all the solar power to the distribution licensee at the feed-in tariff set by the Commission.
  • The total solar capacity connected to one distribution transformer may not exceed 75% of that transformer's capacity. The licensee may allow more after a detailed load study.
  • Under net metering, surplus units carry forward to the next billing period. Units still unadjusted at the end of the financial year are bought by the licensee at its average power purchase cost or the feed-in tariff, whichever is lower.
  • Group net metering is open to all consumers. Virtual net metering is for residential consumers, group housing societies and establishments of government or local authorities. Under both, the plant may be up to 500 kWp or the sanctioned load, whichever is lower.
  • A consumer may lease the roof or land to a solar developer under net metering. Plants under these regulations are exempt from open access charges and from banking charges.
  • For a rooftop plant the licensee must finish the technical feasibility study within fifteen days. If it does not, the proposal is taken to be technically feasible. An application for a plant up to 10 kW is deemed accepted without the study.
  • Latest amendment: the First Amendment Regulations, 2024, notified on 1 August 2024 and published in the Gazette of India on 11 September 2024.

What a plant produces in Chandigarh

A solar plant in Chandigarh is modelled to produce about 1,390 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industrial (HTS-IV, 11/33 kV, contract demand above 100 kVA and up to 5,000 kVA), solar hours energy charge of ₹3.32 per kVAh (JERC Tariff Order of 30 October 2025 for Chandigarh Power Distribution Limited (Petition No. 150/2025): the energy charge approved for 2026-27 is ₹4.15, and under the order's time-of-day rates it is billed at 0.8 times between 09:00 and 17:00). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The order makes time-of-day metering mandatory for HT and EHT consumers. Solar units produced from 07:00 to 09:00 or after 17:00 offset energy billed at 1.2 times the charge, which the table does not count. A fixed charge of ₹220 per kVA per month also applies. The charge is billed per kVAh. The table counts one kWh as one kVAh, which is close when the power factor is near 1.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹3.32 per kVAh
100 kW1.4 lakh units1,000 sq m₹4.6 lakh
500 kW7.0 lakh units5,000 sq m₹23.1 lakh
1 MW13.9 lakh units10,000 sq m₹46.1 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Chandigarh: a city that builds its solar on rooftops

The Chandigarh Administration states that the union territory has no power generating unit of its own and takes its power from neighbouring states. Because land is scarce in the city, the Administration plans its solar capacity as rooftop plants. The Ministry of New and Renewable Energy selected Chandigarh to be developed as a Model Solar City, and a Solar City cell works in CREST.

Electricity distribution in Chandigarh passed from the Electricity Wing of the Engineering Department to Chandigarh Power Distribution Limited (CPDL) on 1 February 2025. CPDL is the distribution licensee for the whole union territory, so a net metering application for a plant in Chandigarh is made to CPDL.

EPC projects by Somaya Solar near Chandigarh

These are the Somaya Solar projects closest to Chandigarh, with straight-line distances. They are shown as references and are not in Chandigarh unless the line says so.

  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 150 km from Chandigarh. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 160 km from Chandigarh. Included net-metering coordination with the local electricity distribution company.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 260 km from Chandigarh. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Chandigarh

Is net metering available for factories and commercial buildings in Chandigarh?

In Chandigarh, a consumer can connect a rooftop, ground-mounted or floating solar plant of up to 500 kWp at one premises under JERC's net metering regulations of 2019, as amended in 2024. A plant above 500 kWp comes under net billing (net feed-in). The plant may not be larger than the consumer's contract demand or sanctioned load. The plant may be owned by the consumer or by a third party.

How much electricity does a solar plant generate in Chandigarh?

About 1,390 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.9 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Chandigarh?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 240 km from Chandigarh in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 150 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Chandigarh

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 17 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.