Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Panchkula, Haryana. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Panchkula at a glance for solar projects
| District and state | Panchkula district, Haryana |
|---|---|
| Electricity supply | Uttar Haryana Bijli Vitran Nigam Limited (UHBVN) supplies electricity in Panchkula district, one of the districts it lists as its area. |
| Electricity regulator | Haryana Electricity Regulatory Commission (HERC) |
| State renewable energy agency | Haryana Renewable Energy Development Agency, under the Department of New & Renewable Energy, Haryana (HAREDA) |
| State solar policy | Haryana Solar Power Policy, 2016 (notified 14 March 2016; in force until a new policy is notified) |
| Rooftop metering for businesses | Net metering up to 500 kW, within the sanctioned load |
| Modelled solar output | about 1,390 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 230 km from Panchkula in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Panchkula
In Haryana, net metering is open to every consumer except agricultural tube-well consumers, for loads up to 500 kW or up to the sanctioned load or contract demand, whichever is lower. The rules are in the regulator's rooftop solar regulations of 2021, last amended on 30 October 2025.
The size limits, charges and other conditions for Haryana are on the page Solar EPC Company in Haryana.
In Panchkula the application for connection and metering goes to UHBVN.
What a plant produces in Panchkula
A solar plant in Panchkula is modelled to produce about 1,390 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Supply (above 50 kW), supply at 11 kV energy charge of ₹6.95 per kVAh (HERC tariff order of 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. Energy charge only. The fixed charge is ₹290 per kVA of contract demand per month. Supply at 33 kV is ₹6.85 per kVAh and at 66 or 132 kV ₹6.75 per kVAh. Electricity duty, municipal tax and fuel surcharge adjustment (FSA) are extra. The rates are the same for UHBVN and DHBVN and did not change from 2025-26.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.95 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹9.7 lakh |
| 500 kW | 7.0 lakh units | 5,000 sq m | ₹48.3 lakh |
| 1 MW | 13.9 lakh units | 10,000 sq m | ₹96.6 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Panchkula
The Government of India's One District One Product (ODOP) list names Automobile Parts and Pharmaceuticals as the products of Panchkula district.
EPC projects by Somaya Solar near Panchkula
These are the Somaya Solar projects closest to Panchkula, with straight-line distances. They are shown as references and are not in Panchkula unless the line says so.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 140 km from Panchkula. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 150 km from Panchkula. Included net-metering coordination with the local electricity distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 250 km from Panchkula. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Panchkula
Which electricity company handles solar connections in Panchkula?
Uttar Haryana Bijli Vitran Nigam Limited (UHBVN) supplies electricity in Panchkula district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Panchkula?
Net metering up to 500 kW, within the sanctioned load. The rule is the same across Haryana.
How much electricity does a solar plant generate in Panchkula?
About 1,390 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.9 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Panchkula?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 230 km from Panchkula in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 140 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Panchkula
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- Department of New & Renewable Energy, Haryana (HAREDA) website, and Haryana Solar Power Policy, 2016 (notified 14 March 2016)
- Directorate of Urban Local Bodies, Haryana: Municipalities - Key Figures (table S.No | District | MC Name | MC Type; page states data as on 11-11-2026)
- GeoNames (place coordinates, CC BY 4.0)
- HERC (Rooftop Solar Grid Interactive Systems Based on Net Metering/Gross Metering) Regulations, 2021, notified 19 July 2021, with the first amendment of 15 July 2024 and the second amendment of 30 October 2025 (as circulated in UHBVN Sales Circulars U-29/2021, U-33/2024 and U-16/2025)
- Haryana Government Gazette of 11 November 2025 (HERC notification of 30 October 2025), as circulated in UHBVN Sales Circular U-16/2025
- Haryana Solar Power Policy, 2016 (Renewable Energy Department, Government of Haryana, notification of 14 March 2016), with addenda of 19 May 2016 and 23 June 2017
- PVGIS, European Commission Joint Research Centre (solar output model)
- UHBVN Sales Circular U-03/2026 of 21 April 2026, schedule of tariff for 2026-27 under the HERC order of 25 March 2026 (same rates in DHBVN Sales Circular D-06/2026 of 13 May 2026)
- UHBVN website, About UHBVN