Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Chandrakona, West Bengal. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.

Chandrakona at a glance for solar projects

District and statePaschim Medinipur district, West Bengal
Electricity supplyWest Bengal State Electricity Distribution Company Limited (WBSEDCL) supplies electricity in Paschim Medinipur district, one of the districts it lists as its area.
Electricity regulatorWest Bengal Electricity Regulatory Commission (WBERC)
State renewable energy agencyWest Bengal Renewable Energy Development Agency (WBREDA)
Rooftop metering for businessesNet metering up to 500 kW; net billing and gross metering up to the contract demand
Modelled solar outputabout 1,290 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1200 km from Chandrakona in a straight line

What our EPC scope covers

An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.

  • Site survey and a study of your electricity use and bills
  • Plant design, drawings and equipment selection
  • Supply of modules, inverters, mounting structures and electrical equipment
  • Installation, testing and commissioning
  • Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
  • Operation and maintenance after handover, where contracted

More detail: Solar EPC Company across India.

Connecting a plant to the grid in Chandrakona

In West Bengal, rooftop solar for every consumer category is governed by WBERC's Grid Interactive Rooftop Solar Photovoltaic System for Prosumers Regulations, 2025, notified on 31 July 2025. A consumer may choose net metering, net billing or gross metering. Net metering is allowed from 1 kW up to 500 kW, or up to the contract demand or sanctioned load, whichever is lower. Net billing and gross metering are allowed up to the contract demand or sanctioned load. WBERC lists no amendment to these regulations.

The size limits, charges and other conditions for West Bengal are on the page Solar EPC Company in West Bengal.

In Chandrakona the application for connection and metering goes to WBSEDCL.

What a plant produces in Chandrakona

A solar plant in Chandrakona is modelled to produce about 1,290 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industries (11 kV), Rate E(B), high voltage energy charge of ₹7.07 per kWh (WBERC tariff order for WBSEDCL for 2025-26, dated 20 March 2025, in force from 1 April 2025 and continuing until further order). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is the summer rate; it is ₹7.06 per unit in monsoon and ₹7.05 in winter. At 33 kV the rates are ₹6.91, ₹6.89 and ₹6.87; at 132 kV ₹6.77, ₹6.75 and ₹6.73. A demand charge of ₹384 per kVA per month also applies. An optional time-of-day scheme at 11 kV charges ₹6.95 (6 AM to 5 PM), ₹8.37 (5 PM to 11 PM) and ₹5.18 (11 PM to 6 AM) in summer; at 220 kV only time-of-day rates apply. Electricity duty and taxes are extra. A green tariff of 50 paise per unit applies on top for consumers who ask for green power. Consumers in the former DPL area of Durgapur still pay DPL's tariff as on 31 December 2018. Other licensees have their own orders: CESC charges ₹6.81 per unit (summer) for HV industries below 33 kV and ₹6.58 at 33 kV (order of 25 March 2025), and DVC charges ₹6.21 at 11 kV (order of 31 March 2025), each with a demand charge of ₹384 per kVA per month. No WBERC tariff order for 2026-27 was listed on WBERC's website on 18 November 2026.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.07 per kWh
100 kW1.3 lakh units1,000 sq m₹9.1 lakh
500 kW6.5 lakh units5,000 sq m₹45.6 lakh
1 MW12.9 lakh units10,000 sq m₹91.2 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Local points for solar projects in Chandrakona

The Government of India's One District One Product (ODOP) list names Patachitra, Madur (Mat) & Mat products and Fabricated Steel Products as the products of Paschim Medinipur district.

EPC projects by Somaya Solar near Chandrakona

These are the Somaya Solar projects closest to Chandrakona, with straight-line distances. They are shown as references and are not in Chandrakona unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 740 km from Chandrakona. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 950 km from Chandrakona. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1120 km from Chandrakona. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Chandrakona

Which electricity company handles solar connections in Chandrakona?

West Bengal State Electricity Distribution Company Limited (WBSEDCL) supplies electricity in Paschim Medinipur district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Chandrakona?

Net metering up to 500 kW; net billing and gross metering up to the contract demand. The rule is the same across West Bengal.

How much electricity does a solar plant generate in Chandrakona?

About 1,290 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.9 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Chandrakona?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1200 km from Chandrakona in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 740 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Chandrakona

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image