Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Durg, Chhattisgarh as an EPC contractor: engineering, supply, construction and commissioning.
What Chhattisgarh's policy says about large solar plants
The Chhattisgarh State Solar Energy Policy 2017-30 is the state's current solar policy. The state issued it in the Chhattisgarh Rajpatra of 12 December 2025, after amending the earlier 2017-27 policy. It stays in force until 31 March 2030 unless a new policy replaces it.
In Chhattisgarh the rules for renewable energy through the grid are spread over several documents: CSERC's Distributed Renewable Energy Sources Regulations (as amended in 2021 and 2023), its Intra-State Open Access Regulations (as amended in 2023 and 2026) and the yearly tariff order. The points below are taken from those documents.
The charges, exemptions and conditions for Chhattisgarh are on the page Utility-Scale Solar in Chhattisgarh.
Output and land at megawatt scale in Durg
A solar plant in Durg is modelled to produce about 1,390 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (27°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 5 MW | 69.5 lakh units | 20 to 25 acres |
| 10 MW | 1.39 crore units | 40 to 50 acres |
| 25 MW | 3.48 crore units | 100 to 125 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Megawatt-scale ground-mounted work by Somaya Solar near Durg
These are the Somaya Solar projects closest to Durg, with straight-line distances. They are shown as references and are not in Durg unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 310 km from Durg. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 900 km from Durg. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Durg
Which electricity company handles solar connections in Durg?
Chhattisgarh State Power Distribution Company Limited (CSPDCL) is the state distribution company and supplies Durg district.
How much electricity does a solar plant generate in Durg?
About 1,390 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.9 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Durg?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 910 km from Durg in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 310 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Durg
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- CSERC tariff order for CSPDCL, FY 2026-30 (chapter 1)
- CSERC tariff schedule for FY 2026-27 (clause 1.3, open access charges), with the corrigendum of 19 June 2026; CSERC DRE (Second Amendment) Regulations, 2023; CSERC Open Access (Third Amendment) Regulations, 2026
- Chhattisgarh State Solar Energy Policy 2017-30, Chhattisgarh Rajpatra, 12 December 2025 (Energy Department, Government of Chhattisgarh; copy on the CREDA website)
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)