Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Etawah, Uttar Pradesh. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Etawah at a glance for solar projects
| District and state | Etawah district, Uttar Pradesh |
|---|---|
| Electricity supply | Dakshinanchal Vidyut Vitran Nigam Limited (DVVNL), the state distribution company with its head office in Agra, supplies electricity in Etawah district, one of the 21 districts it lists as its area. |
| Electricity regulator | Uttar Pradesh Electricity Regulatory Commission (UPERC) |
| State renewable energy agency | Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) |
| State solar policy | Uttar Pradesh Solar Energy Policy 2022 (five-year term, unless replaced earlier) |
| Rooftop metering for businesses | Net billing or gross metering; no net metering for industry or commerce |
| Modelled solar output | about 1,400 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 260 km from Etawah in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Etawah
In Uttar Pradesh, commercial and industrial consumers do not get net metering. Under the regulator's rooftop solar regulations of 2019, as amended, they can use net billing (also called net feed-in) or gross metering. Net metering is kept for domestic and metered agricultural consumers and, since November 2023, for public and educational institutions.
The size limits, charges and other conditions for Uttar Pradesh are on the page Solar EPC Company in Uttar Pradesh.
In Etawah the application for connection and metering goes to DVVNL.
What a plant produces in Etawah
A solar plant in Etawah is modelled to produce about 1,400 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Large and Heavy Power (HV-2, supply up to 11 kV, urban schedule) energy charge of ₹7.10 per kVAh (UPERC tariff order of 2 July 2026 for 2026-27). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. This charge is billed per kVAh. The table counts one kWh as one kVAh, which is close when the power factor is near 1.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹7.10 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹9.9 lakh |
| 500 kW | 7.0 lakh units | 5,000 sq m | ₹49.7 lakh |
| 1 MW | 14.0 lakh units | 10,000 sq m | ₹99.4 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Etawah: the district's products
Under the state's One District One Product scheme, the products listed for Etawah district are Textile Embroidery, Tailoring and Textile Products.
The Government of India's One District One Product (ODOP) list names Textile Products, Tailoring and Garment Embroidery as the product of Etawah district.
EPC projects by Somaya Solar near Etawah
These are the Somaya Solar projects closest to Etawah, with straight-line distances. They are shown as references and are not in Etawah unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 150 km from Etawah. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 240 km from Etawah. In progress. Site access was difficult and was handled with local support.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 270 km from Etawah. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Etawah
Which electricity company handles solar connections in Etawah?
Dakshinanchal Vidyut Vitran Nigam Limited (DVVNL), the state distribution company with its head office in Agra, supplies electricity in Etawah district, one of the 21 districts it lists as its area.
Is net metering available for factories and commercial buildings in Etawah?
Net billing or gross metering; no net metering for industry or commerce. The rule is the same across Uttar Pradesh.
How much electricity does a solar plant generate in Etawah?
About 1,400 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.0 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Etawah?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 260 km from Etawah in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 150 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Etawah
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- DVVNL official website, About Us page
- GeoNames (place coordinates, CC BY 4.0)
- ODOP portal, Government of Uttar Pradesh: Etawah district page
- PVGIS, European Commission Joint Research Centre (solar output model)
- UPERC (Rooftop Solar PV Grid Interactive Systems Gross/Net Metering) Regulations, 2019, with amendments of 1 June 2022, 17 November 2023 and 3 June 2025; UPERC tariff order of 2 July 2026, paragraph 3.13.5
- UPERC tariff order for 2026-27 for the state distribution companies, dated 2 July 2026
- Uttar Pradesh Electricity Regulatory Commission
- Uttar Pradesh Solar Energy Policy 2022 (Government of Uttar Pradesh)
- e-Nagarsewa Uttar Pradesh portal (e-nagarsewaup.gov.in), ULB list: Nagar Palika Parishad