Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Kailashahar, Tripura. Most of our published work is megawatt-scale rooftop plants on working industrial sites.
Local points for solar projects in Kailashahar
The Government of India's One District One Product (ODOP) list names Tea as the product of Unakoti district.
Metering rules for business rooftops in Kailashahar
In Tripura, rooftop solar for all consumer categories falls under the TERC (Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulations, 2024, published in the Tripura Gazette on 5 July 2024. The First Amendment was notified on 18 December 2025. A Second Amendment was published as a draft on 16 October 2026, and TERC still lists it under draft regulations.
The size limits, charges and other conditions for Tripura are on the page Commercial & Industrial Solar in Tripura.
In Kailashahar the application for connection and metering goes to TSECL.
Output and bill value for a rooftop plant in Kailashahar
A solar plant in Kailashahar is modelled to produce about 1,230 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial, above 100 HP energy charge of ₹8.34 per kWh (TERC tariff order for TSECL for FY 2026-27, dated 4 May 2026, in force from 1 May 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The Industrial category is split by connected horsepower, not by voltage. A fixed charge of ₹280 per kW per month also applies. Time-of-day billing: energy charges are 80% of the normal rate from 9 AM to 5 PM and 140% from 5 PM to 10 PM for industrial users, and normal from 10 PM to 9 AM. A 3% rebate on the bill applies for payment within 5 working days. Bulk Supply is ₹8.66 per kWh with ₹210 per kW per month fixed. The rates exclude taxes and duties. The schedule applies throughout the state.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹8.34 per kWh |
|---|---|---|---|
| 100 kW | 1.2 lakh units | 1,000 sq m | ₹10.3 lakh |
| 250 kW | 3.1 lakh units | 2,500 sq m | ₹25.6 lakh |
| 500 kW | 6.2 lakh units | 5,000 sq m | ₹51.3 lakh |
| 1 MW | 12.3 lakh units | 10,000 sq m | ₹1.03 crore |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
How a factory or commercial rooftop project runs
Rooftop plants on working buildings are planned around the roof, the load and the production schedule.
- Roof check: sheet or concrete, load capacity, shading and safe access
- Sizing against daytime load and sanctioned demand, within the metering rules above
- Mounting design to suit the roof, including corrosion protection where the air is harsh
- Installation in stages so production carries on
- Testing, metering and connection with the electricity supplier
- Monitoring and maintenance after handover, where contracted
More detail: Commercial & Industrial Solar across India.
Rooftop projects by Somaya Solar near Kailashahar
These are the Somaya Solar projects closest to Kailashahar, with straight-line distances. They are shown as references and are not in Kailashahar unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1270 km from Kailashahar. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1400 km from Kailashahar. Completed in two months, with five years of operation and maintenance.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 1500 km from Kailashahar. Included net-metering coordination with the local electricity distribution company.
Questions about solar projects in Kailashahar
Which electricity company handles solar connections in Kailashahar?
Tripura State Electricity Corporation Limited (TSECL) is the distribution utility for Tripura and supplies Unakoti district.
Is net metering available for factories and commercial buildings in Kailashahar?
Net metering up to 10 kWp; group net metering and gross metering above that; surplus is not paid for non-domestic users. The rule is the same across Tripura.
How much electricity does a solar plant generate in Kailashahar?
About 1,230 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.3 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Kailashahar?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1520 km from Kailashahar in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1270 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Kailashahar
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)
- TERC (Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulations, 2024 (Tripura Gazette, 5 July 2024), First Amendment Regulations, 2025 (notified 18 December 2025); TERC draft Second Amendment of 16 October 2026
- TERC tariff order for TSECL for FY 2026-27, dated 4 May 2026 (tariff schedule, category H Industrial)
- TERC tariff order for TSECL, FY 2026-27 (4 May 2026), para 1.1.1