Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Teliamura, Tripura. Most of our published work is megawatt-scale rooftop plants on working industrial sites.

Local points for solar projects in Teliamura

The Government of India's One District One Product (ODOP) list names Scented Rice as the product of Khowai district.

Metering rules for business rooftops in Teliamura

In Tripura, rooftop solar for all consumer categories falls under the TERC (Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulations, 2024, published in the Tripura Gazette on 5 July 2024. The First Amendment was notified on 18 December 2025. A Second Amendment was published as a draft on 16 October 2026, and TERC still lists it under draft regulations.

The size limits, charges and other conditions for Tripura are on the page Commercial & Industrial Solar in Tripura.

In Teliamura the application for connection and metering goes to TSECL.

Output and bill value for a rooftop plant in Teliamura

A solar plant in Teliamura is modelled to produce about 1,220 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the Industrial, above 100 HP energy charge of ₹8.34 per kWh (TERC tariff order for TSECL for FY 2026-27, dated 4 May 2026, in force from 1 May 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The Industrial category is split by connected horsepower, not by voltage. A fixed charge of ₹280 per kW per month also applies. Time-of-day billing: energy charges are 80% of the normal rate from 9 AM to 5 PM and 140% from 5 PM to 10 PM for industrial users, and normal from 10 PM to 9 AM. A 3% rebate on the bill applies for payment within 5 working days. Bulk Supply is ₹8.66 per kWh with ₹210 per kW per month fixed. The rates exclude taxes and duties. The schedule applies throughout the state.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹8.34 per kWh
100 kW1.2 lakh units1,000 sq m₹10.2 lakh
250 kW3.0 lakh units2,500 sq m₹25.4 lakh
500 kW6.1 lakh units5,000 sq m₹50.9 lakh
1 MW12.2 lakh units10,000 sq m₹1.02 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

How a factory or commercial rooftop project runs

Rooftop plants on working buildings are planned around the roof, the load and the production schedule.

  • Roof check: sheet or concrete, load capacity, shading and safe access
  • Sizing against daytime load and sanctioned demand, within the metering rules above
  • Mounting design to suit the roof, including corrosion protection where the air is harsh
  • Installation in stages so production carries on
  • Testing, metering and connection with the electricity supplier
  • Monitoring and maintenance after handover, where contracted

More detail: Commercial & Industrial Solar across India.

Rooftop projects by Somaya Solar near Teliamura

These are the Somaya Solar projects closest to Teliamura, with straight-line distances. They are shown as references and are not in Teliamura unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1260 km from Teliamura. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1390 km from Teliamura. Completed in two months, with five years of operation and maintenance.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 1500 km from Teliamura. Included net-metering coordination with the local electricity distribution company.

See all published projects

Questions about solar projects in Teliamura

Which electricity company handles solar connections in Teliamura?

Tripura State Electricity Corporation Limited (TSECL) is the distribution utility for Tripura and supplies Khowai district.

Is net metering available for factories and commercial buildings in Teliamura?

Net metering up to 10 kWp; group net metering and gross metering above that; surplus is not paid for non-domestic users. The rule is the same across Tripura.

How much electricity does a solar plant generate in Teliamura?

About 1,220 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.2 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Teliamura?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1510 km from Teliamura in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1260 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Teliamura

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image