Somaya Solar Solutions Limited builds ground-mounted solar power plants in Teliamura, Tripura for businesses that want their own power and for landowners and developers who sell power to the grid.
Output and land for a ground-mounted plant in Teliamura
A solar plant in Teliamura is modelled to produce about 1,270 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (30°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 1 MW | 12.7 lakh units | 4 to 5 acres |
| 2 MW | 25.4 lakh units | 8 to 10 acres |
| 5 MW | 63.5 lakh units | 20 to 25 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
State policy and open access in Tripura
TERC's tariff order for 2026-27 says that, under the TERC Open Access Regulations, 2010, consumers with a connected load of 1 MW and above are allowed open access. The order sets the wheeling charge and the cross-subsidy surcharge for 2026-27.
The charges, exemptions and conditions for Tripura are on the page Ground-Mounted Solar Plant in Tripura.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Ground-mounted projects by Somaya Solar near Teliamura
These are the Somaya Solar projects closest to Teliamura, with straight-line distances. They are shown as references and are not in Teliamura unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1140 km from Teliamura. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1430 km from Teliamura. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Teliamura
Which electricity company handles solar connections in Teliamura?
Tripura State Electricity Corporation Limited (TSECL) is the distribution utility for Tripura and supplies Khowai district.
How much electricity does a solar plant generate in Teliamura?
About 1,270 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.7 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Teliamura?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1510 km from Teliamura in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1140 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Teliamura
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.