Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Katihar, Bihar. Most of our published work is megawatt-scale rooftop plants on working industrial sites.
Katihar: industrial areas
BIADA, the Bihar Industrial Area Development Authority, lists IE Katihar among its industrial areas in Katihar district.
The Government of India's One District One Product (ODOP) list names Jute, Makhana (Foxnut) and Maize as the products of Katihar district.
Metering rules for business rooftops in Katihar
In Bihar, any eligible consumer of NBPDCL or SBPDCL, including commercial and industrial consumers, can install rooftop solar under net metering or gross metering. The system must be at least 1 kWp and may not exceed the consumer's sanctioned or contracted load. The rules are in BERC's Rooftop Solar Grid Interactive Systems Based on Net and Gross Metering Regulations, 2018, as amended on 24 July 2024. On 8 October 2026 BERC published a draft Second Amendment for comment. It was not final when we checked.
The size limits, charges and other conditions for Bihar are on the page Commercial & Industrial Solar in Bihar.
In Katihar the application for connection and metering goes to NBPDCL.
Output and bill value for a rooftop plant in Katihar
A solar plant in Katihar is modelled to produce about 1,260 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industrial (HTIS-I, 11 kV, contract demand 50 to 1,500 kVA) energy charge of ₹7.98 per kVAh (BERC tariff order for NBPDCL and SBPDCL, dated 18 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The same rate applies in both NBPDCL and SBPDCL areas. A demand charge of ₹550 per kVA per month also applies. It is charged on the maximum demand recorded or 75% of the contract demand, whichever is higher, and demand above 105% of the contract demand is billed at twice the normal charge. The energy charge is ₹7.92 per kVAh for HTIS-II (33 kV, 500 to 15,000 kVA), ₹7.85 at 132 kV, ₹7.79 at 220 kV and ₹7.72 at 400 kV. Induction furnace consumers (HTSS) pay ₹4.94 per kVAh and ₹800 per kVA per month. Time-of-day rates apply to consumers above 10 kW from 1 April 2026: 80% of the energy charge from 9 am to 5 pm and 120% from 5 pm to 11 pm. The tariff is set without any Government of Bihar subsidy. It stays in force until 31 March 2027 or the next tariff order.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹7.98 per kVAh |
|---|---|---|---|
| 100 kW | 1.3 lakh units | 1,000 sq m | ₹10.1 lakh |
| 250 kW | 3.1 lakh units | 2,500 sq m | ₹25.1 lakh |
| 500 kW | 6.3 lakh units | 5,000 sq m | ₹50.3 lakh |
| 1 MW | 12.6 lakh units | 10,000 sq m | ₹1.01 crore |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
How a factory or commercial rooftop project runs
Rooftop plants on working buildings are planned around the roof, the load and the production schedule.
- Roof check: sheet or concrete, load capacity, shading and safe access
- Sizing against daytime load and sanctioned demand, within the metering rules above
- Mounting design to suit the roof, including corrosion protection where the air is harsh
- Installation in stages so production carries on
- Testing, metering and connection with the electricity supplier
- Monitoring and maintenance after handover, where contracted
More detail: Commercial & Industrial Solar across India.
Rooftop projects by Somaya Solar near Katihar
These are the Somaya Solar projects closest to Katihar, with straight-line distances. They are shown as references and are not in Katihar unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 800 km from Katihar. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 940 km from Katihar. Completed in two months, with five years of operation and maintenance.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 1050 km from Katihar. Included net-metering coordination with the local electricity distribution company.
Questions about solar projects in Katihar
Which electricity company handles solar connections in Katihar?
North Bihar Power Distribution Company Limited (NBPDCL) supplies electricity in Katihar district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Katihar?
Net or gross metering, up to the sanctioned load; draft change to a 500 kWp net metering cap is pending. The rule is the same across Bihar.
How much electricity does a solar plant generate in Katihar?
About 1,260 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 12.6 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Katihar?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1060 km from Katihar in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 800 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Katihar
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- BERC (Rooftop Solar Grid Interactive Systems Based on Net and Gross Metering) Regulations, 2018, consolidated text with the 1st Amendment of 24 July 2024 (BERC Compendium of Regulations Vol-II); BERC public notice No. 12 of 8 October 2026 with the draft Second Amendment
- BERC tariff order for NBPDCL and SBPDCL for 2026-27, dated 18 March 2026 (tariff schedule, Appendix 1), as published by NBPDCL; the same schedule is on the SBPDCL website
- BIADA website, Industrial Land > Available Land & Rates Details (Vacant Plot Details), by cluster and district
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- NBPDCL website, About Us > Organization
- PVGIS, European Commission Joint Research Centre (solar output model)