Somaya Solar Solutions Limited installs rooftop solar plants for factories, warehouses, institutions and commercial buildings in Bihar. Most of our published work is megawatt-scale rooftop plants on working industrial sites.
Metering rules for business rooftops in Bihar
In Bihar, any eligible consumer of NBPDCL or SBPDCL, including commercial and industrial consumers, can install rooftop solar under net metering or gross metering. The system must be at least 1 kWp and may not exceed the consumer's sanctioned or contracted load. The rules are in BERC's Rooftop Solar Grid Interactive Systems Based on Net and Gross Metering Regulations, 2018, as amended on 24 July 2024. On 8 October 2026 BERC published a draft Second Amendment for comment. It was not final when we checked.
- A consumer on net metering cannot also take gross metering. Neither arrangement allows banking.
- Under net metering the settlement period runs from 1 April to 31 March. Surplus energy left at the end of that period is neither paid for nor carried forward. Under gross metering the licensee pays the Feed-in Tariff approved by BERC for the year.
- Net metering is capped at 100 MW a year in each licensee's area. The total rooftop capacity on one distribution transformer may not exceed 80% of the transformer's capacity.
- The 2024 amendment says the licensee must finish the technical feasibility study within 15 days, or the proposal is treated as feasible. Applications up to 10 kW are deemed accepted without a study.
- The draft Second Amendment would cap net metering at 500 kWp or the sanctioned load, whichever is lower, allow gross metering up to the sanctioned load, and pay year-end surplus at 50% of the Feed-in Tariff. Comments were due by 28 October 2026 and the hearing was on 3 November 2026. Ask the licensee whether it has been notified.
- The state policy refers to virtual and group net metering but says only that they may be promoted with suitable regulations. The 2018 regulations do not mention them.
Output and bill value for a rooftop plant in Bihar
Solar output changes across Bihar with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,220 to 1,370 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Amarpur | 1,310 | 1,370 |
| Araria | 1,250 | 1,330 |
| Areraj | 1,340 | 1,420 |
| Arrah | 1,370 | 1,430 |
| Arwal | 1,370 | 1,440 |
| Aurangabad | 1,370 | 1,430 |
| Bagaha | 1,330 | 1,400 |
| Bahadurganj | 1,220 | 1,300 |
| Bairagnia | 1,330 | 1,410 |
| Bakhri | 1,320 | 1,390 |
| Bakhtiyarpur | 1,360 | 1,420 |
| Banka | 1,320 | 1,380 |
| Banmankhi Bazar | 1,280 | 1,350 |
| Barauli | 1,350 | 1,420 |
| Barauni | 1,350 | 1,420 |
| Barbigha | 1,360 | 1,430 |
| Barh | 1,360 | 1,420 |
| Barhiya | 1,330 | 1,400 |
| Begusarai | 1,340 | 1,410 |
| Belsand | 1,340 | 1,410 |
| Benipur | 1,320 | 1,390 |
| Bettiah | 1,340 | 1,420 |
| Bhabhua | 1,370 | 1,430 |
| Bhagalpur | 1,310 | 1,380 |
| Bihar Sharif | 1,360 | 1,430 |
| Bihariganj | 1,300 | 1,360 |
| Bihat | 1,340 | 1,410 |
| Bihta | 1,360 | 1,430 |
| Bikram | 1,370 | 1,440 |
| Bikramganj | 1,370 | 1,440 |
| Bodh Gaya | 1,360 | 1,430 |
| Buxar | 1,370 | 1,440 |
| Chakia | 1,340 | 1,410 |
| Chanpatia | 1,340 | 1,420 |
| Chapra | 1,360 | 1,430 |
| Colgong | 1,290 | 1,360 |
| Dalsingh Sarai | 1,340 | 1,410 |
| Darbhanga | 1,330 | 1,400 |
| Daudnagar | 1,370 | 1,440 |
| Dhaka | 1,340 | 1,420 |
| Dighwara | 1,360 | 1,430 |
| Dinapur Cantonment | 1,360 | 1,430 |
| Dinapur Nizamat | 1,360 | 1,430 |
| Dumraon | 1,370 | 1,440 |
| Fatwa | 1,350 | 1,420 |
| Forbesganj | 1,250 | 1,330 |
| Gaya | 1,360 | 1,430 |
| Gogri Jamalpur | 1,320 | 1,380 |
| Gopalganj | 1,350 | 1,430 |
| Hajipur | 1,360 | 1,430 |
| Hilsa | 1,360 | 1,430 |
| Hisua | 1,360 | 1,420 |
| Islampur | 1,370 | 1,430 |
| Jagdispur | 1,370 | 1,440 |
| Jahanabad | 1,370 | 1,440 |
| Jainagar | 1,290 | 1,370 |
| Jamalpur | 1,330 | 1,390 |
| Jamui | 1,350 | 1,410 |
| Jhajha | 1,340 | 1,410 |
| Jhanjharpur | 1,300 | 1,370 |
| Jogbani | 1,250 | 1,330 |
| Kasba | 1,260 | 1,330 |
| Kataiya | 1,360 | 1,430 |
| Katihar | 1,260 | 1,330 |
| Khagaria | 1,320 | 1,390 |
| Khagaul | 1,360 | 1,420 |
| Kharagpur | 1,320 | 1,380 |
| Kishanganj | 1,240 | 1,310 |
| Koelwar | 1,360 | 1,430 |
| Lalganj | 1,350 | 1,420 |
| Luckeesarai | 1,350 | 1,410 |
| Madhepura | 1,290 | 1,360 |
| Madhubani | 1,310 | 1,380 |
| Maharajgani | 1,360 | 1,430 |
| Mahnar Bazar | 1,350 | 1,420 |
| Mairwa | 1,370 | 1,440 |
| Makhdumpur | 1,370 | 1,430 |
| Maner | 1,370 | 1,430 |
| Manihari | 1,270 | 1,340 |
| Marhaura | 1,360 | 1,430 |
| Masaurhi Buzurg | 1,360 | 1,430 |
| Mehsi | 1,340 | 1,410 |
| Mokameh | 1,350 | 1,410 |
| Mothihari | 1,340 | 1,420 |
| Motipur | 1,340 | 1,410 |
| Munger | 1,330 | 1,390 |
| Murliganj | 1,290 | 1,360 |
| Muzaffarpur | 1,340 | 1,410 |
| Nabinagar | 1,370 | 1,430 |
| Narkatiaganj | 1,320 | 1,400 |
| Nasriganj | 1,370 | 1,440 |
| Naubatpur | 1,370 | 1,440 |
| Naugachhia | 1,290 | 1,360 |
| Nawada | 1,360 | 1,420 |
| Nirmali | 1,280 | 1,350 |
| Nokha | 1,370 | 1,440 |
| Pakridayal | 1,340 | 1,420 |
| Patna | 1,360 | 1,420 |
| Phulwari Sharif | 1,360 | 1,420 |
| Piro | 1,370 | 1,440 |
| Purnia | 1,270 | 1,340 |
| Rafiganj | 1,370 | 1,430 |
| Rajauli | 1,360 | 1,430 |
| Rajgir | 1,370 | 1,430 |
| Ramnagar | 1,320 | 1,400 |
| Raxaul | 1,340 | 1,420 |
| Revelganj | 1,360 | 1,430 |
| Rosera | 1,320 | 1,390 |
| Saharsa | 1,300 | 1,370 |
| Sahibganj | 1,340 | 1,420 |
| Samastipur | 1,330 | 1,400 |
| Sasaram | 1,370 | 1,440 |
| Sheikhpura | 1,350 | 1,410 |
| Sheohar | 1,340 | 1,410 |
| Sherghati | 1,370 | 1,430 |
| Silao | 1,370 | 1,430 |
| Sitamarhi | 1,340 | 1,410 |
| Siwan | 1,360 | 1,440 |
| Sonepur | 1,360 | 1,430 |
| Sultanganj | 1,320 | 1,390 |
| Supaul | 1,300 | 1,370 |
| Teghra | 1,350 | 1,420 |
| Tekari | 1,370 | 1,440 |
| Waris Aliganj | 1,360 | 1,420 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
How a factory or commercial rooftop project runs
Rooftop plants on working buildings are planned around the roof, the load and the production schedule.
- Roof check: sheet or concrete, load capacity, shading and safe access
- Sizing against daytime load and sanctioned demand, within the metering rules above
- Mounting design to suit the roof, including corrosion protection where the air is harsh
- Installation in stages so production carries on
- Testing, metering and connection with the electricity supplier
- Monitoring and maintenance after handover, where contracted
More detail: Commercial & Industrial Solar across India.
Questions about solar projects in Bihar
Is net metering available for factories and commercial buildings in Bihar?
In Bihar, any eligible consumer of NBPDCL or SBPDCL, including commercial and industrial consumers, can install rooftop solar under net metering or gross metering. The system must be at least 1 kWp and may not exceed the consumer's sanctioned or contracted load. The rules are in BERC's Rooftop Solar Grid Interactive Systems Based on Net and Gross Metering Regulations, 2018, as amended on 24 July 2024. On 8 October 2026 BERC published a draft Second Amendment for comment. It was not final when we checked.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Bihar
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- BERC (Rooftop Solar Grid Interactive Systems Based on Net and Gross Metering) Regulations, 2018, consolidated text with the 1st Amendment of 24 July 2024 (BERC Compendium of Regulations Vol-II); BERC public notice No. 12 of 8 October 2026 with the draft Second Amendment
- PVGIS, European Commission Joint Research Centre (solar output model)