Ground-Mounted Solar Power Plant in Bihar

Somaya Solar Solutions Limited builds ground-mounted solar power plants in Bihar for businesses that want their own power and for landowners and developers who sell power to the grid.

Output and land for a ground-mounted plant in Bihar

Solar output changes across Bihar with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,300 to 1,440 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Amarpur1,3101,370
Araria1,2501,330
Areraj1,3401,420
Arrah1,3701,430
Arwal1,3701,440
Aurangabad1,3701,430
Bagaha1,3301,400
Bahadurganj1,2201,300
Bairagnia1,3301,410
Bakhri1,3201,390
Bakhtiyarpur1,3601,420
Banka1,3201,380
Banmankhi Bazar1,2801,350
Barauli1,3501,420
Barauni1,3501,420
Barbigha1,3601,430
Barh1,3601,420
Barhiya1,3301,400
Begusarai1,3401,410
Belsand1,3401,410
Benipur1,3201,390
Bettiah1,3401,420
Bhabhua1,3701,430
Bhagalpur1,3101,380
Bihar Sharif1,3601,430
Bihariganj1,3001,360
Bihat1,3401,410
Bihta1,3601,430
Bikram1,3701,440
Bikramganj1,3701,440
Bodh Gaya1,3601,430
Buxar1,3701,440
Chakia1,3401,410
Chanpatia1,3401,420
Chapra1,3601,430
Colgong1,2901,360
Dalsingh Sarai1,3401,410
Darbhanga1,3301,400
Daudnagar1,3701,440
Dhaka1,3401,420
Dighwara1,3601,430
Dinapur Cantonment1,3601,430
Dinapur Nizamat1,3601,430
Dumraon1,3701,440
Fatwa1,3501,420
Forbesganj1,2501,330
Gaya1,3601,430
Gogri Jamalpur1,3201,380
Gopalganj1,3501,430
Hajipur1,3601,430
Hilsa1,3601,430
Hisua1,3601,420
Islampur1,3701,430
Jagdispur1,3701,440
Jahanabad1,3701,440
Jainagar1,2901,370
Jamalpur1,3301,390
Jamui1,3501,410
Jhajha1,3401,410
Jhanjharpur1,3001,370
Jogbani1,2501,330
Kasba1,2601,330
Kataiya1,3601,430
Katihar1,2601,330
Khagaria1,3201,390
Khagaul1,3601,420
Kharagpur1,3201,380
Kishanganj1,2401,310
Koelwar1,3601,430
Lalganj1,3501,420
Luckeesarai1,3501,410
Madhepura1,2901,360
Madhubani1,3101,380
Maharajgani1,3601,430
Mahnar Bazar1,3501,420
Mairwa1,3701,440
Makhdumpur1,3701,430
Maner1,3701,430
Manihari1,2701,340
Marhaura1,3601,430
Masaurhi Buzurg1,3601,430
Mehsi1,3401,410
Mokameh1,3501,410
Mothihari1,3401,420
Motipur1,3401,410
Munger1,3301,390
Murliganj1,2901,360
Muzaffarpur1,3401,410
Nabinagar1,3701,430
Narkatiaganj1,3201,400
Nasriganj1,3701,440
Naubatpur1,3701,440
Naugachhia1,2901,360
Nawada1,3601,420
Nirmali1,2801,350
Nokha1,3701,440
Pakridayal1,3401,420
Patna1,3601,420
Phulwari Sharif1,3601,420
Piro1,3701,440
Purnia1,2701,340
Rafiganj1,3701,430
Rajauli1,3601,430
Rajgir1,3701,430
Ramnagar1,3201,400
Raxaul1,3401,420
Revelganj1,3601,430
Rosera1,3201,390
Saharsa1,3001,370
Sahibganj1,3401,420
Samastipur1,3301,400
Sasaram1,3701,440
Sheikhpura1,3501,410
Sheohar1,3401,410
Sherghati1,3701,430
Silao1,3701,430
Sitamarhi1,3401,410
Siwan1,3601,440
Sonepur1,3601,430
Sultanganj1,3201,390
Supaul1,3001,370
Teghra1,3501,420
Tekari1,3701,440
Waris Aliganj1,3601,420

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

State policy and open access in Bihar

The Bihar Policy for Promotion of Bihar New and Renewable Energy Sources 2025 is the state's current policy for solar and other renewable projects. The Energy Department, Government of Bihar issued it on 10 July 2025. It stays in force for five years or until a new policy replaces it. Projects commissioned in that time get the incentives for up to 25 years from commissioning.

  • Target: 23,968 MW of renewable power and 6,100 MWh of energy storage by FY 2029-30. Rooftop solar has its own target of 500 MW.
  • BREDA is the State Nodal Agency for renewable projects. Bihar State Power Generation Company Limited (BSPGCL) develops floating and ground-mounted solar above 1 MW and solar along canals and dams.
  • Rooftop solar of up to 1,000 kWp within a consumer's premises is allowed under net metering, virtual net metering or gross metering, with third-party sale allowed and Capex, RESCO or hybrid RESCO modes.
  • Captive and open access consumers get a 100% exemption from electricity duty on power from renewable projects in the state, for 15 years from commissioning. The duty is reimbursed from the utility.
  • Captive use of solar is allowed with no capacity limit, subject to grid injection approval. The policy also says banking of 100% of renewable energy is permitted and that transmission and wheeling charges are exempt for 15 years. Banking charges and open access charges follow BERC regulations.

Under BERC's Green Energy Open Access Regulations, 2024, a consumer with a contract demand or sanctioned load of 100 kW or more (on one connection or several in the same electricity division) can take renewable power through open access. The regulations came into force when they were published in the Bihar Gazette on 23 December 2024.

  • A captive renewable plant has no capacity restriction against the consumer's contract demand, and there is no limit on the quantum of power a captive consumer can take.
  • Banking is allowed with a charge of 8% of the energy banked, taken in kind. From April to October banked energy cannot be drawn in peak hours. The banking cycle is two consecutive financial quarters, and unused banked energy lapses at the end of the cycle.
  • For 2026-27 the tariff order sets a cross-subsidy surcharge of ₹1.77 per kWh in NBPDCL's area and ₹1.68 per kWh in SBPDCL's area, for 11 kV, 33 kV and 132 kV and above. The regulations say the cross-subsidy surcharge and the additional surcharge are not levied on power from a captive plant.
  • For 2026-27 the Commission has not set an additional surcharge for open access consumers. It told the distribution companies to file separate petitions for it.
  • Wheeling charges for 2026-27 are 52 paise per kWh (NBPDCL) and 53 paise (SBPDCL) at 33 kV, and 53 paise (NBPDCL) and 57 paise (SBPDCL) at 11 kV, plus wheeling losses.
  • Standby charges are 125% of the energy charge of the consumer's category. Buying green energy from the distribution company costs ₹0.68 per kWh over the normal tariff in 2026-27, on a requisition of at least one year.

What a ground-mounted project involves

A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.

  • Land check: title, slope, soil, drainage, access road and shading
  • Distance to the substation or connection point and the line needed to reach it
  • Layout, structure design and foundations for the soil
  • Supply, installation, testing and commissioning
  • Evacuation line, metering and connection approvals
  • Fencing, cleaning water and maintenance planning

More detail: Ground-Mounted Solar Plant across India.

Questions about solar projects in Bihar

How much land does a solar plant need?

A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Bihar

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.