Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Bihar as an EPC contractor: engineering, supply, construction and commissioning.
What Bihar's policy says about large solar plants
The Bihar Policy for Promotion of Bihar New and Renewable Energy Sources 2025 is the state's current policy for solar and other renewable projects. The Energy Department, Government of Bihar issued it on 10 July 2025. It stays in force for five years or until a new policy replaces it. Projects commissioned in that time get the incentives for up to 25 years from commissioning.
- Target: 23,968 MW of renewable power and 6,100 MWh of energy storage by FY 2029-30. Rooftop solar has its own target of 500 MW.
- BREDA is the State Nodal Agency for renewable projects. Bihar State Power Generation Company Limited (BSPGCL) develops floating and ground-mounted solar above 1 MW and solar along canals and dams.
- Rooftop solar of up to 1,000 kWp within a consumer's premises is allowed under net metering, virtual net metering or gross metering, with third-party sale allowed and Capex, RESCO or hybrid RESCO modes.
- Captive and open access consumers get a 100% exemption from electricity duty on power from renewable projects in the state, for 15 years from commissioning. The duty is reimbursed from the utility.
- Captive use of solar is allowed with no capacity limit, subject to grid injection approval. The policy also says banking of 100% of renewable energy is permitted and that transmission and wheeling charges are exempt for 15 years. Banking charges and open access charges follow BERC regulations.
Under BERC's Green Energy Open Access Regulations, 2024, a consumer with a contract demand or sanctioned load of 100 kW or more (on one connection or several in the same electricity division) can take renewable power through open access. The regulations came into force when they were published in the Bihar Gazette on 23 December 2024.
- A captive renewable plant has no capacity restriction against the consumer's contract demand, and there is no limit on the quantum of power a captive consumer can take.
- Banking is allowed with a charge of 8% of the energy banked, taken in kind. From April to October banked energy cannot be drawn in peak hours. The banking cycle is two consecutive financial quarters, and unused banked energy lapses at the end of the cycle.
- For 2026-27 the tariff order sets a cross-subsidy surcharge of ₹1.77 per kWh in NBPDCL's area and ₹1.68 per kWh in SBPDCL's area, for 11 kV, 33 kV and 132 kV and above. The regulations say the cross-subsidy surcharge and the additional surcharge are not levied on power from a captive plant.
- For 2026-27 the Commission has not set an additional surcharge for open access consumers. It told the distribution companies to file separate petitions for it.
- Wheeling charges for 2026-27 are 52 paise per kWh (NBPDCL) and 53 paise (SBPDCL) at 33 kV, and 53 paise (NBPDCL) and 57 paise (SBPDCL) at 11 kV, plus wheeling losses.
- Standby charges are 125% of the energy charge of the consumer's category. Buying green energy from the distribution company costs ₹0.68 per kWh over the normal tariff in 2026-27, on a requisition of at least one year.
Output and land at megawatt scale in Bihar
Solar output changes across Bihar with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,300 to 1,440 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Amarpur | 1,310 | 1,370 |
| Araria | 1,250 | 1,330 |
| Areraj | 1,340 | 1,420 |
| Arrah | 1,370 | 1,430 |
| Arwal | 1,370 | 1,440 |
| Aurangabad | 1,370 | 1,430 |
| Bagaha | 1,330 | 1,400 |
| Bahadurganj | 1,220 | 1,300 |
| Bairagnia | 1,330 | 1,410 |
| Bakhri | 1,320 | 1,390 |
| Bakhtiyarpur | 1,360 | 1,420 |
| Banka | 1,320 | 1,380 |
| Banmankhi Bazar | 1,280 | 1,350 |
| Barauli | 1,350 | 1,420 |
| Barauni | 1,350 | 1,420 |
| Barbigha | 1,360 | 1,430 |
| Barh | 1,360 | 1,420 |
| Barhiya | 1,330 | 1,400 |
| Begusarai | 1,340 | 1,410 |
| Belsand | 1,340 | 1,410 |
| Benipur | 1,320 | 1,390 |
| Bettiah | 1,340 | 1,420 |
| Bhabhua | 1,370 | 1,430 |
| Bhagalpur | 1,310 | 1,380 |
| Bihar Sharif | 1,360 | 1,430 |
| Bihariganj | 1,300 | 1,360 |
| Bihat | 1,340 | 1,410 |
| Bihta | 1,360 | 1,430 |
| Bikram | 1,370 | 1,440 |
| Bikramganj | 1,370 | 1,440 |
| Bodh Gaya | 1,360 | 1,430 |
| Buxar | 1,370 | 1,440 |
| Chakia | 1,340 | 1,410 |
| Chanpatia | 1,340 | 1,420 |
| Chapra | 1,360 | 1,430 |
| Colgong | 1,290 | 1,360 |
| Dalsingh Sarai | 1,340 | 1,410 |
| Darbhanga | 1,330 | 1,400 |
| Daudnagar | 1,370 | 1,440 |
| Dhaka | 1,340 | 1,420 |
| Dighwara | 1,360 | 1,430 |
| Dinapur Cantonment | 1,360 | 1,430 |
| Dinapur Nizamat | 1,360 | 1,430 |
| Dumraon | 1,370 | 1,440 |
| Fatwa | 1,350 | 1,420 |
| Forbesganj | 1,250 | 1,330 |
| Gaya | 1,360 | 1,430 |
| Gogri Jamalpur | 1,320 | 1,380 |
| Gopalganj | 1,350 | 1,430 |
| Hajipur | 1,360 | 1,430 |
| Hilsa | 1,360 | 1,430 |
| Hisua | 1,360 | 1,420 |
| Islampur | 1,370 | 1,430 |
| Jagdispur | 1,370 | 1,440 |
| Jahanabad | 1,370 | 1,440 |
| Jainagar | 1,290 | 1,370 |
| Jamalpur | 1,330 | 1,390 |
| Jamui | 1,350 | 1,410 |
| Jhajha | 1,340 | 1,410 |
| Jhanjharpur | 1,300 | 1,370 |
| Jogbani | 1,250 | 1,330 |
| Kasba | 1,260 | 1,330 |
| Kataiya | 1,360 | 1,430 |
| Katihar | 1,260 | 1,330 |
| Khagaria | 1,320 | 1,390 |
| Khagaul | 1,360 | 1,420 |
| Kharagpur | 1,320 | 1,380 |
| Kishanganj | 1,240 | 1,310 |
| Koelwar | 1,360 | 1,430 |
| Lalganj | 1,350 | 1,420 |
| Luckeesarai | 1,350 | 1,410 |
| Madhepura | 1,290 | 1,360 |
| Madhubani | 1,310 | 1,380 |
| Maharajgani | 1,360 | 1,430 |
| Mahnar Bazar | 1,350 | 1,420 |
| Mairwa | 1,370 | 1,440 |
| Makhdumpur | 1,370 | 1,430 |
| Maner | 1,370 | 1,430 |
| Manihari | 1,270 | 1,340 |
| Marhaura | 1,360 | 1,430 |
| Masaurhi Buzurg | 1,360 | 1,430 |
| Mehsi | 1,340 | 1,410 |
| Mokameh | 1,350 | 1,410 |
| Mothihari | 1,340 | 1,420 |
| Motipur | 1,340 | 1,410 |
| Munger | 1,330 | 1,390 |
| Murliganj | 1,290 | 1,360 |
| Muzaffarpur | 1,340 | 1,410 |
| Nabinagar | 1,370 | 1,430 |
| Narkatiaganj | 1,320 | 1,400 |
| Nasriganj | 1,370 | 1,440 |
| Naubatpur | 1,370 | 1,440 |
| Naugachhia | 1,290 | 1,360 |
| Nawada | 1,360 | 1,420 |
| Nirmali | 1,280 | 1,350 |
| Nokha | 1,370 | 1,440 |
| Pakridayal | 1,340 | 1,420 |
| Patna | 1,360 | 1,420 |
| Phulwari Sharif | 1,360 | 1,420 |
| Piro | 1,370 | 1,440 |
| Purnia | 1,270 | 1,340 |
| Rafiganj | 1,370 | 1,430 |
| Rajauli | 1,360 | 1,430 |
| Rajgir | 1,370 | 1,430 |
| Ramnagar | 1,320 | 1,400 |
| Raxaul | 1,340 | 1,420 |
| Revelganj | 1,360 | 1,430 |
| Rosera | 1,320 | 1,390 |
| Saharsa | 1,300 | 1,370 |
| Sahibganj | 1,340 | 1,420 |
| Samastipur | 1,330 | 1,400 |
| Sasaram | 1,370 | 1,440 |
| Sheikhpura | 1,350 | 1,410 |
| Sheohar | 1,340 | 1,410 |
| Sherghati | 1,370 | 1,430 |
| Silao | 1,370 | 1,430 |
| Sitamarhi | 1,340 | 1,410 |
| Siwan | 1,360 | 1,440 |
| Sonepur | 1,360 | 1,430 |
| Sultanganj | 1,320 | 1,390 |
| Supaul | 1,300 | 1,370 |
| Teghra | 1,350 | 1,420 |
| Tekari | 1,370 | 1,440 |
| Waris Aliganj | 1,360 | 1,420 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Questions about solar projects in Bihar
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Bihar
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- BERC (Green Energy Open Access) Regulations, 2024, notified 9 December 2024, Bihar Gazette (Extra) 23 December 2024; BERC tariff order for NBPDCL and SBPDCL for 2026-27, dated 18 March 2026 (chapters 8 and 9)
- Bihar Policy for Promotion of Bihar New and Renewable Energy Sources 2025, Energy Department, Government of Bihar (scanned PDF); MNRE Policy & Regulatory Updates, July 2025, item V.1, gives the date 10 July 2025
- PVGIS, European Commission Joint Research Centre (solar output model)