Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Kolasib, Mizoram as an EPC contractor: engineering, supply, construction and commissioning.
What Mizoram's policy says about large solar plants
The Solar Power Policy of Mizoram, 2025 is the state's current solar policy. The Governor notified it on 25 February 2025 and it stays in force until a new policy replaces it or a further order is made. The State Government decided to review the earlier Solar Power Policy of 2017.
Under the JERC Open Access Regulations, 2010 that MZERC adopted, open access is allowed for consumers with a connected load of 1 MW and above. The JERC green energy open access charges regulations, also adopted by MZERC, cover consumers with a contracted demand or sanctioned load of 100 kW or more, except captive users.
The charges, exemptions and conditions for Mizoram are on the page Utility-Scale Solar in Mizoram.
Output and land at megawatt scale in Kolasib
A solar plant in Kolasib is modelled to produce about 1,320 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (30°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 5 MW | 66.0 lakh units | 20 to 25 acres |
| 10 MW | 1.32 crore units | 40 to 50 acres |
| 25 MW | 3.30 crore units | 100 to 125 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Megawatt-scale ground-mounted work by Somaya Solar near Kolasib
These are the Somaya Solar projects closest to Kolasib, with straight-line distances. They are shown as references and are not in Kolasib unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 1250 km from Kolasib. Completed, including the transmission line work coordinated with the local distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1500 km from Kolasib. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Kolasib
Which electricity company handles solar connections in Kolasib?
Power & Electricity Department, Government of Mizoram (P&ED) is the distribution utility for Mizoram and supplies Kolasib district.
How much electricity does a solar plant generate in Kolasib?
About 1,320 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.2 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Kolasib?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1590 km from Kolasib in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 1250 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Kolasib
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- MZERC tariff order for P&ED Mizoram for FY 2026-27, dated 25 March 2026 (Table 9.5); JERC Open Access Regulations, 2010; JERC Green Energy Open Access Charges Regulations, 9 April 2024; both adopted by MZERC on 26 July 2024
- MZERC tariff order for P&ED, FY 2026-27 (25 March 2026), para 1
- PVGIS, European Commission Joint Research Centre (solar output model)
- Solar Power Policy of Mizoram, 2025 (Power & Electricity Department, Government of Mizoram; Mizoram Gazette Extraordinary, 28 February 2025)