Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Kotdwara, Uttarakhand as an EPC contractor: engineering, supply, construction and commissioning.
What Uttarakhand's policy says about large solar plants
The Uttarakhand State Solar Policy, 2023 is the state's current solar policy. It replaced the Solar Energy Policy of 2013 and stays valid until another policy replaces it. The regulator applied it in an order of 13 October 2026.
Under the UERC (Green Energy Open Access) Regulations, 2023, a consumer with a contracted demand or sanctioned load of 100 kW or more can take renewable power through open access. The 100 kW can be one connection or several connections of the same consumer in the same electricity division.
The charges, exemptions and conditions for Uttarakhand are on the page Utility-Scale Solar in Uttarakhand.
Output and land at megawatt scale in Kotdwara
A solar plant in Kotdwara is modelled to produce about 1,440 units (kWh) a year for each kW installed, for a ground-mounted array at the best fixed tilt (33°).
| Plant size | Modelled output a year | Land needed (typical) |
|---|---|---|
| 5 MW | 72.0 lakh units | 20 to 25 acres |
| 10 MW | 1.44 crore units | 40 to 50 acres |
| 25 MW | 3.60 crore units | 100 to 125 acres |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Megawatt-scale ground-mounted work by Somaya Solar near Kotdwara
These are the Somaya Solar projects closest to Kotdwara, with straight-line distances. They are shown as references and are not in Kotdwara unless the line says so.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 90 km from Kotdwara. In progress. Site access was difficult and was handled with local support.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 680 km from Kotdwara. Completed, including the transmission line work coordinated with the local distribution company.
Questions about solar projects in Kotdwara
Which electricity company handles solar connections in Kotdwara?
Uttarakhand Power Corporation Limited (UPCL) is the distribution utility for Uttarakhand and supplies Pauri Garhwal district.
How much electricity does a solar plant generate in Kotdwara?
About 1,440 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.4 lakh units a year. A site study gives the figure to plan on.
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based, and how far is that from Kotdwara?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 160 km from Kotdwara in a straight line. The closest published project is KUSUM-A, Bhavnath Singh (2.4 MW ground-mounted plant under PM-KUSUM Component A) in Amroha, about 90 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Kotdwara
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)
- UERC (Green Energy Open Access) Regulations, 2023, notified 18 October 2023; UERC tariff order for UPCL for 2026-27, dated 30 March 2026; UERC additional surcharge order of 28 September 2026
- UERC tariff order for UPCL, 2026-27 (30 March 2026), section 6.1
- Uttarakhand State Solar Policy, 2023 (Government of Uttarakhand, published by UREDA), and UERC order of 13 October 2026 in Misc. Application No. 08 of 2026