Utility-Scale Solar Power Plant Installation in Uttarakhand

Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Uttarakhand as an EPC contractor: engineering, supply, construction and commissioning.

What Uttarakhand's policy says about large solar plants

The Uttarakhand State Solar Policy, 2023 is the state's current solar policy. It replaced the Solar Energy Policy of 2013 and stays valid until another policy replaces it. The regulator applied it in an order of 13 October 2026.

  • Target: 2,500 MW of solar capacity in the state by December 2027, of which 750 MW is to come from commercial and industrial consumers.
  • Uttarakhand Renewable Energy Development Agency (UREDA) is the nodal agency. Behind-the-meter projects must be registered with UREDA and inspected by the Chief Electrical Inspector.
  • Commercial and industrial consumers may install rooftop solar up to their sanctioned load, within the ceiling the regulator sets. Both CAPEX and OPEX models are allowed.
  • Commercial and industrial establishments in urban areas with a connected load of 100 kW or a contract demand of 120 kVA and above must meet at least 20% of their yearly energy needs from renewable sources.
  • Captive plants: a behind-the-meter captive rooftop plant that does not export to the grid has no capacity limit. Grid-connected captive and group captive solar projects get a 100% exemption from transmission and wheeling charges for 5 years from commissioning, and an exemption from cross-subsidy surcharge and additional surcharge. Transmission and distribution losses still apply.

Under the UERC (Green Energy Open Access) Regulations, 2023, a consumer with a contracted demand or sanctioned load of 100 kW or more can take renewable power through open access. The 100 kW can be one connection or several connections of the same consumer in the same electricity division.

  • There is no minimum load for captive consumers.
  • Banked energy carries a charge of 8%, taken in units. Banking is allowed only within the billing cycle, and banked energy not used by the end of the cycle lapses.
  • The regulations set the quantity a consumer is permitted to bank at "at least 30%" of its monthly consumption from UPCL.
  • For 2026-27 the tariff order sets a cross-subsidy surcharge of ₹0.56 per kWh for HT industrial consumers. The additional surcharge is ₹0.67 per unit from 1 October 2026 to 31 March 2027, set by a separate order of 28 September 2026.
  • Under the regulations, the cross-subsidy surcharge is not charged on power a consumer takes from its own captive plant, and the additional surcharge does not apply to UPCL consumers who opt for green energy open access.
  • For 2026-27 the wheeling charge is ₹18,867 per MW per day and the distribution loss applied to open access is 12.25%. In its order of 13 October 2026 the regulator told UPCL to apply the Solar Policy's exemptions to a captive solar project.

Output and land at megawatt scale in Uttarakhand

Solar output changes across Uttarakhand with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,370 to 1,480 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Almora1,3401,430
Bazpur1,3801,480
Clement Town1,3401,440
Dehradun1,3401,450
Haldwani1,3701,460
Haridwar1,3701,470
Jaspur1,3701,460
Kashipur1,3901,480
Kichha1,3801,470
Kotdwara1,3401,440
Manglaur1,3801,480
Mussoorie1,3301,420
Naini Tal1,3601,460
Pauri1,2901,400
Pithoragarh1,2801,370
Ramnagar1,3601,460
Rishikesh1,3301,420
Roorkee1,3801,480
Rudrapur1,3901,480
Sitarganj1,3701,470
Srinagar1,3001,400
Tehri1,3201,430

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

What utility-scale work involves

At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.

  • Land and grid-connection feasibility
  • Detailed engineering for the plant and the evacuation system
  • Procurement and logistics for modules, inverters, transformers and structures
  • Civil, mechanical and electrical construction with several teams working in parallel
  • Testing, commissioning and connection with the transmission or distribution utility
  • Operation and maintenance, where contracted

More detail: Utility-Scale Solar across India.

Questions about solar projects in Uttarakhand

How much land does a solar plant need?

A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh. Its published projects in Uttarakhand are: Naini Papers Limited (3 MW rooftop plant, Kashipur); Akums Limited (2.3 MW rooftop plant, SIDCUL, Haridwar); Luminous (1 MW rooftop plant, Haridwar).

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Uttarakhand

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 17 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.