Turnkey Solar EPC Solutions in Uttarakhand

Somaya Solar Solutions Limited delivers turnkey solar projects in Uttarakhand: one contract that runs from the first survey to a commissioned plant with its approvals in place.

What turnkey means in practice

In a turnkey contract you hand over the site and the requirement and take back a working plant. One contract covers every step in between.

  • One price and one schedule covering design, supply, installation and commissioning
  • Approvals and metering paperwork handled by the contractor
  • Defined tests before handover, with drawings, warranties and manuals
  • A named point of contact through the project
  • Operation and maintenance after handover, where contracted

More detail: Turnkey Solar EPC across India.

Steps in a turnkey project in Uttarakhand

  1. Survey of the site and a study of twelve months of bills
  2. Design, drawings and a fixed-price proposal
  3. Application to the electricity supplier for connection and metering
  4. Equipment supply and installation
  5. Testing, inspection and commissioning
  6. Handover with drawings, warranties and monitoring access

Approvals a turnkey contract covers in Uttarakhand

In Uttarakhand, a commercial or industrial consumer of UPCL can install rooftop or small solar under net metering up to 100% of the sanctioned load or contract demand, with a ceiling of 1 MW. The rule is in Regulation 37 of the regulator's renewable energy regulations of 2023, as rewritten by the first amendment of 20 June 2024.

  • Energy is settled on a net basis at the end of each billing period, which is one month.
  • If the consumer exports more than it draws in a billing period, UPCL pays for the surplus at the regulator's generic tariff or the rate found through bidding, whichever is lower. The generic tariff is ₹2.00 per kWh for plants commissioned in 2026-27.
  • The total rooftop capacity connected to one transformer may not exceed the capacity of that transformer.
  • Group net metering lets one consumer set off surplus energy against its other connections in UPCL's area. A plant under group or virtual net metering must be between 5 kW and 75 kW. Virtual net metering is only for domestic consumers and offices of government and local authorities.
  • The latest amendment is the second amendment, notified on 27 November 2025. It deals with battery energy storage and left the rooftop limits unchanged. In its reasons the regulator declined a request to remove the 1 MW ceiling.
  • A consumer who needs more than 1 MW can set up a captive plant. The regulator has said a captive plant has no capacity restriction.

What to expect from the plant in Uttarakhand

Solar output changes across Uttarakhand with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,280 to 1,390 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Almora1,3401,430
Bazpur1,3801,480
Clement Town1,3401,440
Dehradun1,3401,450
Haldwani1,3701,460
Haridwar1,3701,470
Jaspur1,3701,460
Kashipur1,3901,480
Kichha1,3801,470
Kotdwara1,3401,440
Manglaur1,3801,480
Mussoorie1,3301,420
Naini Tal1,3601,460
Pauri1,2901,400
Pithoragarh1,2801,370
Ramnagar1,3601,460
Rishikesh1,3301,420
Roorkee1,3801,480
Rudrapur1,3901,480
Sitarganj1,3701,470
Srinagar1,3001,400
Tehri1,3201,430

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Reference projects in Uttarakhand

Somaya Solar's published projects in Uttarakhand:

  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand. Completed in two months, with five years of operation and maintenance.
  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand. Included net-metering coordination with the local electricity distribution company.

See all published projects

Questions about solar projects in Uttarakhand

Is net metering available for factories and commercial buildings in Uttarakhand?

In Uttarakhand, a commercial or industrial consumer of UPCL can install rooftop or small solar under net metering up to 100% of the sanctioned load or contract demand, with a ceiling of 1 MW. The rule is in Regulation 37 of the regulator's renewable energy regulations of 2023, as rewritten by the first amendment of 20 June 2024.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh. Its published projects in Uttarakhand are: Naini Papers Limited (3 MW rooftop plant, Kashipur); Akums Limited (2.3 MW rooftop plant, SIDCUL, Haridwar); Luminous (1 MW rooftop plant, Haridwar).

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Uttarakhand

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 17 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image