Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Clement Town, Uttarakhand.

Clement Town at a glance for solar projects

District and stateDehradun district, Uttarakhand
Electricity supplyUttarakhand Power Corporation Limited (UPCL) is the distribution utility for Uttarakhand and supplies Dehradun district.
Electricity regulatorUttarakhand Electricity Regulatory Commission (UERC)
State renewable energy agencyUttarakhand Renewable Energy Development Agency (UREDA)
State solar policyUttarakhand State Solar Policy, 2023 (in force until another policy replaces it; targets run to December 2027)
Rooftop metering for businessesNet metering up to 1 MW, within the sanctioned load
Modelled solar outputabout 1,340 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 190 km from Clement Town in a straight line

Solar services in Clement Town

Local points for solar projects in Clement Town

The Government of India's One District One Product (ODOP) list names Bakery as the product of Dehradun district.

Solar output in Clement Town

A solar plant in Clement Town is modelled to produce about 1,340 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industry (RTS-5), contracted load above 88 kVA or 75 kW, load factor up to 50% energy charge of ₹6.85 per kVAh (UERC tariff order for UPCL for 2026-27, dated 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹6.60 per kVAh in the load factor slab above 50%. A demand charge also applies each month: ₹410 per kVA of billable demand for contracted load up to 1,000 kVA and ₹480 per kVA above 1,000 kVA. Time-of-day rates apply: ₹8.91 per kVAh in peak hours and ₹5.31 per kVAh in solar hours (9 am to 5 pm) at up to 50% load factor. UPCL is the only licensee, so one rate applies across the state.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.85 per kVAh
100 kW1.3 lakh units1,000 sq m₹9.2 lakh
500 kW6.7 lakh units5,000 sq m₹45.9 lakh
1 MW13.4 lakh units10,000 sq m₹91.8 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Clement Town

For a rooftop array in Clement Town the strongest month is May, at about 141 units for each kW installed, and the weakest is July, at about 87. For a ground-mounted array at a 35° tilt the strongest month is March (about 142) and the weakest is July (about 78). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January100131
February104124
March131142
April137135
May141128
June123108
July8778
August8782
September100104
October119139
November105135
December102138

Somaya Solar projects near Clement Town

These are the Somaya Solar projects closest to Clement Town, with straight-line distances. They are shown as references and are not in Clement Town unless the line says so.

  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 30 km from Clement Town. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 40 km from Clement Town. Included net-metering coordination with the local electricity distribution company.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 150 km from Clement Town. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Clement Town

Which electricity company handles solar connections in Clement Town?

Uttarakhand Power Corporation Limited (UPCL) is the distribution utility for Uttarakhand and supplies Dehradun district.

Is net metering available for factories and commercial buildings in Clement Town?

Net metering up to 1 MW, within the sanctioned load. The rule is the same across Uttarakhand.

How much electricity does a solar plant generate in Clement Town?

About 1,340 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.4 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Clement Town?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 190 km from Clement Town in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 30 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Clement Town

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.