Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Roorkee, Uttarakhand.

Roorkee at a glance for solar projects

District and stateHaridwar district, Uttarakhand
Electricity supplyUttarakhand Power Corporation Limited (UPCL) is the sole distribution licensee for the whole of Uttarakhand, so it supplies Haridwar district.
Electricity regulatorUttarakhand Electricity Regulatory Commission (UERC)
State renewable energy agencyUttarakhand Renewable Energy Development Agency (UREDA)
State solar policyUttarakhand State Solar Policy, 2023 (in force until another policy replaces it; targets run to December 2027)
Rooftop metering for businessesNet metering up to 1 MW, within the sanctioned load
Modelled solar outputabout 1,380 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 140 km from Roorkee in a straight line

Solar services in Roorkee

Local points for solar projects in Roorkee

The Government of India's One District One Product (ODOP) list names Jaggery as the product of Haridwar district.

Solar output in Roorkee

A solar plant in Roorkee is modelled to produce about 1,380 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industry (RTS-5), contracted load above 88 kVA or 75 kW, load factor up to 50% energy charge of ₹6.85 per kVAh (UERC tariff order for UPCL for 2026-27, dated 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹6.60 per kVAh in the load factor slab above 50%. A demand charge also applies each month: ₹410 per kVA of billable demand for contracted load up to 1,000 kVA and ₹480 per kVA above 1,000 kVA. Time-of-day rates apply: ₹8.91 per kVAh in peak hours and ₹5.31 per kVAh in solar hours (9 am to 5 pm) at up to 50% load factor. UPCL is the only licensee, so one rate applies across the state.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.85 per kVAh
100 kW1.4 lakh units1,000 sq m₹9.5 lakh
500 kW6.9 lakh units5,000 sq m₹47.3 lakh
1 MW13.8 lakh units10,000 sq m₹94.5 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Roorkee

For a rooftop array in Roorkee the strongest month is May, at about 146 units for each kW installed, and the weakest is August, at about 96. For a ground-mounted array at a 33° tilt the strongest month is March (about 146) and the weakest is July (about 87). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January101130
February107127
March135146
April141138
May146132
June128112
July9787
August9692
September105109
October121139
November105134
December101135

Somaya Solar projects near Roorkee

These are the Somaya Solar projects closest to Roorkee, with straight-line distances. They are shown as references and are not in Roorkee unless the line says so.

  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 20 km from Roorkee. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 30 km from Roorkee. Included net-metering coordination with the local electricity distribution company.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 120 km from Roorkee. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Roorkee

Which electricity company handles solar connections in Roorkee?

Uttarakhand Power Corporation Limited (UPCL) is the sole distribution licensee for the whole of Uttarakhand, so it supplies Haridwar district.

Is net metering available for factories and commercial buildings in Roorkee?

Net metering up to 1 MW, within the sanctioned load. The rule is the same across Uttarakhand.

How much electricity does a solar plant generate in Roorkee?

About 1,380 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.8 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Roorkee?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 140 km from Roorkee in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 20 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Roorkee

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.