Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Roorkee, Uttarakhand. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Roorkee at a glance for solar projects
| District and state | Haridwar district, Uttarakhand |
|---|---|
| Electricity supply | Uttarakhand Power Corporation Limited (UPCL) is the sole distribution licensee for the whole of Uttarakhand, so it supplies Haridwar district. |
| Electricity regulator | Uttarakhand Electricity Regulatory Commission (UERC) |
| State renewable energy agency | Uttarakhand Renewable Energy Development Agency (UREDA) |
| State solar policy | Uttarakhand State Solar Policy, 2023 (in force until another policy replaces it; targets run to December 2027) |
| Rooftop metering for businesses | Net metering up to 1 MW, within the sanctioned load |
| Modelled solar output | about 1,380 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 140 km from Roorkee in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Roorkee
In Uttarakhand, a commercial or industrial consumer of UPCL can install rooftop or small solar under net metering up to 100% of the sanctioned load or contract demand, with a ceiling of 1 MW. The rule is in Regulation 37 of the regulator's renewable energy regulations of 2023, as rewritten by the first amendment of 20 June 2024.
The size limits, charges and other conditions for Uttarakhand are on the page Solar EPC Company in Uttarakhand.
In Roorkee the application for connection and metering goes to UPCL.
What a plant produces in Roorkee
A solar plant in Roorkee is modelled to produce about 1,380 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industry (RTS-5), contracted load above 88 kVA or 75 kW, load factor up to 50% energy charge of ₹6.85 per kVAh (UERC tariff order for UPCL for 2026-27, dated 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹6.60 per kVAh in the load factor slab above 50%. A demand charge also applies each month: ₹410 per kVA of billable demand for contracted load up to 1,000 kVA and ₹480 per kVA above 1,000 kVA. Time-of-day rates apply: ₹8.91 per kVAh in peak hours and ₹5.31 per kVAh in solar hours (9 am to 5 pm) at up to 50% load factor. UPCL is the only licensee, so one rate applies across the state.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.85 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹9.5 lakh |
| 500 kW | 6.9 lakh units | 5,000 sq m | ₹47.3 lakh |
| 1 MW | 13.8 lakh units | 10,000 sq m | ₹94.5 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Roorkee
The Government of India's One District One Product (ODOP) list names Jaggery as the product of Haridwar district.
EPC projects by Somaya Solar near Roorkee
These are the Somaya Solar projects closest to Roorkee, with straight-line distances. They are shown as references and are not in Roorkee unless the line says so.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 20 km from Roorkee. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 30 km from Roorkee. Included net-metering coordination with the local electricity distribution company.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 120 km from Roorkee. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Roorkee
Which electricity company handles solar connections in Roorkee?
Uttarakhand Power Corporation Limited (UPCL) is the sole distribution licensee for the whole of Uttarakhand, so it supplies Haridwar district.
Is net metering available for factories and commercial buildings in Roorkee?
Net metering up to 1 MW, within the sanctioned load. The rule is the same across Uttarakhand.
How much electricity does a solar plant generate in Roorkee?
About 1,380 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.8 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Roorkee?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 140 km from Roorkee in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 20 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Roorkee
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- District Haridwar website: Tehsil
- GeoNames (place coordinates, CC BY 4.0)
- PVGIS, European Commission Joint Research Centre (solar output model)
- UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2023, with the First Amendment of 20 June 2024 and the Second Amendment of 27 November 2025, and UERC generic tariff order of 4 June 2026
- UERC tariff order for UPCL for 2026-27, dated 30 March 2026
- UERC tariff order for UPCL for 2026-27, dated 30 March 2026 (Annexure 1, Rate Schedule RTS-5)
- Uttarakhand Electricity Regulatory Commission
- Uttarakhand State Solar Policy, 2023 (Government of Uttarakhand, published by UREDA)
- Uttarakhand State Solar Policy, 2023 (Government of Uttarakhand, published by UREDA), and UERC order of 13 October 2026 in Misc. Application No. 08 of 2026