Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Haridwar, Uttarakhand.

Haridwar at a glance for solar projects

District and stateHaridwar district, Uttarakhand
Electricity supplyUttarakhand Power Corporation Limited (UPCL) is the sole distribution licensee for the whole of Uttarakhand, so it supplies Haridwar district.
Electricity regulatorUttarakhand Electricity Regulatory Commission (UERC)
State renewable energy agencyUttarakhand Renewable Energy Development Agency (UREDA)
State solar policyUttarakhand State Solar Policy, 2023 (in force until another policy replaces it; targets run to December 2027)
Rooftop metering for businessesNet metering up to 1 MW, within the sanctioned load
Modelled solar outputabout 1,370 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 160 km from Haridwar in a straight line

Solar services in Haridwar

Haridwar: industrial estate and BHEL

The state Department of Industries lists IIE Haridwar, set up in 2003-04, among the seven Integrated Industrial Estates of SIIDCUL, the State Infrastructure and Industrial Development Corporation of Uttarakhand.

BHEL has two manufacturing plants at Haridwar, the Heavy Electricals Equipment Plant and the Central Foundry Forge Plant, by the district administration's account.

The Government of India's One District One Product (ODOP) list names Jaggery as the product of Haridwar district.

Solar output in Haridwar

A solar plant in Haridwar is modelled to produce about 1,370 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industry (RTS-5), contracted load above 88 kVA or 75 kW, load factor up to 50% energy charge of ₹6.85 per kVAh (UERC tariff order for UPCL for 2026-27, dated 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹6.60 per kVAh in the load factor slab above 50%. A demand charge also applies each month: ₹410 per kVA of billable demand for contracted load up to 1,000 kVA and ₹480 per kVA above 1,000 kVA. Time-of-day rates apply: ₹8.91 per kVAh in peak hours and ₹5.31 per kVAh in solar hours (9 am to 5 pm) at up to 50% load factor. UPCL is the only licensee, so one rate applies across the state.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹6.85 per kVAh
100 kW1.4 lakh units1,000 sq m₹9.4 lakh
500 kW6.8 lakh units5,000 sq m₹46.9 lakh
1 MW13.7 lakh units10,000 sq m₹93.8 lakh

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Solar output by month in Haridwar

For a rooftop array in Haridwar the strongest month is May, at about 144 units for each kW installed, and the weakest is July, at about 92. For a ground-mounted array at a 34° tilt the strongest month is March (about 145) and the weakest is July (about 83). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January101131
February106126
March134145
April140137
May144130
June126110
July9283
August9288
September103106
October120139
November105135
December101136

Somaya Solar projects near Haridwar

These are the Somaya Solar projects closest to Haridwar, with straight-line distances. They are shown as references and are not in Haridwar unless the line says so.

  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand (in Haridwar). Included net-metering coordination with the local electricity distribution company.
  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 10 km from Haridwar. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 110 km from Haridwar. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Haridwar

Which electricity company handles solar connections in Haridwar?

Uttarakhand Power Corporation Limited (UPCL) is the sole distribution licensee for the whole of Uttarakhand, so it supplies Haridwar district.

Is net metering available for factories and commercial buildings in Haridwar?

Net metering up to 1 MW, within the sanctioned load. The rule is the same across Uttarakhand.

How much electricity does a solar plant generate in Haridwar?

About 1,370 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.7 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Haridwar?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 160 km from Haridwar in a straight line. The closest published project is Luminous (1 MW rooftop plant) in Haridwar, about 5 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Haridwar

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.