Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Haridwar, Uttarakhand.
Haridwar at a glance for solar projects
| District and state | Haridwar district, Uttarakhand |
|---|---|
| Electricity supply | Uttarakhand Power Corporation Limited (UPCL) is the sole distribution licensee for the whole of Uttarakhand, so it supplies Haridwar district. |
| Electricity regulator | Uttarakhand Electricity Regulatory Commission (UERC) |
| State renewable energy agency | Uttarakhand Renewable Energy Development Agency (UREDA) |
| State solar policy | Uttarakhand State Solar Policy, 2023 (in force until another policy replaces it; targets run to December 2027) |
| Rooftop metering for businesses | Net metering up to 1 MW, within the sanctioned load |
| Modelled solar output | about 1,370 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 160 km from Haridwar in a straight line |
Solar services in Haridwar
- Solar EPC Company in Haridwar
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Haridwar
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Haridwar
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Haridwar
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Haridwar
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Haridwar
One contract from survey to a working plant, with approvals and handover included.
Haridwar: industrial estate and BHEL
The state Department of Industries lists IIE Haridwar, set up in 2003-04, among the seven Integrated Industrial Estates of SIIDCUL, the State Infrastructure and Industrial Development Corporation of Uttarakhand.
BHEL has two manufacturing plants at Haridwar, the Heavy Electricals Equipment Plant and the Central Foundry Forge Plant, by the district administration's account.
The Government of India's One District One Product (ODOP) list names Jaggery as the product of Haridwar district.
Solar output in Haridwar
A solar plant in Haridwar is modelled to produce about 1,370 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industry (RTS-5), contracted load above 88 kVA or 75 kW, load factor up to 50% energy charge of ₹6.85 per kVAh (UERC tariff order for UPCL for 2026-27, dated 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹6.60 per kVAh in the load factor slab above 50%. A demand charge also applies each month: ₹410 per kVA of billable demand for contracted load up to 1,000 kVA and ₹480 per kVA above 1,000 kVA. Time-of-day rates apply: ₹8.91 per kVAh in peak hours and ₹5.31 per kVAh in solar hours (9 am to 5 pm) at up to 50% load factor. UPCL is the only licensee, so one rate applies across the state.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.85 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹9.4 lakh |
| 500 kW | 6.8 lakh units | 5,000 sq m | ₹46.9 lakh |
| 1 MW | 13.7 lakh units | 10,000 sq m | ₹93.8 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Haridwar
For a rooftop array in Haridwar the strongest month is May, at about 144 units for each kW installed, and the weakest is July, at about 92. For a ground-mounted array at a 34° tilt the strongest month is March (about 145) and the weakest is July (about 83). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 101 | 131 |
| February | 106 | 126 |
| March | 134 | 145 |
| April | 140 | 137 |
| May | 144 | 130 |
| June | 126 | 110 |
| July | 92 | 83 |
| August | 92 | 88 |
| September | 103 | 106 |
| October | 120 | 139 |
| November | 105 | 135 |
| December | 101 | 136 |
Somaya Solar projects near Haridwar
These are the Somaya Solar projects closest to Haridwar, with straight-line distances. They are shown as references and are not in Haridwar unless the line says so.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand (in Haridwar). Included net-metering coordination with the local electricity distribution company.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 10 km from Haridwar. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 110 km from Haridwar. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Haridwar
Which electricity company handles solar connections in Haridwar?
Uttarakhand Power Corporation Limited (UPCL) is the sole distribution licensee for the whole of Uttarakhand, so it supplies Haridwar district.
Is net metering available for factories and commercial buildings in Haridwar?
Net metering up to 1 MW, within the sanctioned load. The rule is the same across Uttarakhand.
How much electricity does a solar plant generate in Haridwar?
About 1,370 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.7 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Haridwar?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 160 km from Haridwar in a straight line. The closest published project is Luminous (1 MW rooftop plant) in Haridwar, about 5 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Haridwar
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- Department of Industries, Uttarakhand: presentation of 12 July 2023, page 33 (Integrated Industrial Estates)
- District Haridwar website: Tehsil
- GeoNames (place coordinates, CC BY 4.0)
- Haridwar district administration: Industries
- PVGIS, European Commission Joint Research Centre (solar output model)
- UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2023, with the First Amendment of 20 June 2024 and the Second Amendment of 27 November 2025, and UERC generic tariff order of 4 June 2026
- UERC tariff order for UPCL for 2026-27, dated 30 March 2026
- UERC tariff order for UPCL for 2026-27, dated 30 March 2026 (Annexure 1, Rate Schedule RTS-5)
- Uttarakhand Electricity Regulatory Commission
- Uttarakhand State Solar Policy, 2023 (Government of Uttarakhand, published by UREDA)
- Uttarakhand State Solar Policy, 2023 (Government of Uttarakhand, published by UREDA), and UERC order of 13 October 2026 in Misc. Application No. 08 of 2026