Mussoorie at a glance for solar projects
| District and state | Dehradun district, Uttarakhand |
|---|---|
| Electricity supply | Uttarakhand Power Corporation Limited (UPCL) is the distribution utility for Uttarakhand and supplies Dehradun district. |
| Electricity regulator | Uttarakhand Electricity Regulatory Commission (UERC) |
| State renewable energy agency | Uttarakhand Renewable Energy Development Agency (UREDA) |
| State solar policy | Uttarakhand State Solar Policy, 2023 (in force until another policy replaces it; targets run to December 2027) |
| Rooftop metering for businesses | Net metering up to 1 MW, within the sanctioned load |
| Modelled solar output | about 1,330 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 210 km from Mussoorie in a straight line |
Solar services in Mussoorie
- Solar EPC Company in Mussoorie
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Mussoorie
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Mussoorie
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Mussoorie
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Mussoorie
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Mussoorie
One contract from survey to a working plant, with approvals and handover included.
Local points for solar projects in Mussoorie
The Government of India's One District One Product (ODOP) list names Bakery as the product of Dehradun district.
Solar output in Mussoorie
A solar plant in Mussoorie is modelled to produce about 1,330 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industry (RTS-5), contracted load above 88 kVA or 75 kW, load factor up to 50% energy charge of ₹6.85 per kVAh (UERC tariff order for UPCL for 2026-27, dated 30 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹6.60 per kVAh in the load factor slab above 50%. A demand charge also applies each month: ₹410 per kVA of billable demand for contracted load up to 1,000 kVA and ₹480 per kVA above 1,000 kVA. Time-of-day rates apply: ₹8.91 per kVAh in peak hours and ₹5.31 per kVAh in solar hours (9 am to 5 pm) at up to 50% load factor. UPCL is the only licensee, so one rate applies across the state.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.85 per kVAh |
|---|---|---|---|
| 100 kW | 1.3 lakh units | 1,000 sq m | ₹9.1 lakh |
| 500 kW | 6.7 lakh units | 5,000 sq m | ₹45.6 lakh |
| 1 MW | 13.3 lakh units | 10,000 sq m | ₹91.1 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Mussoorie
For a rooftop array in Mussoorie the strongest month is May, at about 141 units for each kW installed, and the weakest is July, at about 87. For a ground-mounted array at a 33° tilt the strongest month is March (about 139) and the weakest is July (about 80). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 99 | 125 |
| February | 103 | 121 |
| March | 129 | 139 |
| April | 138 | 136 |
| May | 141 | 129 |
| June | 123 | 110 |
| July | 87 | 80 |
| August | 87 | 84 |
| September | 101 | 105 |
| October | 120 | 138 |
| November | 102 | 127 |
| December | 100 | 131 |
Somaya Solar projects near Mussoorie
These are the Somaya Solar projects closest to Mussoorie, with straight-line distances. They are shown as references and are not in Mussoorie unless the line says so.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 60 km from Mussoorie. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 60 km from Mussoorie. Included net-metering coordination with the local electricity distribution company.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 160 km from Mussoorie. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Mussoorie
Which electricity company handles solar connections in Mussoorie?
Uttarakhand Power Corporation Limited (UPCL) is the distribution utility for Uttarakhand and supplies Dehradun district.
Is net metering available for factories and commercial buildings in Mussoorie?
Net metering up to 1 MW, within the sanctioned load. The rule is the same across Uttarakhand.
How much electricity does a solar plant generate in Mussoorie?
About 1,330 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.3 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Mussoorie?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 210 km from Mussoorie in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 60 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Mussoorie
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- MoHUA PMAY-Urban, List of ULBs (columns: State | District Code | District Name | City Code | Name of City | ULB Type; undated)
- PVGIS, European Commission Joint Research Centre (solar output model)
- UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2023, with the First Amendment of 20 June 2024 and the Second Amendment of 27 November 2025, and UERC generic tariff order of 4 June 2026
- UERC tariff order for UPCL for 2026-27, dated 30 March 2026 (Annexure 1, Rate Schedule RTS-5)
- UERC tariff order for UPCL, 2026-27 (30 March 2026), section 6.1
- Uttarakhand Electricity Regulatory Commission
- Uttarakhand State Solar Policy, 2023 (Government of Uttarakhand, published by UREDA)
- Uttarakhand State Solar Policy, 2023 (Government of Uttarakhand, published by UREDA), and UERC order of 13 October 2026 in Misc. Application No. 08 of 2026