Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Kurnool, Andhra Pradesh. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Kurnool at a glance for solar projects
| District and state | Kurnool district, Andhra Pradesh |
|---|---|
| Electricity supply | Southern Power Distribution Company of Andhra Pradesh Limited (APSPDCL) supplies electricity in Kurnool district, one of the districts it lists as its area. |
| Electricity regulator | Andhra Pradesh Electricity Regulatory Commission (APERC) |
| State renewable energy agency | New & Renewable Energy Development Corporation of Andhra Pradesh Limited (NREDCAP) |
| State solar policy | Andhra Pradesh Integrated Clean Energy Policy, 2024 (G.O.Ms.No.37, 30 October 2024) |
| Rooftop metering for businesses | Net metering up to 500 kWp; net billing up to 1,000 kWp; each within contracted demand |
| Modelled solar output | about 1,360 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1430 km from Kurnool in a straight line |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Kurnool
These are the rooftop limits as APERC finalised them in its order of 22 February 2024 on the Grid Interactive Solar Rooftop Photovoltaic System (Gross/Net Metering) Regulation, 2023. Check later amendments with the distribution company before relying on them.
The size limits, charges and other conditions for Andhra Pradesh are on the page Solar EPC Company in Andhra Pradesh.
In Kurnool the application for connection and metering goes to APSPDCL.
What a plant produces in Kurnool
A solar plant in Kurnool is modelled to produce about 1,360 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT Industry (General), HT-III(A), 11 kV supply energy charge of ₹6.30 per kVAh (APERC retail supply tariff order for FY 2026-27, dated 25 March 2026, in force from 1 April 2026). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is for normal hours (3 PM to 6 PM and 10 PM to midnight). The table shows the billing unit as kWh/kVAh. Time-of-day rates apply: in 11 kV supply, off-peak (10 AM to 3 PM and midnight to 6 AM) is ₹5.55. Peak (6 AM to 10 AM and 6 PM to 10 PM) is ₹7.80 in the high-demand months (April and May, September and October, February and March) and ₹7.30 in the other months. Normal-hour rates at other voltages: ₹5.85 at 33 kV, ₹5.40 at 132 kV and ₹5.35 at 220 kV. A demand charge of ₹475 per kVA per month also applies. The tariff excludes electricity duty, fuel and power purchase cost adjustment (FPPCA), true-up and other recoveries. The same schedule applies to APSPDCL, APCPDCL and APEPDCL.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹6.30 per kVAh |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹8.6 lakh |
| 500 kW | 6.8 lakh units | 5,000 sq m | ₹42.8 lakh |
| 1 MW | 13.6 lakh units | 10,000 sq m | ₹85.7 lakh |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Kurnool: industrial areas
APIIC, the Andhra Pradesh Industrial Infrastructure Corporation, lists Bpcl-Kurnool, Ie_Kurnool, Ie_Kurnool_Exp_Ph_I, Ie_Kurnool_Expn_Iii, IP-Kurnool Mega Industrial Hub and Seie-Kurnool among its industrial areas in Kurnool district.
The Government of India's One District One Product (ODOP) list names Stone carved products, Kodumuru Gadwal Sarees and Yemmiganuru Bedsheets as the products of Kurnool district.
EPC projects by Somaya Solar near Kurnool
These are the Somaya Solar projects closest to Kurnool, with straight-line distances. They are shown as references and are not in Kurnool unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 920 km from Kurnool. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1350 km from Kurnool. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1450 km from Kurnool. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Kurnool
Which electricity company handles solar connections in Kurnool?
Southern Power Distribution Company of Andhra Pradesh Limited (APSPDCL) supplies electricity in Kurnool district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Kurnool?
Net metering up to 500 kWp; net billing up to 1,000 kWp; each within contracted demand. The rule is the same across Andhra Pradesh.
How much electricity does a solar plant generate in Kurnool?
About 1,360 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.6 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Kurnool?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1430 km from Kurnool in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 920 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Kurnool
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- APERC final order dated 22 February 2024 on the APERC (Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulation, 2023 (Regulation 4 of 2023)
- APERC retail supply tariff order for FY 2026-27, dated 25 March 2026
- APERC retail supply tariff order for FY 2026-27, dated 25 March 2026 (Chapter XI, Table 11)
- APIIC, List of APIIC Industrial Parks, Undeveloped Lands (UDL) & Private Industrial Parks in Andhra Pradesh
- APSPDCL recruitment notification, 24 June 2026
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- G.O.Ms.No.26, Energy (Power-II) Department, 28 February 2025, operational guidelines for the Andhra Pradesh Integrated Clean Energy Policy, 2024
- GeoNames (place coordinates, CC BY 4.0)
- MoHUA PMAY-Urban, "Details of Urban Local bodies and Areas under ..." (List-of-ULB.pdf), row: State | District code | District | City code | ULB name | ULB type
- PVGIS, European Commission Joint Research Centre (solar output model)