Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Secunderabad, Telangana. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.

Secunderabad at a glance for solar projects

District and stateHyderabad district, Telangana
Electricity supplySouthern Power Distribution Company of Telangana Limited (TGSPDCL) supplies electricity in Hyderabad district, one of the districts it lists as its area.
Electricity regulatorTelangana Electricity Regulatory Commission (TGERC)
State renewable energy agencyTelangana Renewable Energy Development Corporation Limited (TGREDCO)
State solar policyTelangana Clean and Green Energy Policy, 2025 (G.O.Ms.No.2 of 11 January 2025, in operation for 10 years)
Rooftop metering for businessesNet metering up to 500 kWp and gross metering up to 1 MWp, within 80% of sanctioned load for industrial and commercial consumers
Modelled solar outputabout 1,370 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 1240 km from Secunderabad in a straight line

What our EPC scope covers

An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.

  • Site survey and a study of your electricity use and bills
  • Plant design, drawings and equipment selection
  • Supply of modules, inverters, mounting structures and electrical equipment
  • Installation, testing and commissioning
  • Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
  • Operation and maintenance after handover, where contracted

More detail: Solar EPC Company across India.

Connecting a plant to the grid in Secunderabad

In Telangana, a commercial or industrial consumer can install rooftop solar under net metering up to 500 kWp, or under gross metering up to 1 MWp. The plant may not be larger than 80% of the sanctioned load or contracted demand. The rules are in the TGERC Rooftop Solar PV Grid Interactive Systems Regulation, 2025, notified on 15 November 2025.

The size limits, charges and other conditions for Telangana are on the page Solar EPC Company in Telangana.

In Secunderabad the application for connection and metering goes to TGSPDCL.

What a plant produces in Secunderabad

A solar plant in Secunderabad is modelled to produce about 1,370 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT-I(A) Industry General, 11 kV energy charge of ₹7.65 per unit (TGERC Retail Supply Tariff Order for FY 2026-27, in force from 1 April 2026 to 31 March 2027). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹7.15 per unit at 33 kV and ₹6.65 at 132 kV and above. It is the same for TGSPDCL and TGNPDCL. A demand charge of ₹500 per kVA per month also applies. It is charged on the maximum demand recorded in the month or 80% of the contracted demand, whichever is higher. A minimum energy charge of 50 kVAh per kVA of billing demand per month applies. Time-of-day: plus ₹1.50 per unit from 6 am to 10 am and 6 pm to 10 pm, and less ₹0.50 per unit from 10 am to 6 pm. Fuel surcharge adjustment is extra, and the rates exclude electricity duty.

Plant sizeModelled output a yearShadow-free roof needed (typical)Value at ₹7.65 per unit
100 kW1.4 lakh units1,000 sq m₹10.5 lakh
500 kW6.8 lakh units5,000 sq m₹52.4 lakh
1 MW13.7 lakh units10,000 sq m₹1.05 crore

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Local points for solar projects in Secunderabad

The Government of India's One District One Product (ODOP) list names Studded gold jewllery as the product of Hyderabad district.

EPC projects by Somaya Solar near Secunderabad

These are the Somaya Solar projects closest to Secunderabad, with straight-line distances. They are shown as references and are not in Secunderabad unless the line says so.

  • KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 730 km from Secunderabad. Completed, including the transmission line work coordinated with the local distribution company.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1160 km from Secunderabad. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1270 km from Secunderabad. In progress. Site access was difficult and was handled with local support.

See all published projects

Questions about solar projects in Secunderabad

Which electricity company handles solar connections in Secunderabad?

Southern Power Distribution Company of Telangana Limited (TGSPDCL) supplies electricity in Hyderabad district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Secunderabad?

Net metering up to 500 kWp and gross metering up to 1 MWp, within 80% of sanctioned load for industrial and commercial consumers. The rule is the same across Telangana.

How much electricity does a solar plant generate in Secunderabad?

About 1,370 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.7 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Secunderabad?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1240 km from Secunderabad in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 730 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Secunderabad

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image