Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Telangana. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Telangana at a glance for solar projects
| Electricity regulator | Telangana Electricity Regulatory Commission (TGERC) |
|---|---|
| State renewable energy agency | Telangana Renewable Energy Development Corporation Limited (TGREDCO) |
| Electricity distribution | TGSPDCL (Hyderabad and the areas of the old Ranga Reddy, Nalgonda, Medak and Mahabubnagar districts (the area in its licence; some districts have since been split)); TGNPDCL (Warangal, Khammam, Karimnagar, Nizamabad and Adilabad (the old districts in its licence; some have since been split). It also serves Rajanna Sircilla district, taken over from the Co-operative Electric Supply Society, Sircilla, on a transitional basis.); TGRPDCL (Licensed on 10 July 2026 for farm, lift irrigation, Mission Bhagiratha and municipal or Hyderabad Metro Water supply connections only. It does not serve commercial or industrial consumers, who stay with TGSPDCL or TGNPDCL.) |
| State solar policy | Telangana Clean and Green Energy Policy, 2025 (G.O.Ms.No.2 of 11 January 2025, in operation for 10 years) |
| Rooftop metering for businesses | Net metering up to 500 kWp and gross metering up to 1 MWp, within 80% of sanctioned load for industrial and commercial consumers |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Telangana
In Telangana, a commercial or industrial consumer can install rooftop solar under net metering up to 500 kWp, or under gross metering up to 1 MWp. The plant may not be larger than 80% of the sanctioned load or contracted demand. The rules are in the TGERC Rooftop Solar PV Grid Interactive Systems Regulation, 2025, notified on 15 November 2025.
- The 2025 regulation repealed the earlier Regulation No. 6 of 2016 (net metering) and its amendments. Existing net metering users above 500 kWp keep net metering.
- Under net metering, if a consumer exports more than it imports in a billing period, the excess units are paid at the lowest tariff of the solar power purchase agreements the distribution companies signed in the previous financial year. They are adjusted in the next bill or paid into the consumer's bank account.
- A TGERC proceeding of 29 December 2025 sets this settlement rate at ₹2.57 per unit, from the date the regulation was notified until the Commission issues a new proceeding.
- Under gross metering, the distribution company buys all the solar energy at the same rate and bills the consumer separately for all its consumption.
- Group net metering is open only to domestic (LT-I) consumers and townships and residential colonies, below 100 kWp. Virtual net metering is open to all categories except temporary supply, below 100 kWp, for participating consumers of the same category in the same licensee's area.
- The total rooftop capacity on one distribution transformer may not exceed 50% of its rated capacity. For HT consumers the same 50% limit applies to the 11 kV or 33 kV feeder's maximum permitted load, or to the substation capacity.
- The regulation has no net billing arrangement. TGERC's list of final regulations, checked on 18 November 2026, shows no later amendment of it.
What a plant produces in Telangana
Solar output changes across Telangana with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,340 to 1,380 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Hyderabad | 1,380 | 1,400 |
| Karimnagar | 1,360 | 1,390 |
| Nizamabad | 1,370 | 1,400 |
| Ramagundam | 1,350 | 1,390 |
| Ramgundam | 1,350 | 1,380 |
| Secunderabad | 1,370 | 1,400 |
| Warangal | 1,340 | 1,370 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Questions about solar projects in Telangana
Is net metering available for factories and commercial buildings in Telangana?
In Telangana, a commercial or industrial consumer can install rooftop solar under net metering up to 500 kWp, or under gross metering up to 1 MWp. The plant may not be larger than 80% of the sanctioned load or contracted demand. The rules are in the TGERC Rooftop Solar PV Grid Interactive Systems Regulation, 2025, notified on 15 November 2025.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Telangana
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- PVGIS, European Commission Joint Research Centre (solar output model)
- TGERC (Rooftop Solar PV Grid Interactive Systems) Regulation, 2025 (Regulation No. 1 of 2025), Telangana Gazette of 15 November 2025; TGERC proceedings of 29 December 2025 on the settlement rate
- TGERC common order of 10 July 2026 in O.P. Nos. 11, 14 and 15 of 2026 (licence of TGRPDCL; amendment of the licences of TGNPDCL and TGSPDCL), paragraphs 1.18 to 1.25 and chapter 5
- Telangana Clean and Green Energy Policy, 2025 (G.O.Ms.No.2, Energy Department, 11 January 2025), section 5, which names TGGENCO and TGREDCO as nodal agencies; TGREDCO website
- Telangana Clean and Green Energy Policy, 2025, G.O.Ms.No.2 (Energy Department), dated 11 January 2025
- Telangana Electricity Regulatory Commission