Somaya Solar Solutions Limited is a solar EPC company based in Ghaziabad, Uttar Pradesh. We design, supply, install and commission solar plants for factories, commercial buildings, institutions, landowners and PM-KUSUM developers in Secunderabad, Telangana.
Secunderabad at a glance for solar projects
| District and state | Hyderabad district, Telangana |
|---|---|
| Electricity supply | Southern Power Distribution Company of Telangana Limited (TGSPDCL) supplies electricity in Hyderabad district, one of the districts it lists as its area. |
| Electricity regulator | Telangana Electricity Regulatory Commission (TGERC) |
| State renewable energy agency | Telangana Renewable Energy Development Corporation Limited (TGREDCO) |
| State solar policy | Telangana Clean and Green Energy Policy, 2025 (G.O.Ms.No.2 of 11 January 2025, in operation for 10 years) |
| Rooftop metering for businesses | Net metering up to 500 kWp and gross metering up to 1 MWp, within 80% of sanctioned load for industrial and commercial consumers |
| Modelled solar output | about 1,370 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1240 km from Secunderabad in a straight line |
Solar services in Secunderabad
- Solar EPC Company in Secunderabad
Design, supply, installation and commissioning of rooftop and ground-mounted plants under one contract. - Commercial & Industrial Solar in Secunderabad
Rooftop solar for factories, warehouses, institutions and commercial buildings. - Ground-Mounted Solar Plant in Secunderabad
Solar plants on open land for captive use or sale of power. - Utility-Scale Solar in Secunderabad
Megawatt-scale plants that feed the grid or supply large consumers. - PM-KUSUM in Secunderabad
EPC for farmer-owned and feeder-level solar plants under the PM-KUSUM scheme. - Turnkey Solar EPC in Secunderabad
One contract from survey to a working plant, with approvals and handover included.
Local points for solar projects in Secunderabad
The Government of India's One District One Product (ODOP) list names Studded gold jewllery as the product of Hyderabad district.
Solar output in Secunderabad
A solar plant in Secunderabad is modelled to produce about 1,370 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt. The last column values that energy at the HT-I(A) Industry General, 11 kV energy charge of ₹7.65 per unit (TGERC Retail Supply Tariff Order for FY 2026-27, in force from 1 April 2026 to 31 March 2027). It leaves out fixed and demand charges, surcharges, duty and the effect of the metering rules, so it is a rough guide, not a savings promise. The rate is ₹7.15 per unit at 33 kV and ₹6.65 at 132 kV and above. It is the same for TGSPDCL and TGNPDCL. A demand charge of ₹500 per kVA per month also applies. It is charged on the maximum demand recorded in the month or 80% of the contracted demand, whichever is higher. A minimum energy charge of 50 kVAh per kVA of billing demand per month applies. Time-of-day: plus ₹1.50 per unit from 6 am to 10 am and 6 pm to 10 pm, and less ₹0.50 per unit from 10 am to 6 pm. Fuel surcharge adjustment is extra, and the rates exclude electricity duty.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) | Value at ₹7.65 per unit |
|---|---|---|---|
| 100 kW | 1.4 lakh units | 1,000 sq m | ₹10.5 lakh |
| 500 kW | 6.8 lakh units | 5,000 sq m | ₹52.4 lakh |
| 1 MW | 13.7 lakh units | 10,000 sq m | ₹1.05 crore |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Solar output by month in Secunderabad
For a rooftop array in Secunderabad the strongest month is March, at about 139 units for each kW installed, and the weakest is July, at about 85. For a ground-mounted array at a 23° tilt the strongest month is March (about 142) and the weakest is July (about 80). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 127 | 141 |
| February | 125 | 133 |
| March | 139 | 142 |
| April | 131 | 127 |
| May | 132 | 124 |
| June | 103 | 95 |
| July | 85 | 80 |
| August | 93 | 90 |
| September | 96 | 95 |
| October | 114 | 119 |
| November | 111 | 121 |
| December | 119 | 133 |
Somaya Solar projects near Secunderabad
These are the Somaya Solar projects closest to Secunderabad, with straight-line distances. They are shown as references and are not in Secunderabad unless the line says so.
- KUSUM-C, Ram Sati Devi: 2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni, Madhya Pradesh, about 730 km from Secunderabad. Completed, including the transmission line work coordinated with the local distribution company.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1160 km from Secunderabad. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- KUSUM-A, Bhavnath Singh: 2.4 MW ground-mounted plant under PM-KUSUM Component A, Amroha, Uttar Pradesh, about 1270 km from Secunderabad. In progress. Site access was difficult and was handled with local support.
Questions about solar projects in Secunderabad
Which electricity company handles solar connections in Secunderabad?
Southern Power Distribution Company of Telangana Limited (TGSPDCL) supplies electricity in Hyderabad district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Secunderabad?
Net metering up to 500 kWp and gross metering up to 1 MWp, within 80% of sanctioned load for industrial and commercial consumers. The rule is the same across Telangana.
How much electricity does a solar plant generate in Secunderabad?
About 1,370 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.7 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Secunderabad?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1240 km from Secunderabad in a straight line. The closest published project is KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C) in Katni, about 730 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Secunderabad
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 18 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- MoHUA PMAY-Urban, "Details of Urban Local bodies and Areas under ..." (List-of-ULB.pdf), row: State | District code | District | City code | ULB name | ULB type
- PVGIS, European Commission Joint Research Centre (solar output model)
- TGERC (Rooftop Solar PV Grid Interactive Systems) Regulation, 2025 (Regulation No. 1 of 2025), Telangana Gazette of 15 November 2025; TGERC proceedings of 29 December 2025 on the settlement rate
- TGERC Retail Supply Tariff Order: FY 2026-27, Appendix A (Abstract of the Retail Supply Tariff for FY 2026-27), pages 289 to 294
- TGERC common order of 10 July 2026 (TGRPDCL), paragraphs 1.24 and 1.25
- Telangana Clean and Green Energy Policy, 2025 (G.O.Ms.No.2, Energy Department, 11 January 2025), section 5, which names TGGENCO and TGREDCO as nodal agencies; TGREDCO website
- Telangana Clean and Green Energy Policy, 2025, G.O.Ms.No.2 (Energy Department), dated 11 January 2025
- Telangana Electricity Regulatory Commission